Powered By Kitlog Pro v2.0
Ron Lendon's Aircraft Mfg.
Light Sport Recumbent Bike
None
Work Logs Found:
100
Category Work Time:
190 Hours
Date
Hours
Work Log Summary
Details
07-20-2008
3.00
Change angle on Fork, more trail
Details
07-12-2008
5.00
Another Rear Axel Fix
Details
07-11-2008
3.00
Test ride faster
Details
07-11-2008
1.00
Repaired axel mount
Details
07-09-2008
4.00
Load it up and test ride
Details
07-08-2008
1.00
Assembled and test ride trailer
Details
07-02-2008
1.00
Rear carrier
Details
06-09-2008
3.00
Paint, Clean, Weld
Details
05-29-2008
2.00
Sandblast, clean and prime
Details
04-02-2008
4.00
Cable and test ride
Details
04-01-2008
1.00
Lengthen pedal crank support
03-31-2008
2.50
Handel bars and trim
Details
03-29-2008
2.00
Chain guide roller
Details
03-28-2008
2.00
Chain
Details
03-27-2008
1.00
Seat mounting
Details
03-27-2008
1.00
Seat Mounting
Details
03-26-2008
2.00
Seat work
Details
03-25-2008
2.00
Seat work
Details
03-23-2008
2.00
Make holes for mounting and split some tube
Details
03-23-2008
2.50
Made nylon chain rub blocks
Details
03-21-2008
1.00
Weld seat frame
Details
03-21-2008
2.50
Seat frame
Details
03-21-2008
1.00
Seat Frame
Details
03-19-2008
2.00
Shaped tubes for under seat
Details
03-17-2008
0.50
Shaped the seat pan plate
Details
03-17-2008
2.00
Finished shock brace and started seat.
Details
03-16-2008
2.00
Reset height and modify brace for rear shock
Details
03-15-2008
1.00
Remove rear shock brace
Details
02-27-2008
2.00
First time on wheels
Details
02-25-2008
0.50
Tack weld lugs for steering rod
Details
02-21-2008
3.50
Make steering link
Details
02-19-2008
2.00
Cross brace for spring
Details
02-17-2008
0.50
Setup frame for welding
Details
02-17-2008
0.50
Setup frame for welding
Details
02-17-2008
1.00
Finish welding rear frame swing arm
Details
02-16-2008
1.00
Join swing arm to front frame 4 of 4
Details
02-16-2008
1.00
Join swing arm to front frame 3 of 4
Details
02-16-2008
1.00
Join swing arm to front frame 2 of 4
Details
02-16-2008
1.00
Join swing arm to front frame 1 of 4
Details
02-15-2008
2.00
Kids 20" off road donor bike
Details
02-13-2008
2.50
Assembly of front suspension
Details
02-09-2008
1.00
Cut and fit Front Springs
Details
02-05-2008
2.50
Making tool to clean up inside of fork tubes
Details
02-01-2008
2.00
Weld outer fork tubes
Details
01-30-2008
2.50
Grind weld on inner, layout and cut outer forks
Details
01-28-2008
0.50
Weld fork tube inners
Details
01-28-2008
1.00
Cut inner fork tubes down
Details
01-28-2008
1.00
Cut down steering pivot outer.
Details
01-27-2008
1.00
Modify steering so it will work.
Details
01-27-2008
1.00
Modify steering so it will work.
Details
01-26-2008
1.00
Welding idler cap
Details
01-26-2008
1.00
Tear down front forks
Details
01-26-2008
1.00
Cap end of deraillier
Details
01-25-2008
2.00
Getting the idler sproket ready
Details
01-25-2008
2.00
Getting the idler sproket ready
Details
01-24-2008
1.50
Prep Swing Arm and Idler Sprocket
Details
01-21-2008
2.50
Main frame small components
Details
01-21-2008
3.00
Finished sizing bushings on swing arm
Details
01-20-2008
2.00
Seat post adjuster
Details
01-20-2008
2.00
Make up front derailleur post
Details
01-20-2008
2.00
Finish Derailleur post, begin seat adjuster
Details
01-19-2008
6.00
Made replacement pin for swing arm
Details
01-18-2008
2.00
Bore swing arm
Details
01-17-2008
1.50
Tear down donor bike and bore bushings
Details
01-13-2008
1.83
Prep and weld main tube parts together
Details
01-13-2008
1.83
Prep and weld main tube parts together
Details
01-13-2008
1.83
Prep and weld main tube parts together
Details
01-11-2008
3.00
Steering / handelbar pivot
Details
01-10-2008
1.00
Steering pivot and seat post holes
Details
01-09-2008
2.50
Made ends for seat brace & drilled HB pivot
Details
01-05-2008
2.50
Setup and machine steering stem
Details
01-05-2008
2.50
Machine steering stem hole
01-04-2008
2.50
Weld Rear Pivot Plates
Details
01-04-2008
2.50
Machine upright seatpost hole
Details
12-30-2007
3.00
Fabricate the Rear Pivot Plates.
Details
12-30-2007
3.00
Fabricate the Rear Pivot Plates
Details
12-28-2007
1.00
Weld slip pipe pedal crank housing
Details
12-28-2007
2.00
Fit main upright and make spacer
Details
12-28-2007
1.00
Cut main upright from old frame
Details
12-27-2007
0.50
Weld rear pivot
Details
12-27-2007
1.00
Prepare for welding
Details
12-27-2007
3.50
Prep on Slip Pipe for Pedal Crank.
Details
12-26-2007
3.00
Main Tube Machining
Details
12-26-2007
3.50
Machining rear suspension mount
Details
12-26-2007
1.50
Finish machining pivot hole
Details
12-25-2007
3.00
Adjust main tube for flat
Details
12-24-2007
2.50
Weld Main Tube
Details
12-24-2007
2.50
Weld Main Tube
Details
11-19-2007
2.50
Layout and cut Main Frame Tube
Details
11-19-2007
0.60
Layout & cut Main Frame Tube
Details
11-19-2007
2.50
Cut Main Frame Tube
Details
11-19-2007
0.50
Bend Main Frame Tube
Details
11-18-2007
2.00
Layout Main Frame Tube
Details
10-27-2007
2.00
Clean up cutoff parts
Details
10-26-2007
1.00
Cutoff parts of the frame
Details
10-25-2007
1.00
Cut off ears and grind pedal crank
Details
10-24-2007
1.00
Cut welds around pedal crank
Details
10-23-2007
2.00
Cut welds around pedal crank
Details
10-22-2007
3.00
Tear down
Details
10-18-2007
1.00
Core for the Light Sport Recumbent
Details
SITE NAVIGATION
Contact Builder
CZAW CH601XL Home
Light Sport Recumbent Bike Home
Category
# Logs
# Hours
All
104
144
Miscellaneous
3
-74
None
100
196
Shop Supplies
1
22
Zodiac CH 601 XL Home
Copyright © 2001-2024 Matronics. All Rights Reserved.