KitLog pro

Powered By Kitlog Pro v2.0

Marlins Web Site
Work Logs Found: 72
Category Work Time: 373 Hours
 Date
Hours
Work Log Summary

Details

 09-23-2024
5.00
Fabricate & Install N-Numbers
Details
       

 08-02-2024
6.00
Install Cockpit Floor, Install new ELT Battery
Details
       

 02-27-2019
17.00
More Cosmetic Body-Work
Details
       

 02-26-2019
3.00
Polyester-Epoxy Filler for Rivet Imperfections
Details
       

 02-14-2019
12.00
Riveted Forward Avionics Deck
Details
       

 01-28-2019
10.00
Riveted Turtle Deck (Upper Aft Skin)
Details
       

 12-07-2018
4.00
Upper Aft Fuselage Skin
Details
       

 12-03-2018
3.00
Modify Cockpit Access Panel Firewall Bulkhead
Details
     

 11-21-2018
4.00
Install Baggage & CTR Console Panels
Details
       

 11-20-2018
3.00
Began to go through all previous building plans
Details
       

 02-10-2015
8.50
Installing the Whisperflow SV Ventilators
Details
       

 02-09-2015
11.00
Installing fresh air ventilators and CAT ducting
Details
       

 05-05-2010
3.00
Install the GRT AHRS Mounting Bracket
Details
       

 05-03-2010
3.00
Install AHRS Bracket
Details
       

 08-08-2009
4.00
Install Rudder Cable & Fabricated
Details
       

 05-28-2009
1.00
More pics of access panels
Details
       

 05-27-2009
4.00
Install Nutplates & Access Panels on Aft Elevator
Details
       

 04-07-2009
3.50
Installed Flap Positioning System and Wiring
Details
       

 04-05-2009
2.50
Install ELT Mounting Bracket
Details
       

 04-04-2009
3.00
Dual Brake lines installed (Bonaco Brained Steel)
       

 04-01-2009
0.00
Dual System Bonaco Brake Lines Installed
Details
       

 04-01-2009
0.00
Bonaco Brake Lines installed
       

 03-31-2009
1.00
Dual Brake lines installed
Details
       

 03-30-2009
8.00
Install Bonaco Fuel Lines Valve to Wings
Details
       

 03-28-2009
13.50
Fuel Line--Fuel Pump to Engine & Wing Vent Lines
Details
       

 03-15-2009
3.00
Installing fuel lines from boost pump to engine
Details
       

 03-14-2009
1.00
Fuel Pump Assembly -- Continued
Details
       

 03-13-2009
13.00
Airflow Performance Fuel Boost Pump Assembly
Details
       

 03-06-2009
3.00
Assembling Aerflow Performance Fuel Pump
Details
       

 03-01-2009
6.00
Painting the cockpit in "Hammered Aluminum"
Details
       

 02-28-2009
18.00
Installing High Pressure Electric Fuel Pump Cover
Details
       

 02-14-2009
10.00
Removed wings, added nutplates for bottom skin, fi
Details
       

 02-09-2009
1.00
Setting Flap Extension
Details
       

 02-07-2009
3.00
Re-rigging the ailerons & flaps
Details
       

 02-06-2009
0.00
Flap pushrod holes from the side of the fuselage
Details
       

 02-05-2009
3.00
Cutting the flap push rod holes in the fuselage
Details
       

 01-05-2009
2.00
Leveling the fuselage to prepare for wing sweep
Details
       

 01-02-2009
6.00
Building wing-mount stands
Details
     

 12-28-2008
10.00
Preparation to attach wings to the fuselage
Details
       

 09-15-2008
14.00
Main Landing Gear Mounts
Details
       

 08-23-2008
6.00
More Stick Boot Ring Fabrication
Details
       

 08-21-2008
2.00
Fabrication of Stick Boot Rings
Details
       

 08-19-2008
8.00
Center Console Fabrication and Installation
Details
       

 08-11-2008
3.00
Electrical Conduit in the baggae area
Details
       

 08-06-2008
3.00
Installing the strobe pack mounting bracket
Details
       

 08-05-2008
1.50
Shoulder Harness Cable rub blocks
Details
       

 08-02-2008
6.00
Installing the F-6111 ribs to the aft top skin
Details
       

 07-29-2008
2.00
Fit the forward top skin; aft fuselage
Details
       

 07-27-2008
3.00
Fabricated and installed Elevator Bellcrank
       

 07-21-2008
5.00
Fabricate rear canopy plate
Details
       

 07-12-2008
9.00
Completed Rudder Pedal and Brake Assembly installe
Details
       

 07-11-2008
6.00
Fabricate and install the rudder pedals and brakes
Details
       

 07-07-2008
4.50
Cut Holes for Landing Gear Sockets and Brake Lines
Details
       

 06-30-2008
4.00
Finished the external steps
Details
       

 06-21-2008
14.00
Cut the holes for the external steps
Details
       

 06-18-2008
2.50
Tail tie down assembly
Details
       

 06-11-2008
2.50
Installed rivets in Bulkhead
Details
     

 06-08-2008
10.00
Assembled and mounted control column
Details
       

 06-02-2008
2.00
Installed rivets in bulkhead side channels
Details
       

 06-01-2008
10.00
Started Fabricating Seatback Brace Receiver Plates
Details
       

 05-31-2008
4.00
Installed Electrical Grommets and Marked Firewall
Details
       

 05-30-2008
0.00
Pictures of the Fuselage
Details
       

 05-30-2008
0.00
More Pictures of the fuselage
Details
       

 05-29-2008
7.00
Fabricated Brackets for Control Stick Access
Details
       

 05-29-2008
5.00
Brake Bracket & Firewall Recess
Details
       

 05-28-2008
15.00
Finished Right and Left Seat Back
Details
       

 05-10-2008
2.00
Cut and attach hinges to braces
Details
       

 05-09-2008
1.00
Tunnel Cover between seat backs
Details
       

 05-08-2008
4.00
Tunnel Cover between the seat backs
Details
       

 05-07-2008
2.50
Seat Braces and Angle Braces
Details
       

 05-05-2008
1.00
More work on seat back braces
Details
       

 05-05-2008
1.50
Fabricate Seat Backs
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.