KitLog pro

Powered By Kitlog Pro v2.0

Carl Bells RV7A N947CB
Work Logs Found: 22
Category Work Time: 76 Hours
 Date
Hours
Work Log Summary

Details

 05-20-2010
2.00
Starting the engine
Details
       

 12-30-2009
2.50
Cleaning up loose ends
Details
       

 05-20-2009
4.00
Installing the sniffle valve
Details
       

 05-19-2009
4.00
Alternator final install and wiring
Details
       

 03-23-2009
4.00
Alternate Air
Details
       

 01-28-2009
4.00
Lycoming FP plug and Manifold Pressure box
Details
       

 11-05-2008
7.00
Horizontal Injection Induction System
Details
       

 09-29-2008
2.00
Engine Stuff
Details
       

 09-29-2008
3.00
Air Oil Separator
       

 09-24-2008
4.00
Engine Stuff
Details
       

 09-10-2008
0.50
Spinner
Details
     

 09-08-2008
5.00
Mixture control
Details
       

 09-06-2008
3.00
Throttle Linkage
Details
       

 09-05-2008
4.00
Making a throttle cable braket that works
Details
       

 09-03-2008
4.00
Installing the Vetterman exhaust system
Details
       

 09-02-2008
5.00
Installing the vetterman exhaust system
Details
       

 08-30-2008
3.00
Mounting the engine
       

 08-29-2008
3.00
Mounting the engine
Details
       

 08-22-2008
4.00
Preparation for hanging the engine
Details
       

 07-22-2008
2.00
Engine delivery
Details
     

 05-03-2008
0.20
Propeller
Details
       

 03-21-2008
6.00
Motor mount installation & Wiring
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.