Sorrell Hiperbipe N278HB
SNS-7 Hiperbipe
Fuselage
Work Logs Found:
67
Category Work Time:
346 Hours
Date
Hours
Work Log Summary
Details
08-12-2009
3.00
finished fasteners for tailwheel fairing
Details
08-10-2009
3.00
installed oil breather line
Details
08-09-2009
4.00
tail wheel disassembly, oil breather line
Details
08-07-2009
2.50
started oil separator line in fuselage
Details
08-03-2009
6.00
Installed rudder cables and tailwheel cable
Details
08-02-2009
3.00
Finished rudder cables
Details
07-30-2009
6.00
Started rudder cables
07-24-2009
3.00
07-23-2009
4.00
07-22-2009
8.00
07-21-2009
6.00
07-20-2009
6.00
07-10-2009
4.00
07-06-2009
4.00
07-04-2009
6.00
07-03-2009
4.00
07-02-2009
6.00
06-26-2009
6.00
06-25-2009
6.00
06-22-2009
6.00
06-19-2009
6.00
06-18-2009
6.00
06-17-2009
6.00
added nut plates
Details
06-08-2009
7.00
electrical panel mounting panel
Details
06-04-2009
5.00
determined position for electrical panel
Details
06-03-2009
4.00
ordered parts, installed cockpit floor boards
Details
06-01-2009
3.00
Made dimple die
Details
05-29-2009
0.50
added spacer to lower aft fairing strip
Details
05-28-2009
6.00
built lower aft fairing strip
Details
05-15-2009
8.00
05-14-2009
8.00
05-13-2009
8.00
05-12-2009
5.00
05-11-2009
4.00
05-08-2009
3.00
sheet metal work
Details
05-07-2009
4.00
sheet metal work
Details
05-06-2009
5.00
sheet metal work
Details
05-05-2009
7.00
sheet metal work
Details
05-02-2009
8.00
sheet metal work
Details
05-01-2009
6.00
sheet metal work
Details
04-24-2009
11.50
Covered top of fuselage
Details
04-23-2009
10.00
Installed cockpit parts
Details
04-22-2009
9.00
prepped and paiinted misc pieces
Details
04-18-2009
6.00
cut out firewall
Details
04-17-2009
8.00
Burnished firewall
Details
04-16-2009
7.00
started burnishing of firewall
Details
04-15-2009
2.00
prepped parts for painting
Details
04-12-2009
7.00
cleaned parts for painting
Details
04-11-2009
2.50
cleaned parts for painting
Details
04-10-2009
9.00
worked on reassembly of the flap trim assembly
Details
04-08-2009
1.00
removed all painted parts from stand
Details
04-07-2009
8.00
primed and painted small parts
Details
04-06-2009
8.00
prepped parts for paint
04-03-2009
7.00
cleaned up parts
Details
04-02-2009
6.00
cleaning and painting fuselage parts
Details
03-03-2008
1.00
dissasembled cabin doors.
Details
02-29-2008
2.00
picked up fuselage and control surfaces from Speed
Details
02-22-2008
5.00
delivered fuselage to Surcor
Details
02-21-2008
3.00
finished removing fuselage parts, flap and trim
Details
02-19-2008
3.00
removed tail wheel
Details
02-18-2008
3.00
removed firewall
Details
02-16-2008
4.00
removed motor mount, landing gear, gas tank
Details
02-15-2008
2.00
removed seat rail, misc parts
Details
02-14-2008
1.00
removed cockpit parts
Details
02-12-2008
7.00
removed fuselage components
Details
02-11-2008
3.00
removal of airframe components
Details
02-09-2008
4.00
moved fuselage to house
Details
SITE NAVIGATION
Contact Builder
all other A&P work Home
SNS-7 Hiperbipe Home
Category
# Logs
# Hours
All
150
874
Airplane
3
158
Avionics
11
40
covering and paint
26
148
Electrical
1
7
Engine
8
38
Fuselage
67
346
Instrument Panel
20
92
landing gear
6
11
Miscellaneous
6
25
Tail
1
2
Wings
1