Tim and Darren Aussie Web Site
Sportsman
Final Assembly
Work Logs Found:
79
Category Work Time:
721 Hours
Date
Hours
Work Log Summary
Details
05-16-2010
1.00
Final paint
Details
05-15-2010
1.00
Final paint
Details
05-15-2010
1.00
Final paint
05-15-2010
1.00
Final paint
05-15-2010
1.00
Final paint
05-15-2010
1.00
Final paint
05-15-2010
1.00
Final paint
05-15-2010
1.00
Final paint
12-19-2009
2.00
Washing the aircraft
Details
12-19-2009
1.00
Run ups
Details
12-19-2009
4.00
Pictures of rear seating area
Details
12-19-2009
2.00
Fitting closure covers
Details
12-19-2009
4.00
Finishing the front area
Details
12-19-2009
1.00
Covers fitted at the rear
Details
12-16-2009
4.00
Rear seat completion
Details
12-16-2009
4.00
Final installation in the front
Details
12-12-2009
1.00
Signage fitted
Details
12-12-2009
16.00
Install of the front window
Details
12-12-2009
1.00
Extend the breather hose
Details
09-27-2009
12.00
Clamping hoses
Details
08-16-2009
30.00
Fitting of upper & lower cowling
Details
07-04-2009
6.00
Fitting carpet
Details
07-04-2009
6.00
Fitting battery and external power supply
Details
07-04-2009
2.00
Central computer system
Details
06-25-2009
12.00
Installation of the cowling
Details
06-25-2009
2.00
Fix front lights
Details
06-25-2009
16.00
Fitting roof lining
Details
06-18-2009
2.00
Correct tension on cables
Details
06-13-2009
4.00
Seat installation
Details
06-09-2009
3.00
Fabric on the windscreen glare sheild
Details
06-06-2009
20.00
Preparing and installing windows
Details
06-06-2009
10.00
Panel installation
Details
06-06-2009
6.00
Installing air vents
Details
06-06-2009
6.00
Battery mount and position
Details
06-06-2009
6.00
Base for auto pilot
Details
05-16-2009
10.00
Fabricating and installing the front fairing
Details
04-29-2009
8.00
Replace brake fluid
Details
04-25-2009
4.00
Installing the strobe power pack
Details
04-25-2009
8.00
Installation of fuel caps
Details
04-25-2009
4.00
Front wheel fairing
Details
04-18-2009
10.00
Installing wing tip lights and cut out for counter
Details
04-18-2009
8.00
Install the aileron counterweights
Details
04-18-2009
20.00
Cross over cable guides
Details
04-18-2009
2.00
Clsoing wing tips and new hanger picture
Details
11-22-2008
12.00
Re - Fit Aileron and rudder
Details
11-15-2008
12.00
Cove skin installation
Details
10-26-2008
15.00
Fitting seat belt brackets...finished rear seat
Details
10-19-2008
8.00
Fitting the back seat
Details
10-18-2008
10.00
Side laminates
Details
10-18-2008
12.00
Rear seat installation
Details
10-01-2008
10.00
Fitting the lower hatch half to upper half
Details
09-30-2008
16.00
Wing-Fold Hatch mounting flanges
Details
09-30-2008
2.00
Added fixture bolt and nut to counter weight eleva
Details
09-23-2008
8.00
Seam the wingtip fairing halves together
Details
09-23-2008
16.00
Cove skins installation
Details
09-17-2008
4.00
Install fuel tank sump drains
Details
09-10-2008
4.00
Fuel tank vent line installation at wingtip
Details
09-06-2008
8.00
Install wings on the fuselage
Details
09-01-2008
4.00
Connect the fuel tank vents and
Details
08-14-2008
20.00
Rivett the upper wing skins
Details
08-07-2008
6.00
Doors: Latches. dogs,
Details
08-01-2008
20.00
Door installation: Install seal, secure door, inst
Details
07-13-2008
6.00
Install fuel floats to tanks
Details
07-06-2008
70.00
Rivett the upper wing skins
Details
07-05-2008
10.00
Cleco the upper surface hat section stiffeners to
Details
06-30-2008
30.00
Final Wing Assembly
Details
06-02-2008
10.00
Wires in order and checking inside the wing
Details
06-02-2008
4.00
Strakes flanges to the fuselage and rudder fairing
Details
06-02-2008
30.00
Fixing strakes to fuselage
Details
05-13-2008
30.00
Making and fixing fairings to strut
Details
05-13-2008
1.00
Laminate the strut
Details
05-13-2008
5.00
Install the outboard bracket/wheel fairing
Details
05-13-2008
1.00
Bond the foam together
Details
05-12-2008
16.00
Fuselage fairing installation
Details
05-12-2008
20.00
Fasten the firwall assembly to the fuselage
Details
04-12-2008
20.00
Fit the firewall to the fusealge and drill the tab
Details
04-12-2008
10.00
Fabricate the firewall components
Details
04-12-2008
2.00
Fabricate and install the instrument panel angle
Details
12-06-2007
4.00
Fabricate and install the elevator control stop
Details
SITE NAVIGATION
Contact Builder
Sportsman Home
Category
# Logs
# Hours
All
184
1500
Avionics
5
172
Engine
16
132
Final Assembly
79
721
Fuselage
40
219
Miscellaneous
3
7
Prop
1
12
System Installation
40
237