Powered By Kitlog Pro v2.0
Marlins Web Site
RV-7A
Fuselage
Work Logs Found:
72
Category Work Time:
373 Hours
Date
Hours
Work Log Summary
Details
09-23-2024
5.00
Fabricate & Install N-Numbers
Details
08-02-2024
6.00
Install Cockpit Floor, Install new ELT Battery
Details
02-27-2019
17.00
More Cosmetic Body-Work
Details
02-26-2019
3.00
Polyester-Epoxy Filler for Rivet Imperfections
Details
02-14-2019
12.00
Riveted Forward Avionics Deck
Details
01-28-2019
10.00
Riveted Turtle Deck (Upper Aft Skin)
Details
12-07-2018
4.00
Upper Aft Fuselage Skin
Details
12-03-2018
3.00
Modify Cockpit Access Panel Firewall Bulkhead
Details
11-21-2018
4.00
Install Baggage & CTR Console Panels
Details
11-20-2018
3.00
Began to go through all previous building plans
Details
02-10-2015
8.50
Installing the Whisperflow SV Ventilators
Details
02-09-2015
11.00
Installing fresh air ventilators and CAT ducting
Details
05-05-2010
3.00
Install the GRT AHRS Mounting Bracket
Details
05-03-2010
3.00
Install AHRS Bracket
Details
08-08-2009
4.00
Install Rudder Cable & Fabricated
Details
05-28-2009
1.00
More pics of access panels
Details
05-27-2009
4.00
Install Nutplates & Access Panels on Aft Elevator
Details
04-07-2009
3.50
Installed Flap Positioning System and Wiring
Details
04-05-2009
2.50
Install ELT Mounting Bracket
Details
04-04-2009
3.00
Dual Brake lines installed (Bonaco Brained Steel)
04-01-2009
0.00
Dual System Bonaco Brake Lines Installed
Details
04-01-2009
0.00
Bonaco Brake Lines installed
03-31-2009
1.00
Dual Brake lines installed
Details
03-30-2009
8.00
Install Bonaco Fuel Lines Valve to Wings
Details
03-28-2009
13.50
Fuel Line--Fuel Pump to Engine & Wing Vent Lines
Details
03-15-2009
3.00
Installing fuel lines from boost pump to engine
Details
03-14-2009
1.00
Fuel Pump Assembly -- Continued
Details
03-13-2009
13.00
Airflow Performance Fuel Boost Pump Assembly
Details
03-06-2009
3.00
Assembling Aerflow Performance Fuel Pump
Details
03-01-2009
6.00
Painting the cockpit in "Hammered Aluminum"
Details
02-28-2009
18.00
Installing High Pressure Electric Fuel Pump Cover
Details
02-14-2009
10.00
Removed wings, added nutplates for bottom skin, fi
Details
02-09-2009
1.00
Setting Flap Extension
Details
02-07-2009
3.00
Re-rigging the ailerons & flaps
Details
02-06-2009
0.00
Flap pushrod holes from the side of the fuselage
Details
02-05-2009
3.00
Cutting the flap push rod holes in the fuselage
Details
01-05-2009
2.00
Leveling the fuselage to prepare for wing sweep
Details
01-02-2009
6.00
Building wing-mount stands
Details
12-28-2008
10.00
Preparation to attach wings to the fuselage
Details
09-15-2008
14.00
Main Landing Gear Mounts
Details
08-23-2008
6.00
More Stick Boot Ring Fabrication
Details
08-21-2008
2.00
Fabrication of Stick Boot Rings
Details
08-19-2008
8.00
Center Console Fabrication and Installation
Details
08-11-2008
3.00
Electrical Conduit in the baggae area
Details
08-06-2008
3.00
Installing the strobe pack mounting bracket
Details
08-05-2008
1.50
Shoulder Harness Cable rub blocks
Details
08-02-2008
6.00
Installing the F-6111 ribs to the aft top skin
Details
07-29-2008
2.00
Fit the forward top skin; aft fuselage
Details
07-27-2008
3.00
Fabricated and installed Elevator Bellcrank
07-21-2008
5.00
Fabricate rear canopy plate
Details
07-12-2008
9.00
Completed Rudder Pedal and Brake Assembly installe
Details
07-11-2008
6.00
Fabricate and install the rudder pedals and brakes
Details
07-07-2008
4.50
Cut Holes for Landing Gear Sockets and Brake Lines
Details
06-30-2008
4.00
Finished the external steps
Details
06-21-2008
14.00
Cut the holes for the external steps
Details
06-18-2008
2.50
Tail tie down assembly
Details
06-11-2008
2.50
Installed rivets in Bulkhead
Details
06-08-2008
10.00
Assembled and mounted control column
Details
06-02-2008
2.00
Installed rivets in bulkhead side channels
Details
06-01-2008
10.00
Started Fabricating Seatback Brace Receiver Plates
Details
05-31-2008
4.00
Installed Electrical Grommets and Marked Firewall
Details
05-30-2008
0.00
Pictures of the Fuselage
Details
05-30-2008
0.00
More Pictures of the fuselage
Details
05-29-2008
7.00
Fabricated Brackets for Control Stick Access
Details
05-29-2008
5.00
Brake Bracket & Firewall Recess
Details
05-28-2008
15.00
Finished Right and Left Seat Back
Details
05-10-2008
2.00
Cut and attach hinges to braces
Details
05-09-2008
1.00
Tunnel Cover between seat backs
Details
05-08-2008
4.00
Tunnel Cover between the seat backs
Details
05-07-2008
2.50
Seat Braces and Angle Braces
Details
05-05-2008
1.00
More work on seat back braces
Details
05-05-2008
1.50
Fabricate Seat Backs
Details
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
743
6299
Avionics
18
273
Cockpit Upholstery
7
47
Constant Speed Prop
14
92
Controls
26
155
Cowling
58
448
Electrical System
87
1087
Empennage
81
712
Engine
37
246
Engine Air-Baffles
50
344
Fiberglass Priming
2
36
Firewall Forward
6
60
Fuselage
72
373
Ground & Flight Test
4
52
Hangar
10
22
Hanger
10
22
Instrument Panel
19
226
IO360-M!B Engine
4
67
Landing Gear
22
283
None
8
59
Ops Manuals
2
77
Pitot-Static System
6
55
Prop
4
10
Propeller
4
10
Quickbuild fuselage
6
2
Shop, Supplies, and
9
50
Sliding Canopy
39
378
Weight & Balance
2
7
Wheel Pants/Fairings
26
323
Wheels
10
67
Wheels & Brakes
10
67
Windshield/Roll Bar
12
116
Wings
69
483
Workshop & Tools
9
50
Copyright © 2001-2024 Matronics. All Rights Reserved.