KitLog pro

Powered By Kitlog Pro v2.0

Marks Rans Courier Project
Work Logs Found: 7
Category Work Time: 18 Hours
 Date
Hours
Work Log Summary

Details

 07-12-2009
2.00
Install gear leg fairings
Details

 03-01-2008
5.00
assemble and fit fairings
Details
       

 02-25-2008
1.50
Fabricate gear fairing
Details

 02-24-2008
2.00
Install right wheel/brake assembly
Details
       

 02-24-2008
3.00
Install left wheel/brake assembly
Details
       

 02-24-2008
2.00
Fitted left axle and brake plate
Details
       

 02-24-2008
2.00
Assemble right wheel/brake
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.