Date
|
Hours
|
Work Log Summary
|
Details
|
10-04-2009
|
2.00
|
Rigging flaps etc
|
Details
|
|
|
09-25-2009
|
2.00
|
Wing root cuffs- installation
|
|
|
|
09-23-2009
|
2.00
|
fit and paint pitot tube assembly
|
Details
|
|
|
09-20-2009
|
3.00
|
Wing root cuff fitting
|
Details
|
|
|
09-13-2009
|
8.00
|
Struts, washout etc
|
Details
|
|
|
09-05-2009
|
1.00
|
Photo page
|
Details
|
|
|
07-15-2009
|
5.00
|
wire wingtip nav lites, install wingtips, panel li
|
Details
|
|
|
06-14-2009
|
2.00
|
remove ailerons- prep for painting stripes
|
Details
|
|
|
06-09-2009
|
1.00
|
Begin center rib installation
|
Details
|
|
|
06-07-2009
|
6.00
|
Install wings in shop
|
Details
|
|
|
06-06-2009
|
5.00
|
Strut fittings etc
|
Details
|
|
|
06-05-2009
|
3.00
|
Strut fitting installation
|
Details
|
|
|
06-03-2009
|
3.00
|
Finish root-rib covers, start strut assembly
|
Details
|
|
|
06-02-2009
|
1.00
|
Root-rib panels (part two)
|
Details
|
|
|
06-02-2009
|
1.00
|
Root rib cover panel installation (part 3)
|
Details
|
|
|
06-02-2009
|
3.00
|
install wing root-rib panels (part one)
|
Details
|
|
|
06-01-2009
|
4.00
|
Begin installation of root-rib covers and misc wor
|
Details
|
|
|
05-31-2009
|
3.00
|
Paint root-rib cover panels, upper motor cowl etc
|
Details
|
|
|
05-30-2009
|
3.00
|
Paint root rib covers, upper cowl and Jury Strut p
|
Details
|
|
|
05-29-2009
|
3.00
|
Fit root rib covers, fuel sight gauges
|
Details
|
|
|
05-28-2009
|
4.00
|
Gap seals, flap teleflex cable, fuel vent tube
|
Details
|
|
|
05-27-2009
|
5.00
|
Wing tip fitting, gap seals
|
Details
|
|
|
05-26-2009
|
3.00
|
Install hinges, nav-lite wiring
|
Details
|
|
|
05-25-2009
|
5.00
|
Wingtip, aileron & flap fairings etc
|
Details
|
|
|
05-24-2009
|
5.00
|
Tip fitting, flap teleflex cable installation
|
Details
|
|
|
05-18-2009
|
2.00
|
Wingtip fitting etc
|
Details
|
|
|
05-17-2009
|
3.00
|
Gap seals & fitting wing tip
|
Details
|
|
|
05-16-2009
|
2.00
|
Gap seals
|
Details
|
|
|
05-15-2009
|
2.00
|
Gap Seals
|
Details
|
|
|
05-14-2009
|
3.00
|
Install aileron & start gap seals
|
Details
|
|
|
05-13-2009
|
3.00
|
Install flap, lay out route for nav lite wires in
|
Details
|
|
|
05-12-2009
|
3.00
|
Install hinges & horn on Flaps, trial fit flaps
|
|
|
|
05-09-2009
|
3.00
|
Install spades & counter weights on ailerons
|
Details
|
|
|
05-08-2009
|
3.00
|
Shape and trim to weight- aileron couter weights
|
Details
|
|
|
05-06-2009
|
3.00
|
casting aileron counter weights
|
Details
|
|
|
05-04-2009
|
2.00
|
installing aileron horns & hinges
|
|
|
|
05-01-2009
|
3.00
|
painting ailerons and flaps
|
Details
|
|
|
04-30-2009
|
3.00
|
Painting control surfaces
|
Details
|
|
|
04-28-2009
|
3.00
|
painting control surfaces
|
Details
|
|
|
04-20-2009
|
3.00
|
Fuel tank issue
|
Details
|
|
|
12-17-2007
|
9.00
|
Sand wings- first primer coat
|
Details
|
|
|
12-01-2007
|
1.00
|
more photos of grey stripes on wings
|
|
|
|
11-30-2007
|
6.00
|
Paint green trim on wing tips
|
Details
|
|
|
11-25-2007
|
10.50
|
Sand and paint wings
|
Details
|
|
|
11-24-2007
|
10.00
|
sand wings. Apply first finish coat
|
Details
|
|
|
11-23-2007
|
8.00
|
sanded wings, applied final primer coat as needed
|
Details
|
|
|
11-22-2007
|
3.00
|
Final coat of primer on wings
|
Details
|
|
|
11-21-2007
|
3.00
|
Clean and apply star patches
|
Details
|
|
|
11-20-2007
|
5.00
|
Sanding wings (second cross-coat)
|
|
|
|
11-19-2007
|
2.00
|
sanding wing primer
|
Details
|
|
|
11-18-2007
|
5.00
|
Spray second cross-coat of primer on wings
|
|
|
|
11-16-2007
|
7.50
|
Spray first coat of primer on wings
|
Details
|
|
|
11-12-2007
|
2.00
|
Mask wing roots and fittings for painting
|
Details
|
|
|
11-04-2007
|
3.00
|
Fabricate wing stands
|
Details
|
|