Powered By Kitlog Pro v2.0
Josephs Web Site
Q2
Fuselage
Work Logs Found:
28
Category Work Time:
124 Hours
Date
Hours
Work Log Summary
Details
11-30-2007
5.00
Brakes
Details
09-21-2007
2.50
Master Brake Cylinders
Details
09-21-2007
4.50
Left Pilot master brake cylinder
Details
09-20-2007
2.25
Fuel sensor
Details
09-15-2007
2.50
Micro Repair
Details
09-14-2007
3.50
Micro Repair
Details
09-12-2007
3.00
Micro repair
Details
09-09-2007
5.00
Installed right elevator
Details
09-08-2007
4.00
Installed left canard elevator
Details
09-07-2007
3.50
Paint Cleanup
Details
09-06-2007
6.00
Paint controls
Details
09-05-2007
4.50
Paint Canopy
Details
09-04-2007
6.00
Canopy Prep
Details
09-03-2007
5.50
Paint fuselage
Details
09-02-2007
5.00
Painted Fuselage
Details
09-01-2007
6.00
Paint Prep & Primer
Details
08-31-2007
4.75
Repaired surface defects on canard
Details
08-30-2007
3.00
Sanded surface defects
Details
08-29-2007
3.50
Sanded canard
Details
08-28-2007
4.25
Sanded left wing and canard tops to remove defects
Details
08-18-2007
7.50
Preparation for final paint
Details
08-15-2007
4.50
Sanding Filler
Details
08-14-2007
4.00
Repair of surface defects
Details
08-13-2007
6.00
Sanded Primer
Details
08-12-2007
3.00
Cockpit assembly
Details
08-11-2007
5.25
Prep and paint fuselage with primer
08-10-2007
4.00
Prep and Paint cockpit
Details
08-09-2007
5.50
Surface defect repair
Details
SITE NAVIGATION
Contact Builder
Q2 Home
Category
# Logs
# Hours
All
65
259
Avionics
11
46
Engine
24
86
Fuselage
28
124
Miscellaneous
2
3
Copyright © 2001-2024 Matronics. All Rights Reserved.