Marks Rans Courier Project
Work Logs Found: 30
Category Work Time: 100 Hours
 Date
Hours
Work Log Summary

Details

 02-12-2009
4.00
Wire looming, fastening etc
Details

 11-01-2008
4.00
Cabin heat ductwork etc
       

 10-26-2008
3.00
Install throttle cables

 10-26-2008
2.00
Install Cabin Heater cable

 10-25-2008
4.00
Cabin heat diverter valve- assemble and install

 10-24-2008
3.00
Finish Carb Heat installation and adjustment

 10-23-2008
1.50
Install carb heat control cables

 09-13-2008
5.00
carb heat
Details
       

 09-07-2008
4.00
Carb heat units
Details
       

 09-06-2008
4.00
firewall forward fuel system
Details
       

 08-31-2008
2.00
Firewall forward fuel lines
Details
     

 08-30-2008
2.00
Firewall forward fuel system
Details

 08-24-2008
3.00
Fuel line fitting etc
Details

 08-10-2008
4.00
Radiator and coolant line installation
Details
       

 08-09-2008
4.00
Install oil/lubrication system lines
Details
       

 06-21-2008
2.00
Install oil cooler
Details
       

 06-20-2008
2.00
preparel oil cooler for installation
Details
       

 06-18-2008
5.00
Install exhaust system
Details
       

 06-17-2008
3.00
Assemble muffler/cabin heat exchanger unit
Details
     

 06-06-2008
2.00
install new elbows on water pump
Details

 05-31-2008
5.00
Installed the motor to the fuselage
Details

 05-29-2008
5.00
Water pump and forward motor mount
Details
     

 05-26-2008
6.00
reconfigure motor for installation
Details

 05-25-2008
5.00
engine re-configuration
Details
       

 05-24-2008
4.00
reconfigure motor pre-installation
Details
       

 05-19-2008
2.00
install fuselage fuel lines part 2
Details
       

 05-19-2008
2.00
Install fuselage fuel lines
Details
       

 05-18-2008
2.00
Motor mounts installation
Details

 04-19-2008
3.00
install firewall, motor mount and oil tank
Details

 12-14-2007
3.00
Picked up motor
Details