Marks Rans Courier Project
Work Logs Found: 81
Category Work Time: 256 Hours
 Date
Hours
Work Log Summary

Details

 10-03-2009
2.00
fit and install the rudder cable guard in the cabi
Details

 07-22-2009
1.50
begin fitting bulkhead closeout
Details

 07-07-2009
2.00
Fit elevator yoke to horns, wiring on pitch trim
Details

 06-14-2009
3.00
install elevators, trim/fit fairings
Details

 02-26-2009
4.00
boot cowl install, firewall sealed, begin prop spi
Details
       

 02-24-2009
4.00
instrument panel to glare shield install
Details

 02-23-2009
4.00
Trial fitting boot cowl/instrument panel
Details
       

 02-15-2009
5.00
Fabirc on boot cowl, trial fit cowl and glare shie
Details
       

 12-13-2008
2.00
Install rudder control cables, tailwheel springs

 06-16-2008
5.00
Finish and install seats
Details
       

 06-15-2008
3.00
Assemble seats
Details
       

 05-17-2008
4.00
aileron cable/pulley installation
Details
       

 05-16-2008
3.00
Aileron control assembly installation
Details
       

 05-14-2008
2.00
Throttle lever assembly
Details
       

 05-12-2008
3.00
cast elevator counter-balance weights
Details

 05-11-2008
4.00
Installed trim servo, actuator rod and fittings et
Details
       

 05-10-2008
3.00
Install trim tab onto elevator
Details
     

 05-09-2008
1.00
fitted trim tab servo fairing
Details

 05-08-2008
2.00
Install trim tab servo
Details

 05-07-2008
3.00
paint parts, brake fluid and brake bleeding
Details
       

 05-05-2008
2.00
Painting trim tab etc
Details

 05-04-2008
5.00
Fabrication & painting of the trim tab
Details
       

 05-03-2008
4.00
Horizontal stabilizer
Details
       

 05-02-2008
3.00
Horizontal stabilizer
Details

 05-01-2008
3.00
Installing brake lines
Details

 04-27-2008
4.00
Installing brake cylinders and hoses
Details
       

 04-26-2008
1.00
Main gear reinforcement
Details
       

 04-26-2008
2.00
Gear socket reinforcement
Details
       

 04-18-2008
1.00
Photos of the stripe painting
Details
       

 04-18-2008
8.00
Painting stripes on cowling and tail surfaces
Details
       

 04-17-2008
3.00
Paint prep
Details

 04-15-2008
1.50
Installing accessories on the firewall

 04-14-2008
3.00
Finish paint boot cowl, gear fairings etc
Details
       

 04-14-2008
5.00
Attach accessories to the firewall
Details
       

 04-13-2008
2.00
Prime boot cowl and inspection covers
Details

 04-12-2008
5.00
Installing pedals, cover firewall interior
Details
       

 04-10-2008
1.00
painting parts
Details

 04-10-2008
2.00
Installing floorboards and rudder pedals
Details

 04-07-2008
1.00
Install wear plates on the floorboards
Details
     

 04-06-2008
2.00
Floorboards and paint booth
Details
     

 04-05-2008
5.00
floorboards etc
Details

 04-04-2008
4.00
Instrument panel fitting and layout
Details

 04-01-2008
2.00
Fitting of the instrument panel blank
Details
     

 03-31-2008
1.00
More photos of the Milloway glare shield
Details
       

 03-30-2008
5.00
Install 1/4-turn fittings in boot cowl
Details
       

 03-29-2008
6.00
Continued boot cowl fitting
Details
       

 03-28-2008
3.00
Boot Cowl fitting continued

 03-24-2008
1.00
Fit boot cowl
Details
       

 03-23-2008
4.00
Mount firewall, engine mounts and fit boot cowl
Details
       

 03-22-2008
4.00
install flap control mechanism
Details

 03-21-2008
4.00
Assemble flap control

 03-15-2008
5.00
Assembling elevator control system
Details
       

 03-14-2008
2.00
Elevator push-pull tubes and yoke
Details

 03-12-2008
1.00
Assemble Elevator Yoke
Details
       

 03-06-2008
5.00
prep/paint torque tube, sticks etc
Details

 03-02-2008
3.00
Torque tube- first fitting
Details
       

 03-02-2008
1.00
Continuation of the torque tube fitting
Details
       

 02-27-2008
1.00
Tail wheel spring bushings
Details

 02-26-2008
0.50
Assemble tailwheel unit
Details

 02-18-2008
4.00
install landing gear leg
Details

 02-17-2008
4.00
brake assembly
Details

 02-16-2008
1.00
landing gear
Details

 02-13-2008
1.50
Assembling wheel/brake assembly
Details

 02-12-2008
1.00
fitting landing gear
Details

 02-08-2008
4.00
Mask and paint second stripes
Details
       

 02-07-2008
4.00
Mask and paint first stripes
Details
       

 02-06-2008
4.00
Layout stripes
Details
       

 02-05-2008
2.00
Layout of stripes on fuselage
Details

 02-03-2008
3.00
prep fuselage for stripe
Details

 01-01-2008
4.00
Apply final coat of finish paint to fuselage
Details
       

 12-31-2007
3.00
Sand first coat of finish paint on the fuselage
Details

 12-31-2007
7.00
Applysecond coat of paint to the fuselage
Details

 12-30-2007
5.00
Apply first cross-coat of finish paint to the fuse
Details

 12-29-2007
3.00
Sand final coat of primer
Details

 12-28-2007
3.00
Apply final coat of primer to fuselage
Details
     

 12-26-2007
3.00
Sand Primer on Fuselage
Details

 12-24-2007
4.00
Primer fuselage
Details

 12-15-2007
5.00
sprayed primer on fuselage
Details

 12-10-2007
3.00
sand fuselage
Details
       

 12-09-2007
7.00
Finish prep work and prime fuselage
Details

 12-08-2007
4.00
fabricate fuselage brackets for stands
Details