Powered By Kitlog Pro v2.0
Kevin Waterfords Web Site
RV-7A
Wings
Work Logs Found:
59
Category Work Time:
205 Hours
Date
Hours
Work Log Summary
Details
04-10-2013
5.00
Wings Finished
02-18-2013
10.00
Fiberglass Wing Tips
02-10-2013
6.00
Fiberglass Wing Tips
02-04-2013
15.00
Wing Tips and Ailerons
12-28-2012
4.00
Installed Taxi/landing light on the right wing
10-27-2012
3.00
Completed the landing light install for the left w
Details
10-07-2012
2.00
Cut the opening in the left leading edge for the
Details
09-11-2012
1.00
Piano Hinge for the left flap attachment
Details
09-06-2012
3.00
Attached the flaps and aileron to the left wing.
Details
09-01-2012
4.00
Riveting the flap hinge
Details
08-30-2012
3.00
Completed the riveting of the bottom skins on the
Details
08-26-2012
5.00
Riveting the bottom skins on the left wing
Details
11-12-2011
4.00
Fuel tank
Details
11-11-2011
2.00
Dimpled Wing skins
Details
09-23-2009
1.00
Right Aileron
Details
09-22-2009
1.00
Riveting the bottom skins of the right aileron
Details
09-21-2009
2.00
Riveting the Right Aileron
Details
09-20-2009
4.00
Riveting the Right wing skin
Details
09-08-2009
2.00
Right Aileron
Details
09-07-2009
3.00
Right Aileron
Details
09-06-2009
3.00
Right Aileron
Details
09-05-2009
3.00
Right Aileron
Details
08-31-2009
2.00
Began assembling the right aileron
08-30-2009
4.00
Riveting the right wing's bottom skins
08-21-2009
2.00
Riveted the flap brace
Details
08-19-2009
1.00
Rebuilt the Aileron hinge
Details
08-16-2009
5.00
Riveted the outboard top skin
Details
08-09-2009
6.00
Riveting the Top Skins of the right wing
Details
07-07-2009
3.00
Riveted the outboard section of the leading edge.
Details
07-06-2009
2.00
Riveting the outboard section of the leading edge
Details
07-05-2009
2.00
Removed 4 rivets in the rear wing spar
Details
06-15-2009
4.00
Right Wing
Details
06-14-2009
3.00
Right Wing Leading Edge
Details
06-09-2009
2.00
Replacing rivets on the Right Fuel tank
Details
06-05-2009
6.00
Completing the Right Fuel Tank
Details
06-01-2009
6.00
Right fuel tank
Details
05-30-2009
5.00
Right Fuel Tank
Details
05-26-2009
3.00
Right Fuel Tank
Details
05-20-2009
3.00
Fuel tanks
Details
05-02-2009
1.00
EAA Technical Advisor Sign-off
Details
04-27-2009
2.00
Right Fuel Tank
Details
04-26-2009
4.00
Right Fuel Tank
Details
04-18-2009
4.00
Right wing leading edge.
Details
04-17-2009
4.00
Right Wing
Details
04-12-2009
4.00
Drilled rivet holes in the skin to full size
Details
04-05-2009
4.00
Right Wing skin drilled hoes to full size
Details
03-29-2009
4.00
Right wing
Details
03-22-2009
4.00
Right wings
Details
03-16-2009
3.00
Main Spars
Details
03-15-2009
4.00
Right Wing
Details
03-14-2009
3.00
Wing Ribs and Spars
Details
02-01-2009
2.00
Rear wing spars
Details
11-02-2008
3.00
Left Main Wing Spar
Details
11-01-2008
3.00
Left Main Wing Spar
Details
10-26-2008
3.00
Right main wing spar
Details
10-25-2008
3.00
Preparing the main wing spars
Details
10-23-2008
2.00
Build the wing stands
Details
10-20-2008
2.00
Inventoried wing kit
05-02-2008
1.00
Wing Kit Arrives
Details
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
126
354
Empennage
56
112
Engine
1
3
Fuselage
2
8
Miscellaneous
1
12
None
3
5
Shop Supplies
2
6
Tools
2
3
Wings
59
205
Copyright © 2001-2024 Matronics. All Rights Reserved.