Powered By Kitlog Pro v2.0
MAT ISAs Web Site
Sonerai II (Original)
Empennage
Work Logs Found:
27
Category Work Time:
69 Hours
Date
Hours
Work Log Summary
Details
12-13-2008
3.50
Vertical stab bracing
Details
12-11-2008
3.60
Vertical stab rib & misc metal items
Details
12-10-2008
1.80
Turtle Deck
Details
11-29-2008
3.00
Turtle deck Bracing
Details
10-26-2008
2.50
Turtle Deck
Details
10-12-2008
2.50
Tail Longeron and Vertical Stab
Details
09-13-2008
1.50
Vertical Stabilisor
Details
09-06-2008
0.50
Vertical Stab Prep
Details
08-02-2008
4.30
The Elevator
Details
07-27-2008
3.20
The elevator
Details
07-26-2008
4.60
Elevator preparation
Details
06-08-2008
1.00
Elevator jig prep
Details
06-06-2008
4.00
Horizontal Stab Preparation (Left)
Details
06-05-2008
3.50
Horizontal stab preparation (Right)
Details
06-04-2008
2.00
Rudder
Details
06-04-2008
3.50
Preparation of the horizontal stabilisor
Details
06-03-2008
2.30
Metal strip bending
Details
05-02-2008
2.00
Elevator metal rib
Details
04-16-2008
2.50
Tail ribs
Details
04-05-2008
3.00
Rib Metal Strip
Details
03-23-2008
1.50
Rib metal strip
Details
03-22-2008
2.50
Horizontal Stabiliser
Details
03-02-2008
2.00
Horizontal Stab Prep
Details
02-26-2008
1.50
Rudder rib cutting
Details
02-25-2008
1.00
Rudder ribs sketch
Details
02-23-2008
2.50
Rudder Prep
Details
02-10-2008
3.00
Rudder Prep
Details
SITE NAVIGATION
Contact Builder
Sonerai II (Original) Home
Category
# Logs
# Hours
All
155
521
Empennage
27
69
Fuselage
75
270
Miscellaneous
37
114
Welding
16
68
Copyright © 2001-2024 Matronics. All Rights Reserved.