KitLog pro

Powered By Kitlog Pro v2.0

THOMAS'S WEB SITE
Work Logs Found: 12
Category Work Time: 46 Hours
 Date
Hours
Work Log Summary

Details

 02-05-2006
3.20
Installed Airframe to Landing Gear
Details
       

 01-25-2006
3.00
Installed Skids and Landing Gear
Details
       

 01-11-2006
3.00
Skid Removal For Painting
Details
     

 09-02-2005
1.00
Lower Engine Mount Adjustment
Details
       

 07-14-2004
3.50
Reassembling The Airframe
       

 03-06-2004
3.00
Installing Pedal Crosstube
Details
     

 01-18-2004
1.00
Fabricated Battery Box Straps
Details
     

 01-14-2004
10.40
Installing Lower Engine Mount
Details
       

 01-13-2004
1.00
Studied Mounting Lower Engine Mount
Details

 01-11-2004
6.50
Attached Landing Gear To Airframe
Details
       

 01-08-2004
4.50
Tapped Body Support Bushings
Details
     

 01-08-2004
6.00
Fit And Drill Fuel System Mount Tube
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.