 03-28-2008
12.00
Hydraulic dump valve installation.
Details
       

 03-27-2008
12.00
Trial fit/trim center console and hydraulic/fuel
       

 03-26-2008
11.00
Check fuel and hydraulic line clearances.
       

 03-25-2008
11.00
Instal the first lot of hydraulic lines
       

 03-19-2008
12.00
Installed hydraulic pump and flap actuator bracket
       