Powered By Kitlog Pro v2.0
Peters Web Site
CH650B
Empennage
Work Logs Found:
48
Category Work Time:
101 Hours
Date
Hours
Work Log Summary
Details
01-31-2009
1.50
Rivet remaining Elevator
Details
01-25-2009
2.00
rivet elevator horn and side
Details
01-24-2009
1.00
rivet elevator ribs
Details
01-18-2009
4.50
Elevator trim servo installation
Details
01-11-2009
2.00
Elevator Trim tab
Details
11-01-2008
1.00
trimmed the horn doubler and installed the lower h
Details
11-01-2008
2.00
made upper and lower elevator and drilled doubler
Details
11-01-2008
1.00
Cutout for elevator horn (top and bottom)
Details
11-01-2008
1.00
attached the angle 6t3-7 to the elevator
Details
11-01-2008
1.50
attached elevator horn
Details
10-17-2008
3.00
Drill hinge on elevator
Details
07-13-2008
1.50
drilled and cleco'd the bottom and top flanges on
Details
07-12-2008
1.50
center ribs and inboard and outboard ribs drilled
Details
07-11-2008
3.00
FTT Rib and End Rib installation on Stab
Details
06-14-2008
2.00
Reassembled H-Stab and riveted
Details
06-13-2008
5.00
Drilled elevator piano hinge
Details
06-08-2008
4.00
Installed End Ribs
Details
06-07-2008
6.00
clamped stab to table and drilled
Details
05-28-2008
2.00
trimmed top front corner attachments and ready for
Details
05-23-2008
1.50
Reinstalled and riveted bottom skin
Details
05-22-2008
3.00
drilled elevator bottom skin
Details
05-20-2008
2.00
Braced the Skeleton onto the Bench and placed Skin
Details
05-11-2008
5.50
Deburred, cleaned, painted and riveted Hstab Skele
Details
05-08-2008
2.50
Attached the L Angles to the spars and drilled out
Details
05-07-2008
1.50
Drilled Ribs to Rear Spar and made 4 L - Angles
Details
05-06-2008
1.00
Marked clamped and drilled all ribs to front spar
Details
05-06-2008
2.00
drilled and cleco'd 6T2-3 Rear Spar attachment
Details
05-04-2008
2.00
Drilled Shim and cleco'd to the rear spar.
Details
05-04-2008
2.00
Cut Rear Spar attachment per the drawings
Details
05-04-2008
1.00
Attached the doublers 6T1-6HD and 6T1-7HD to rear
Details
05-03-2008
1.00
Marked the rear spar attachment for cutting
Details
05-03-2008
2.00
Created Plywood Template block for front spar
Details
05-03-2008
4.00
attachment 6T2-2 and 6T2-1 to front spar
Details
04-27-2008
2.00
drilled the doublers on the front spars
Details
04-13-2008
1.00
Lined up and clamped doublers front spar
Details
03-26-2008
1.00
Inventory Tail Kit
Details
03-18-2008
3.00
Rassembled rudder, trimmed nose skin, and riveted
Details
03-17-2008
2.00
Dissassembled rudder and prepared for reassembly
Details
03-16-2008
0.00
pic of the cleko'd rudder incl the nose skin
Details
03-16-2008
3.00
Fitted the nose skin. drilled and cleko'd
Details
03-15-2008
4.00
Drilled and Cleko'd Trailing edge skin
Details
03-14-2008
2.00
Riveted the ribs and spar
Details
03-12-2008
0.10
received part 6T5-5
Details
03-12-2008
1.00
Drilled 6T5-5 and painted cortec anti corrosion
Details
03-05-2008
0.50
Ordered 6T5-5, Tail Kit, and Drawings
Details
03-05-2008
0.50
Deburred all drill holes, and clean.
Details
03-04-2008
2.00
Drill ribs 2, 3 and 4
Details
02-24-2008
2.00
Rudder Doublers and Bottom rib
Details
SITE NAVIGATION
Contact Builder
CH650B Home
Category
# Logs
# Hours
All
58
115
Empennage
48
101
Miscellaneous
3
0
Wings
7
14
Copyright © 2001-2025 Matronics. All Rights Reserved.