Powered By Kitlog Pro v2.0
WILLIAM'S WEB SITE
Super Trainer
Fuselage
Work Logs Found:
31
Category Work Time:
140 Hours
Date
Hours
Work Log Summary
Details
05-03-2008
4.75
Started cabin top section
Details
04-19-2008
5.50
Cut , fit firewall tubing
Details
04-15-2008
3.75
install brace tubes
Details
04-04-2008
3.00
Install tubes
Details
04-03-2008
3.00
fit tube between station #1 and #2
Details
03-30-2008
4.25
Finished tail post
Details
03-29-2008
6.75
Re- aligning fuselage
Details
03-28-2008
3.00
Tack weld braces
Details
03-27-2008
4.00
Received wing kit from wag. worked on fuselage
Details
03-22-2008
12.50
Cut and fit braces
Details
03-20-2008
3.50
add cross braces
Details
03-12-2008
4.75
Fit Diagonal braces
03-11-2008
3.25
Fit angle braces upper and lower longerons
03-10-2008
5.25
Installed upper and lower cross tubes, Sta 4,5,6
03-08-2008
5.75
Installed clamps and bracing for sidewall supports
03-08-2008
4.50
Details
03-06-2008
7.00
Setting up sides and installing jig blocks
03-04-2008
2.75
Start layout for box fraing sides
03-01-2008
3.00
Tack weld right side
02-27-2008
4.00
cut and fit tubes right side
02-23-2008
6.25
cut and fit tubes right side
02-21-2008
2.75
cut and bend upper longerons - Right side
02-20-2008
2.75
LEFT SIDE Tack weld and remove
02-19-2008
3.75
Finished cuttng and fit tubes left side
02-16-2008
2.75
Cut and fit tubes
02-14-2008
6.00
cut and fit tubes left side
02-12-2008
2.25
Cut and bend upper and lower longirons
02-09-2008
3.25
Fiinish installing jig blocks
02-04-2008
4.25
Layout fuselage on jig table
02-02-2008
4.75
Finished jib table
01-29-2008
7.00
Plan and cut material for jib table
Details
SITE NAVIGATION
Contact Builder
Super Trainer Home
Category
# Logs
# Hours
All
36
161
Fuselage
31
140
Landing Gear
1
7
Miscellaneous
2
6
tooling
2
8
Copyright © 2001-2024 Matronics. All Rights Reserved.