Powered By Kitlog Pro v2.0
MARTIN'S WEB SITE
Hawk Arrow II
Avionics
Work Logs Found:
46
Category Work Time:
58 Hours
Date
Hours
Work Log Summary
Details
02-10-2010
1.20
Antenna Mounting/ Landing Light
Details
01-31-2010
1.40
Final Pitot Mount
Details
01-21-2010
1.00
Pitot connections
Details
01-10-2010
0.40
Pitot placement
Details
01-07-2010
0.30
Headset Wiring
Details
01-05-2010
1.20
Wiring
Details
01-03-2010
0.30
Antenna Relocation
Details
12-08-2009
0.70
Strobe Wiring
Details
12-03-2009
1.20
Light Wiring
Details
11-04-2009
0.20
Antenna Mounts
Details
10-18-2009
1.00
Comm. Radio/ELT/ Intercom Test
Details
10-10-2009
0.80
Lights/Avionics/ELT
Details
10-09-2009
0.80
Terminal Block/Lights and Avionics Buss
Details
10-08-2009
2.20
Dual Headset Connections
Details
10-07-2009
4.10
Comm. Radio
Details
10-04-2009
1.30
Pitot Tubing
Details
10-01-2009
2.10
Light Switches
Details
09-30-2009
1.50
Push to Talk Switch
Details
09-29-2009
0.40
Secure Instrument Panel
Details
08-17-2009
0.30
Power Switches
Details
07-31-2009
0.40
GPS Antenna
Details
07-25-2009
0.40
Antenna Brackets
Details
07-23-2009
0.80
PTT Switch
Details
07-22-2009
2.30
Instrument Panel
Details
07-21-2009
0.80
Instrument Panel
Details
07-19-2009
1.00
Instrument Panel
Details
07-16-2009
0.90
Instrument Panel
Details
07-15-2009
1.50
Instrument Panel
Details
07-14-2009
1.80
Instrument Panel
Details
07-13-2009
1.10
Power Source
Details
07-08-2009
0.20
Pitot Tube Mount
Details
07-01-2009
0.80
Landing Lights
Details
07-01-2009
0.50
Control Switches
Details
06-30-2009
2.10
Headset Chassis
Details
06-29-2009
1.90
Instrument Panel Supports
Details
06-26-2009
0.40
Instrument Panel Enlargement
Details
06-25-2009
0.70
Avionic Switch Panel
Details
06-24-2009
0.80
Instrument Panel
Details
06-23-2009
0.90
Instrument Panel
Details
06-22-2009
0.20
Instrument Panel
Details
06-19-2009
0.60
Details
06-09-2009
0.60
Instrument panel test layout
Details
05-21-2009
1.50
Battery mounting box
Details
05-18-2009
0.00
Pix of ELT antenna bracket
05-18-2009
1.50
ELT mounting
Details
08-18-2007
12.00
EAA Sport Workshop
Details
SITE NAVIGATION
Contact Builder
Hawk Arrow II Home
Category
# Logs
# Hours
All
394
556
Avionics
46
58
Controls
46
51
Empennage
22
35
Engine
84
100
Fabric covering
33
46
Fuselage
62
106
Landing Gear
30
38
Miscellaneous
36
71
Prop
3
2
Shop Supplies
1
0
Wings
31
49
Copyright © 2001-2024 Matronics. All Rights Reserved.