Powered By Kitlog Pro v2.0
WebAir Web Site
RV-8
Fuselage
Work Logs Found:
81
Category Work Time:
326 Hours
Date
Hours
Work Log Summary
Details
07-03-2008
6.50
Starter relay and fuel line
Details
07-02-2008
7.00
Engine Control installation
Details
06-01-2008
7.00
Avionics access door
Details
05-31-2008
4.00
Final install cabin vent system
Details
05-24-2008
3.00
Tail plane final installation
Details
05-24-2008
6.00
Final fit and tailplane installation
Details
05-21-2008
5.00
Control surface stops
Details
04-26-2008
9.00
Vertical stab attach
Details
04-24-2008
5.00
Elevator stop
Details
04-20-2008
6.00
Mounting the Horizontal
04-20-2008
2.00
Horizontal stab mounting
Details
04-20-2008
2.50
Horizontal forward holes
Details
04-19-2008
8.50
Nutplates
Details
04-18-2008
5.00
Floor nutplates
Details
04-17-2008
4.50
Finished side consoles
Details
04-13-2008
6.00
RH heat duct
Details
04-13-2008
2.50
Fuel line to firewall
Details
04-12-2008
3.00
Install gascolator mount
Details
04-12-2008
4.00
Gascolator mount
Details
04-11-2008
5.50
RH heat duct
Details
04-06-2008
3.00
Side console heat ducts
Details
04-06-2008
2.50
RH side console
Details
04-06-2008
3.50
Heat ducts
Details
04-05-2008
5.00
Side Consoles
Details
04-03-2008
1.50
Side reinforcement cap
Details
04-03-2008
3.50
Control trio and LH side console
Details
04-02-2008
5.00
Engine Control Trio
Details
04-01-2008
6.00
Heat ducting
Details
03-30-2008
5.00
Forward partition
Details
03-29-2008
5.00
Pilot Consoles
Details
03-29-2008
2.00
Engine control trio
Details
03-28-2008
5.00
Cabin Ventilation
Details
03-09-2008
4.50
Fuel vent lines and fittings
Details
03-08-2008
6.50
Brake lines
Details
03-05-2008
3.00
Rudder control final
Details
03-04-2008
4.00
Rear rudder control
Details
03-03-2008
4.00
String rudder cables
Details
03-02-2008
1.50
Rudder pedal assy
Details
03-02-2008
1.50
Rudder pedal assy
Details
03-02-2008
4.50
Cooling ramp
Details
03-02-2008
2.50
Cooling ramp
Details
03-01-2008
6.00
Roll bar, cooling ramp, rudder pedal assy
Details
02-29-2008
2.00
Roll bar
Details
02-29-2008
4.00
Cooling ramp
Details
02-27-2008
5.00
Roll bar mod and final fit
Details
02-26-2008
5.00
Roll bar repair
Details
02-24-2008
7.00
Roll bar
Details
02-21-2008
4.00
Finish match drilling top skin
Details
02-19-2008
6.50
Fuselage top front skin
Details
02-17-2008
4.00
Side Consoles
Details
02-17-2008
4.50
Side Consoles
Details
02-16-2008
2.50
Side Consoles
Details
02-15-2008
2.00
Side consoles
Details
02-15-2008
2.50
Mid fuse covers
Details
02-15-2008
2.00
Channel caps
Details
02-14-2008
4.50
Channel Caps
Details
02-13-2008
4.00
Forward Baggage
Details
02-13-2008
4.50
Channel Cap
Details
02-12-2008
4.50
Forward seat ramp
Details
02-10-2008
9.50
Floor pans
Details
02-09-2008
1.50
Rear side covers
Details
02-09-2008
2.50
Install center control torque tube
Details
02-09-2008
1.50
Elevator push rod
Details
02-09-2008
1.50
Elevator bellcrank install and connect
Details
02-09-2008
1.50
Elevator bellcrank
Details
02-08-2008
3.00
Center control tube
Details
02-08-2008
1.50
Center control
Details
02-06-2008
2.50
Rivet Rear Seat
Details
02-06-2008
1.50
Control sticks
Details
02-06-2008
1.00
Center flight control group
Details
02-03-2008
1.50
Flap torque tube
Details
02-03-2008
2.50
Flap actuator
Details
02-03-2008
3.50
Control torque tube
Details
02-02-2008
2.50
Rear seat
Details
02-02-2008
2.50
Rear seat
Details
02-01-2008
2.00
Seats
Details
02-01-2008
4.00
Rivet floor pan stiffeners, drill to structure
Details
01-30-2008
4.50
Floor pans
Details
01-28-2008
4.50
Floor pans
Details
01-27-2008
10.00
Read instructions and study plans
Details
01-26-2008
6.00
Build fuselage stand
Details
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
139
654
Cabin Ventilation
5
20
Electrical System
5
40
Empennage
28
164
Fuel System
7
34
Fuselage
81
326
Miscellaneous
1
Shop Supplies
1
Wings
11
70
Copyright © 2001-2024 Matronics. All Rights Reserved.