Powered By Kitlog Pro v2.0
THOMAS'S WEB SITE
162F
Controls
Work Logs Found:
18
Category Work Time:
63 Hours
Date
Hours
Work Log Summary
Details
08-25-2006
1.80
Collective Friction Grip
Details
08-13-2006
4.50
Infinity Flight Grips
Details
03-25-2006
1.50
Collective Rod Adjustment
Details
03-15-2006
1.50
Installed Collective Rod
Details
03-15-2006
7.50
Installed Collective Crosstube
Details
03-12-2006
4.00
Installed Cyclic Crosstube
Details
03-08-2006
6.00
Installed Foot Pedal Crosstube
Details
03-04-2006
1.50
T/R Cable Bracket
Details
06-01-2005
0.90
A/T Pedal Modification
Details
04-10-2005
3.20
Throttle Correlation Mod
Details
02-04-2005
6.30
Foot Pedal Cross Tube
Details
09-30-2004
5.00
Chroming of Various Parts
Details
09-25-2004
3.00
Foot Pedal Scissor Assembly
Details
09-15-2004
4.10
Assembled Foot Pedals and Weldment
Details
09-04-2004
2.80
Foot Pedal Bushings
Details
09-01-2004
3.50
Foot Pedal Fabrication
Details
05-01-2004
3.00
Door Post Placement
01-22-2004
2.50
Installed Collective Control
Details
SITE NAVIGATION
Contact Builder
162F Home
Category
# Logs
# Hours
All
196
1105
Airframe
12
46
Alternator/Water Pump
3
22
Avionics
5
14
Body
16
110
Cabin Comfort
2
3
Controls
18
63
Cooling
6
42
Diassemble/Paint
2
28
Drvietrain
15
89
Electrical/Avionics
14
139
Engine
24
132
Exhaust
6
48
Fuel System
11
45
Fuselage
1
1
Insturment Panel
6
64
Interior
1
2
Miscellaneous
1
0
None
1
2
Paperwork
1
6
Seatback
5
22
Shop Supplies
1
40
Skids
3
14
Tail Boom
27
101
Tail Rotor
10
48
Trailer
5
24
Copyright © 2001-2024 Matronics. All Rights Reserved.