Powered By Kitlog Pro v2.0
Josephs Web Site
Q2
Engine
Work Logs Found:
24
Category Work Time:
86 Hours
Date
Hours
Work Log Summary
Details
01-23-2008
5.00
Tested engine mount
Details
01-22-2008
1.00
Testing emgine mount
Details
01-18-2008
2.50
Paint engine mount
Details
01-17-2008
1.50
Sandblasted engine mount; primer
Details
01-16-2008
4.00
Engine mount
Details
01-14-2008
3.00
Engine mount
Details
01-13-2008
3.50
Engine mount
Details
01-12-2008
3.00
Airfilter/carb heat box
Details
01-11-2008
2.50
Baffel leaks; engine mount
Details
01-10-2008
4.00
Safety shaft nut, top cover, starter
Details
01-09-2008
2.50
Oil cooler; baffeling
Details
01-08-2008
2.50
Alternator Bracket
Details
01-07-2008
2.50
Alternator Bracket
Details
01-05-2008
5.00
Engine assembly
Details
01-04-2008
4.50
Engine assembly
Details
12-03-2007
4.00
Engine mount
Details
12-01-2007
3.00
Engine Mount Repair
Details
10-04-2007
7.00
Engine assembly
Details
10-03-2007
5.00
Installed crankshaft , cam, case bolts, rear cover
Details
09-19-2007
3.00
RemovedEngine mount
Details
09-18-2007
4.00
Engine disassembly
Details
09-17-2007
5.00
Engine disassembly
Details
09-16-2007
4.50
Engine disassembly
Details
09-10-2007
3.50
Checked Engine Level
Details
SITE NAVIGATION
Contact Builder
Q2 Home
Category
# Logs
# Hours
All
65
259
Avionics
11
46
Engine
24
86
Fuselage
28
124
Miscellaneous
2
3
Copyright © 2001-2024 Matronics. All Rights Reserved.