Powered By Kitlog Pro v2.0
Marks Web Site
RV-7A
Firewall Forward
Work Logs Found:
72
Category Work Time:
350 Hours
Date
Hours
Work Log Summary
Details
11-25-2022
25.00
Winterization Kit
Details
01-04-2010
3.00
Cowling iterations carried out
Details
01-03-2010
9.50
Propeller installation...
Details
12-12-2009
1.00
Engine cooling air intake rings painting
Details
12-11-2009
9.00
Multiple firewall forward items secured...
Details
12-10-2009
8.00
Engine cowling and fairings paint touch up...
Details
12-09-2009
2.25
Cowling accent color painting
Details
12-08-2009
5.00
Engine cowling painting continued
Details
12-07-2009
2.00
Upper engine colwing painting...
Details
12-06-2009
1.50
Upper engine cowling UV blocker application...
Details
12-05-2009
2.25
Upper engine cowling priming...
Details
12-03-2009
7.00
Lower engine cowling painting...
Details
12-01-2009
4.00
Lower engine cowling sanding
Details
11-30-2009
4.50
Engine cowling outer face sanding...
Details
11-29-2009
2.00
Upper cowling sanding
Details
11-28-2009
1.25
Engine cowl micro application and sanding
Details
11-14-2009
6.00
Engine induction filter assembly installation
Details
10-10-2009
9.25
Tying up firewall forward loose ends
Details
10-03-2009
9.25
Post paint engine reinstallation
Details
09-27-2009
10.00
Firewall preparation prior to painting...
Details
09-26-2009
5.00
Firewall sealant application
Details
09-25-2009
5.50
Engine removal prior to painting fuselage
Details
09-24-2009
5.50
Right wing painting, engine alternate air intake
Details
09-23-2009
8.75
Engine intake alternate air selector valve prep...
Details
09-22-2009
6.50
Wing repainting & engine air filter preparation
Details
09-20-2009
7.75
Cabin heat muff installation...
Details
09-19-2009
10.00
Engine exhaust and ignition lead securing...
Details
09-18-2009
4.00
Cowling engine cooling intake ring sanding...
Details
09-17-2009
2.00
Riveted cowling forward flange nut plates...
Details
09-16-2009
7.50
Engine baffle and pleunum installation...
Details
09-15-2009
8.25
Lower cowling air exit attach bracket
Details
09-13-2009
3.00
Upper cowling oil filler door installation
Details
09-12-2009
3.00
Upper cowling oil filler door fabrication
Details
09-11-2009
1.50
Cowling engine combustion air inlet bonded...
Details
09-10-2009
5.00
Engine baffle trimming...
Details
09-09-2009
7.00
Cowling fastener retainer strip riveting...
Details
09-08-2009
20.00
Cowling installation
Details
09-02-2009
7.00
Lower cowling fitting
Details
09-01-2009
7.50
Prop installation and upper cowling fitting
Details
05-07-2009
1.25
Starter solenoid ground circuit rewiring
Details
04-26-2009
1.00
Master and starter solenoid diodes installed
Details
04-17-2009
5.50
Engine wiring continued
Details
04-12-2009
1.50
Prop control cable firewall shield installed...
Details
04-08-2009
8.25
Engine harness preparation
Details
04-06-2009
7.50
Engine primer installation
Details
03-23-2009
2.50
Engine manifold pressure manifold completed
Details
03-02-2009
2.00
Fuel flow transducer mount fabricated
Details
03-01-2009
6.75
Main alternator installation...
Details
02-27-2009
2.00
Back up alternator installation...
Details
02-21-2009
3.00
Engine to firewall ground cable installation...
Details
02-20-2009
1.75
Fuel pump overflow line installed...
Details
02-05-2009
2.50
Oil pressure restrictor fitting installation...
Details
02-05-2009
1.75
Fuel line installation...
Details
01-20-2009
3.00
Oil and fuel pressure transducer installation...
Details
01-20-2009
1.50
EGT and CHT probe installation
Details
01-19-2009
2.00
Engine exhaust system fitting
Details
12-20-2008
6.00
Fuel line and electrical cable installation
Details
12-06-2008
2.50
Engine mounting
Details
11-22-2008
5.00
Propeller governor installation...
Details
11-16-2008
1.00
Carburetor installation
Details
11-07-2008
5.00
Engine baffle preparation
Details
11-05-2008
1.50
Engine baffle preparation
Details
11-02-2008
4.00
Engine baffle preparation
Details
10-20-2008
0.00
Aero Sport Power engine arrives
Details
10-19-2008
1.75
Cowling mounting flange preparation continued
Details
10-18-2008
4.75
Cowling mounting flange preparation
Details
10-10-2008
0.00
The propeller arrives
Details
02-09-2008
5.75
Firewall preparation
Details
02-04-2008
2.50
Heat valve, pressure transducer manifold install
Details
02-03-2008
1.50
Gascolator installation
Details
02-02-2008
7.25
Battery box, contactors and breather tube clamp
Details
01-02-2008
1.75
Firewall forward kit inventory
Details
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
606
2407
Empennage
59
221
Engine
2
7
Firewall Forward
72
350
Fuselage
260
1134
Instrument Panel
25
102
Miscellaneous
45
158
Shop Supplies
1
2
Wings
142
433
Copyright © 2001-2024 Matronics. All Rights Reserved.