Powered By Kitlog Pro v2.0
RV-7A Construction Log
RV-7A
Tools
Work Logs Found:
59
Category Work Time:
24 Hours
Date
Hours
Work Log Summary
Details
04-01-2020
1.00
Time to give my compressor some attention
Details
04-17-2019
0.50
tool box for second hangar
Details
12-16-2018
0.10
New Compressor
Details
08-25-2018
1.00
Lights
Details
06-01-2018
0.50
Torque Screw Drive
Details
05-20-2018
0.50
Gear Wrench
Details
04-13-2018
0.11
Power Supply
Details
12-04-2016
0.10
Propellor Wrench
Details
12-04-2016
0.10
Crimper - Large Size
Details
12-04-2016
0.10
Adel Clamp Pliers Tool
Details
05-06-2016
0.10
Shop Crane 2 Ton Lift
Details
10-01-2015
0.10
Paint Guns
Details
04-19-2015
0.10
LED shop light
Details
02-09-2014
0.50
Electrical Tools
Details
02-09-2014
0.50
Compressor
Details
02-26-2012
0.10
Fiber Glass Stuff
Details
10-15-2011
1.00
Drill Press
Details
04-20-2011
0.10
90 degree angle for drill
Details
09-11-2010
0.10
New Ridged sander with life time warranty
Details
09-11-2010
0.10
Fluke Multi-meter Bait and Swtich
Details
07-17-2010
0.20
Calipers
Details
06-30-2010
0.10
Sanders for finishing plexi glass edges
Details
06-30-2010
0.10
Reamers and tapered file and reamer
Details
06-30-2010
0.10
Plexi Glass Edge Scraper
Details
06-30-2010
0.10
Cutting Tools for Plexi Glass
Details
06-29-2010
0.10
Band Saw Table
Details
05-03-2010
1.00
Rack for Plano Boxes
Details
04-01-2010
0.10
1/8 Pop Rivet Dimpler
Details
02-15-2010
0.10
48 inch ruler & two squares clamped
Details
11-28-2009
0.10
Electrical Tools from SteinAir
Details
09-13-2009
0.10
Small flush set
Details
09-11-2009
0.10
750 lb Engine Holder for Rotesserie
Details
08-20-2009
0.10
6 in Chop Saw w/ DeWalt Aluminum Blade
Details
07-08-2009
0.00
Small Files
07-03-2009
0.25
Cherry Max Rivets
Details
06-15-2009
0.50
Platenut jig
Details
06-15-2009
0.50
Changed Clamp Head
Details
04-03-2009
1.00
Bandsaw Fix Up 1
Details
03-25-2009
0.50
Slide Vise for Milling on my Drill Press
Details
03-19-2009
0.10
Sheet Metal Clamps by Carr Lane
Details
02-07-2009
0.10
Tungsten Bucking Bar
Details
02-07-2009
0.10
1/4 in reamer
Details
01-25-2009
0.50
Wing Cradle
Details
01-25-2009
0.50
Drill Press Table
Details
01-25-2009
0.50
Double offset riveting set
Details
01-25-2009
0.50
Bucking Bar for Back Riveting
Details
01-17-2009
0.50
Large Step Down Drill
Details
01-17-2009
0.50
Knee Pads
Details
12-14-2008
0.50
Rivet Shaver
Details
11-28-2008
0.50
Pulled Rivet Gun Modified for Tight Spots
Details
10-09-2008
0.50
Fly Cutter and Hole Cutter Bits
Details
08-16-2008
0.10
All the Drill Bits
Details
08-12-2008
1.00
Flange Bender to get 90 degrees
Details
08-06-2008
1.00
Yoke for Hard to Reach Rivets in thin areas
Details
07-22-2008
0.50
New Belt Sander
Details
05-21-2008
1.00
Bender for Elevator Trailing Edges
Details
04-16-2008
1.00
Paint Booth
Details
03-29-2008
2.00
Dimple Bucking Bar
Details
03-12-2008
1.00
Bought Tools Today
Details
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
2101
1764
Avionics
60
53
Cert & Flying
62
75
Cowl
48
37
Electrical
61
48
Empennage
141
181
Engine
102
73
Finish Kit
255
148
Fuselage
339
238
Fuselage After Flip
385
237
Gear
78
57
Interior
16
14
Miscellaneous
49
33
Painting
62
50
Prop
17
17
Shop
5
10
Tools
59
24
Training Projects
12
32
Wings
350
437
Copyright © 2001-2024 Matronics. All Rights Reserved.