Date
|
Hours
|
Work Log Summary

|
Details

|
07-08-2019
|
1.00
|
try alternate strut ball placement
|
Details
|
|
|
07-08-2019
|
1.00
|
re-install baggae door
|
Details
|
|
|
07-06-2019
|
2.00
|
flox in bracket; add 2 BID
|
Details
|
|
|
07-06-2019
|
2.00
|
fab strut attach bracket
|
Details
|
|
|
06-27-2019
|
1.25
|
plan placement' drill hinge for stud; fab phenolic
|
Details
|
  |
|
06-26-2019
|
0.00
|
Order parts for baggage door strut mod
|
Details
|
  |
|
04-23-2018
|
1.50
|
replace front door spindle & adjust latches
|
|
|
|
04-11-2018
|
1.50
|
attempt to repair spindle in door handle
|
Details
|
|
|
09-09-2013
|
3.25
|
prep and micro inside of fuselage
|
Details
|
|
|
09-09-2013
|
0.25
|
clean up flox release at seat pans
|
|
|
|
03-18-2013
|
3.50
|
rehang door and adjust pump
|
|
|
|
03-18-2013
|
0.00
|
mess with door seal pump; adjust, troubleshoot
|
Details
|
|
|
03-17-2013
|
0.00
|
turn 1/2 turn CCW
|
Details
|
 |
|
03-17-2013
|
4.00
|
pull door; prep to install door seal
|
|
|
|
03-17-2013
|
0.00
|
modify caulk gun to apply silicone
|
Details
|
|
|
03-17-2013
|
2.50
|
Install door seal with silicone adhesive
|
Details
|
|
|
03-17-2013
|
0.00
|
door seal install continued
|
|
|
|
10-27-2012
|
2.50
|
belly antenna; replace B battery
|
Details
|
|
|
10-17-2012
|
0.00
|
fair in cowling front edge; reattach spinner backi
|
Details
|
|
|
10-17-2012
|
0.00
|
cowl inlet measurements
|
|
|
|
10-17-2012
|
4.00
|
continue work on cowl inlets
|
Details
|
|
|
10-14-2012
|
4.50
|
ground plane strips to belly; continue cowl inlet
|
|
  |
|
10-08-2012
|
4.00
|
sand & shape cowl inlets; coat #2 of Super-fill
|
Details
|
|
|
09-23-2012
|
2.00
|
prep and add super-fill antenna ground plane
|
Details
|
 |
|
09-23-2012
|
2.50
|
bodywork cowl inlets
|
Details
|
|
|
09-17-2012
|
4.25
|
modify cowl inlets
|
Details
|
|
|
09-17-2012
|
3.75
|
1 BID to COM belly antenna copper strips
|
Details
|
|
|
09-05-2012
|
2.00
|
3 BID to opposite cowl inlet halves
|
|
|
|
09-03-2012
|
2.00
|
3 BID to half of cowling inlets
|
Details
|
|
|
08-27-2012
|
3.00
|
WLS primer to rest of parts/fuselage
|
Details
|
|
|
08-27-2012
|
5.75
|
WLS primer to interior
|
Details
|
|
|
05-21-2012
|
0.25
|
sand lower cowl flange from spinner rub
|
|
 |
|
05-20-2012
|
0.50
|
add temp. weatherstrip to front door
|
Details
|
|
|
05-09-2012
|
1.00
|
seats and interior panels back in
|
Details
|
 |
|
05-07-2012
|
1.50
|
WLS to floor, flaps and nose fairing
|
Details
|
|
|
04-16-2012
|
1.00
|
micro upper fuselage joggles - both sides
|
Details
|
|
|
04-02-2012
|
1.75
|
sand lower cowl; 3 BID thin spot
|
Details
|
  |
|
04-02-2012
|
1.75
|
modify nose strut fairing
|
Details
|
|
|
04-02-2012
|
1.75
|
add'l nose fairing; re-install seats & panels; RTV
|
Details
|
|
|
03-31-2012
|
2.00
|
seats & panels out; misc. fine tune items
|
Details
|
|
|
03-31-2012
|
1.25
|
core out aft panel; flox to lower panel flange
|
Details
|
|
|
03-26-2012
|
1.25
|
install clips to hold tow bar
|
Details
|
|
|
03-19-2012
|
2.50
|
re-install parking brake and re-bleed system
|
|
|
|
03-19-2012
|
1.00
|
|
Details
|
|
|
03-12-2012
|
2.25
|
various small tasks for rest of a beautiful day
|
Details
|
|
|
03-11-2012
|
0.25
|
tape bottom wing fairing; check engine bolts
|
Details
|
  |
|
03-11-2012
|
0.00
|
placard door seal switch
|
Details
|
 |
|
03-11-2012
|
1.25
|
cowling on, wheel pants in position
|
Details
|
|
|
03-03-2012
|
5.25
|
misc. tasks; condition inspection
|
Details
|
  |
|
02-25-2012
|
1.00
|
Rosen visors in and misc shop
|
Details
|
|
|
02-25-2012
|
0.50
|
mount registration card; compass card
|
|
|
|
02-25-2012
|
0.50
|
install step
|
Details
|
|
|
02-25-2012
|
0.50
|
clean windows with Sumner 210 from ACS
|
Details
|
  |
|
02-20-2012
|
1.75
|
modify fuel tunnel
|
|
|
|
02-20-2012
|
2.00
|
modify and redo/install seats and forward interior
|
Details
|
 |
|
02-13-2012
|
0.00
|
INTERIOR PANEL INSTALL ORDER
|
Details
|
  |
|
02-13-2012
|
1.75
|
interior close-outs; seat belts; seats in
|
|
|
|
02-13-2012
|
1.75
|
add'l interior close-outs
|
|
|
|
02-13-2012
|
1.75
|
add'l interior close-outs
|
|
|
|
02-13-2012
|
1.75
|
add'l interior close-outs
|
|
|
|
02-12-2012
|
1.25
|
start installing all panels for inspection
|
|
|
|
02-12-2012
|
0.75
|
sand, prep & prime delrin door guide area
|
|
|
|
02-11-2012
|
2.50
|
fit & trim left side interior panels
|
Details
|
|
|
01-30-2012
|
0.25
|
velcro door strap & registration packet
|
Details
|
|
|
01-30-2012
|
0.25
|
temporarily placard AOA, static, oil capacity
|
|
|
|
01-30-2012
|
0.50
|
pressurize nose strut; ~300#...1.5" extension
|
Details
|
  |
|
01-30-2012
|
2.75
|
install front lap & shoulder belts; clean door han
|
|
|
|
01-30-2012
|
1.50
|
adj door pin, prep and flox in
|
|
|
|
01-30-2012
|
0.00
|
add'l seat belt installation pics
|
|
|
|
01-29-2012
|
1.00
|
true up aft end of top cowl;reinstall cowlings
|
|
|
|
01-29-2012
|
0.50
|
temp. bolt L front seat in
|
|
  |
|
01-29-2012
|
1.00
|
loctite all jam nuts within fuselage
|
Details
|
  |
|
01-28-2012
|
0.75
|
finish installing overhead console with SS cap scr
|
|
  |
|
12-24-2011
|
0.50
|
use old Maggie leash for door pull down strap
|
Details
|
|
|
12-24-2011
|
4.25
|
level and micro bubble level in; drain fuel; measu
|
Details
|
|
|
12-24-2011
|
0.00
|
add'l pics...bubble level micro'd in; nose strut
|
|
|
|
12-19-2011
|
3.25
|
prep & prime cowling and wheel pants
|
Details
|
|
|
12-18-2011
|
3.00
|
remove forms, sand, apply s/f #2
|
|
|
|
12-18-2011
|
0.25
|
paint o/h console and screws....blue; close match
|
Details
|
|
|
12-17-2011
|
3.00
|
grind/sand lower cowling flange
|
|
|
|
12-17-2011
|
0.25
|
epoxy to top of aft seat parts
|
Details
|
 |
|
12-17-2011
|
0.00
|
build forms for bodywork to top cowling
|
|
|
|
12-11-2011
|
0.25
|
reverse door strut again
|
Details
|
 |
|
12-05-2011
|
0.25
|
work on door strut
|
Details
|
 |
|
12-05-2011
|
0.50
|
start OH console panels; drill
|
|
|
|
12-05-2011
|
0.00
|
right side top cowl pics
|
Details
|
|
|
12-05-2011
|
2.00
|
fit, trim & mark top cowling > adding new flange;
|
|
|
|
12-05-2011
|
1.00
|
attach eyeball vents to OH console panels
|
|
|
|
12-05-2011
|
1.25
|
adels to brake line & install left armrest
|
|
|
|
11-30-2011
|
0.50
|
micro flange... low spots and weave
|
|
 |
|
11-30-2011
|
1.50
|
micro armrest edges and hard points
|
|
 |
|
11-30-2011
|
2.00
|
2 BID to top cowling foam
|
|
|
|
11-26-2011
|
0.50
|
trim front door jamb
|
Details
|
|
|
11-26-2011
|
2.50
|
replace strut; remove parking brake and re-bleed;
|
Details
|
|
|
11-26-2011
|
0.00
|
foam applied for cowl flange rebuild
|
|
 |
|
11-26-2011
|
1.50
|
fit and trim top cowl; super glaue foam on for lay
|
Details
|
|
|
11-07-2011
|
2.50
|
fabricate left armrest
|
Details
|
|
|
11-07-2011
|
2.25
|
apply N numbers
|
Details
|
|
|
10-31-2011
|
1.00
|
install baggage door bolts and seal
|
|
|
|
10-24-2011
|
1.50
|
misc tasks to finish up day
|
Details
|
  |
|
10-24-2011
|
1.00
|
install front door lock and door access cover
|
Details
|
  |
|
10-24-2011
|
0.50
|
install 14oz Halon fire extinguisher under and fro
|
|
|
|
10-17-2011
|
0.50
|
scrape foam blobs off all surfaces...ready to sand
|
|
  |
|
09-21-2011
|
2.50
|
Plan B for defroster & glare shield
|
Details
|
|
|
09-05-2011
|
0.75
|
install aft seats belts
|
Details
|
|
|
08-29-2011
|
0.25
|
pull out defroster; sand prep for flox in
|
|
  |
|
08-29-2011
|
0.75
|
prep & epoxy front floor boards
|
|
  |
|
08-28-2011
|
1.50
|
prep and epoxy prepreg areas
|
Details
|
|
|
08-28-2011
|
2.00
|
fool with defroster install...tight
|
|
  |
|
08-27-2011
|
0.50
|
thread rudder stop bolt; fool with GPS
|
Details
|
 |
|
07-28-2011
|
1.25
|
re-attach both control sticks; used new AN4-25 bol
|
Details
|
|
|
07-25-2011
|
0.50
|
clean up gook on windows; fridge from Duncan
|
Details
|
  |
|
07-11-2011
|
2.75
|
sand, tape & micro window fillets
|
|
|
|
07-11-2011
|
1.50
|
sand down ELT door to fit
|
Details
|
|
|
07-11-2011
|
0.00
|
add'l fillet prep
|
|
|
|
07-10-2011
|
9.50
|
tape-grind-sand-prep-s/f window fillets
|
Details
|
|
|
07-10-2011
|
0.00
|
super-fill window fillets - add'l pics
|
|
|
|
07-04-2011
|
0.75
|
visor mounts; fit and tap 1 hole
|
Details
|
|
|
07-04-2011
|
2.50
|
paint defroster; pull window paper
|
Details
|
|
|
07-04-2011
|
0.00
|
behind panel shots thru windshield
|
|
|
|
07-04-2011
|
0.00
|
|
Details
|
|
|
06-17-2011
|
3.25
|
pinhole hunting; sand-prep-super-fill
|
Details
|
 |
|
06-13-2011
|
5.75
|
sand, s/f, vac, prep & WLS primer
|
|
|
|
06-12-2011
|
1.75
|
vac, prep. & superfill fuselage low grain/spots
|
|
  |
|
06-12-2011
|
2.50
|
sand fuselage and HS in prep for another WLS prime
|
|
|
|
06-12-2011
|
1.00
|
s/f fillet to inside door jamb
|
|
|
|
06-12-2011
|
0.00
|
leveling marks - add'l pics
|
Details
|
|
|
06-12-2011
|
0.50
|
level & install permanent leveling marks
|
Details
|
|
|
06-12-2011
|
0.75
|
door strut back on & misc
|
Details
|
|
|
06-12-2011
|
0.00
|
add'l leveling mark pics
|
Details
|
|
|
06-05-2011
|
3.00
|
WLS primer to fuselage, VS and HS root
|
|
|
|
06-05-2011
|
0.00
|
fit lock to door and check tab
|
Details
|
|
|
06-05-2011
|
0.75
|
fab lock tab for front door
|
Details
|
|
|
06-05-2011
|
2.00
|
Add'l primer pics; Ned Smith visited
|
Details
|
|
|
06-04-2011
|
1.75
|
sand all of fuse, VS and HS....vacuum..ready for W
|
Details
|
  |
|
06-03-2011
|
3.25
|
sand fuse and door jamb
|
Details
|
  |
|
05-22-2011
|
1.00
|
hysol/flox aileron stops to fuse wall
|
|
|
|
05-22-2011
|
1.50
|
figure out & fab aileron stops
|
Details
|
|
|
05-22-2011
|
0.75
|
another pass of super-fill
|
Details
|
|
|
05-16-2011
|
0.75
|
pop baggage locks, sand, fit, good!
|
|
|
|
05-16-2011
|
0.00
|
baggage locks cont'd
|
|
|
|
05-16-2011
|
4.50
|
add'l prep and bodywork
|
Details
|
|
|
05-15-2011
|
3.25
|
trim baggage blocks; sand; work on inside door jam
|
|
|
|
05-15-2011
|
2.00
|
sand, prep, vac. door hinge; fuselage elev plate a
|
|
|
|
05-15-2011
|
0.25
|
misc super-fill of fuselage; hinge area; baggage
|
|
  |
|
05-14-2011
|
1.50
|
door hinge release; 3 BID delrin baggage blocks
|
|
|
|
05-09-2011
|
1.50
|
super-fill #3 to fuselage joggle
|
Details
|
  |
|
05-09-2011
|
1.75
|
more baggage door work - flox in delrin blocks, et
|
Details
|
|
|
05-09-2011
|
1.25
|
baggage door locks
|
Details
|
|
|
02-07-2011
|
0.75
|
lift fuselage top up on horses
|
Details
|
|
|
02-07-2011
|
3.25
|
fit & trim actual side panels
|
Details
|
 |
|
02-07-2011
|
2.50
|
final trim,rig, apply 2 BID flanges
|
Details
|
|
|
02-07-2011
|
1.25
|
do last panel- front right side
|
Details
|
|
|
02-07-2011
|
0.75
|
2 BID flange on aft seat cover
|
|
|
|
02-05-2011
|
0.75
|
split forward cover into 2 pieces
|
Details
|
|
|
02-05-2011
|
1.50
|
make cover for brake lines
|
Details
|
|
|
02-05-2011
|
1.25
|
2 BID side panel extensions
|
Details
|
 |
|
02-04-2011
|
4.50
|
interior side panels
|
Details
|
|
|
01-31-2011
|
0.75
|
trim & sand rest of micro'd parts
|
|
|
|
01-31-2011
|
1.25
|
retighten fuel hoses
|
Details
|
|
|
01-31-2011
|
0.75
|
grind and sand co-pilot stick opening
|
Details
|
|
|
01-31-2011
|
2.00
|
check hardware all elev rod ends; set jam nuts
|
Details
|
|
|
01-31-2011
|
0.75
|
aileron servo rod - bent threaded portion
|
Details
|
|
|
01-30-2011
|
0.75
|
trim out o/h vent fairing
|
|
|
|
01-30-2011
|
0.75
|
pop off o/h vent fairing lay-up; clean
|
|
|
|
01-30-2011
|
1.25
|
micro copilot stick cut out; seat belt slo
|
Details
|
|
|
01-29-2011
|
0.75
|
wing spar cover
|
Details
|
|
|
01-29-2011
|
1.75
|
vent fairing to aft o/h console
|
Details
|
|
|
01-29-2011
|
1.00
|
decore and micro edges - various pieces
|
|
 |
|
01-24-2011
|
0.50
|
trim baggage bracket layups; drill #12 hole for ha
|
Details
|
|
|
01-24-2011
|
0.50
|
release tape vent area at hat rack for layup
|
Details
|
  |
|
01-24-2011
|
0.50
|
add 3 BID to inside faces of baggage door brackets
|
|
  |
|
01-23-2011
|
1.00
|
set baggage brackets and 3 BID outsides
|
|
|
|
01-23-2011
|
0.75
|
micro edges of hat rack and elev TT cover
|
|
 |
|
01-23-2011
|
1.50
|
make baggage brackets; trim joggle
|
Details
|
|
|
01-23-2011
|
0.75
|
figure, measure and cut aft seat belt access hole
|
|
  |
|
01-23-2011
|
1.00
|
elev. rigging; cut co-pilot stick hole
|
Details
|
|
|
01-17-2011
|
1.25
|
vertical hat rack
|
Details
|
|
|
01-17-2011
|
0.75
|
horizontal part of hat rack
|
Details
|
|
|
01-17-2011
|
0.00
|
horizontal hat rack installed
|
|
 |
|
01-17-2011
|
0.50
|
fit elev torque tube cover; grind to fit
|
|
  |
|
01-17-2011
|
0.50
|
aft seat back latches
|
|
|
|
01-17-2011
|
0.00
|
|
|
 |
|
01-16-2011
|
0.25
|
modified cable nut to heat on/off valve
|
|
|
|
01-16-2011
|
0.75
|
mark, drill and grind 6 BID hat rack flange
|
|
|
|
01-16-2011
|
0.50
|
hardpoints to vertical hat rack
|
|
 |
|
01-16-2011
|
0.50
|
fool with missing parts for baggage door
|
Details
|
  |
|
01-16-2011
|
1.50
|
fit & drill aft seat latches; do hardpoints
|
Details
|
 |
|
01-16-2011
|
0.50
|
file shoulders down on cable nuts
|
Details
|
|
|
01-16-2011
|
2.75
|
fab hat rack bottom; 4 BID flange
|
Details
|
|
|
01-16-2011
|
1.25
|
bond 6 BID flange for hat rack to fuselage top
|
|
|
|
01-15-2011
|
1.50
|
prep vertical hat rack for bonding
|
Details
|
|
|
01-15-2011
|
1.50
|
plan and make template for hat rack vertical
|
|
 |
|
01-15-2011
|
0.00
|
ordered these cable nuts for parking brake and hea
|
Details
|
|
|
01-15-2011
|
1.25
|
micro aft seat bottom; grind baggage pads
|
Details
|
 |
|
01-15-2011
|
0.75
|
cable nut installs
|
Details
|
|
|
12-27-2010
|
0.50
|
seat bottom off - check flox release
|
Details
|
|
|
12-27-2010
|
1.25
|
prep phenolic pad, flox and 2 BID
|
|
|
|
12-27-2010
|
2.25
|
3 BID aft seat stiffener; plan seat latches & mark
|
|
|
|
12-26-2010
|
3.00
|
wire up flap motor and switches; grind seat cleara
|
|
|
|
12-26-2010
|
1.75
|
sand seat back square & bond stiffener on
|
|
|
|
12-26-2010
|
0.00
|
re-install flap motor
|
|
|
|
12-26-2010
|
0.75
|
grind seat clearance holes; flox release aft seat
|
Details
|
|
|
12-23-2010
|
0.00
|
micro another edge of seat back and stiffener
|
|
 |
|
12-23-2010
|
1.75
|
flox release was not good...will redo; grind and m
|
Details
|
|
|
12-20-2010
|
1.25
|
flox release aft seat botton; hard point; fill hol
|
|
 |
|
12-20-2010
|
2.50
|
cut seat back stiffener and seat back; prep; micro
|
|
|
|
12-19-2010
|
1.50
|
reverse rudder cables; turnbuckles to rear
|
Details
|
  |
|
12-13-2010
|
3.00
|
prep door frame for 2 BID to console
|
|
|
|
12-13-2010
|
0.00
|
add 2 BID to bond o/h console to door frame
|
Details
|
|
|
12-12-2010
|
1.25
|
sand and prep o/h for flox; primer coat #4
|
|
  |
|
12-12-2010
|
1.75
|
primer #2 to o/h; wire ties and flex hose
|
|
|
|
12-12-2010
|
1.50
|
flox in o/h console
|
|
|
|
12-12-2010
|
0.00
|
add'l floxing in pics
|
|
|
|
12-12-2010
|
0.50
|
2 coats of clear coat to o/h console
|
|
  |
|
12-11-2010
|
0.75
|
sand o/h console and primer coat #1
|
|
 |
|
12-11-2010
|
0.50
|
primer #2 to o/h console; adels and ties to panel
|
|
 |
|
12-06-2010
|
1.25
|
tygon tube for conduit for door seal pump wires
|
|
|
|
12-06-2010
|
1.00
|
super-fill #2 to o/h console; s/f #1 to defroster
|
|
  |
|
12-06-2010
|
2.50
|
sand & trim o/h console; cut to fit
|
|
|
|
12-06-2010
|
0.00
|
long view of rudder pedals with all brake hardware
|
|
 |
|
12-06-2010
|
1.00
|
finish up brake cylinder hardware
|
Details
|
|
|
12-05-2010
|
1.00
|
super-fill holes in o/h console
|
|
 |
|
12-05-2010
|
0.75
|
sand and prep defroster for super-fill
|
|
 |
|
12-05-2010
|
2.75
|
parking brake bracket and finish fresh air ducting
|
Details
|
  |
|
12-04-2010
|
0.00
|
test fit o/h console
|
|
|
|
12-04-2010
|
1.75
|
flox parking brake bracket
|
Details
|
|
|
12-04-2010
|
1.50
|
finish fresh air hose adel clamps; flip fuse
|
Details
|
|
|
12-04-2010
|
1.75
|
clamp up heat scat tubing
|
Details
|
|
|
12-01-2010
|
1.00
|
work on figuring out parking brake cable connectio
|
Details
|
|
|
12-01-2010
|
0.00
|
Matco parking valve diagram
|
Details
|
|
|
11-30-2010
|
2.00
|
run heat-defrost mix cable
|
|
|
|
11-30-2010
|
2.00
|
heat system
|
|
|
|
11-30-2010
|
0.00
|
heat and defrost valves
|
Details
|
|
|
11-28-2010
|
0.50
|
heat tube work; tee's, grind hole to aft seat
|
|
  |
|
11-27-2010
|
4.00
|
engineer and run fresh air and heat lines
|
Details
|
|
|
11-26-2010
|
0.50
|
micro flange in fresh air T
|
|
|
|
11-26-2010
|
1.50
|
fresh air system; make T 2 1/4" to 1 3/4"
|
|
|
|
11-26-2010
|
1.25
|
add 2 BID to make T adapter
|
|
|
|
11-21-2010
|
1.50
|
work on heat-defrost-fresh air layout
|
|
|
|
11-08-2010
|
0.50
|
prep & flox seat strips
|
Details
|
 |
|
11-08-2010
|
2.75
|
heat/defrost system
|
Details
|
|
|
11-08-2010
|
1.00
|
cut off defroster; touch up holes
|
|
|
|
11-07-2010
|
1.00
|
flox defroster close out and 1.5" tube for hose
|
|
|
|
11-07-2010
|
2.75
|
bond R armrest; prep and measure for BIDs
|
|
  |
|
11-07-2010
|
1.50
|
add 2 BID tapes to top and bottom of all arm rests
|
|
|
|
11-06-2010
|
3.75
|
heater-defrost-glare shield
|
Details
|
|
|
11-01-2010
|
2.00
|
prep & bond both aft armrests
|
Details
|
|
|
10-31-2010
|
0.75
|
undo aft seat belt gusset
|
Details
|
|
|
10-31-2010
|
0.75
|
top on to measure for arm rests
|
|
|
|
10-31-2010
|
0.00
|
not much room in glareshield area!
|
|
|
|
10-31-2010
|
3.50
|
fit armrests; cut & micro; ready for bonding
|
|
|
|
10-31-2010
|
1.75
|
fit and measure for armrests
|
Details
|
  |
|
10-31-2010
|
0.75
|
add handles to fuse to aid in handling
|
|
|
|
10-30-2010
|
2.00
|
add aft seat belt gusset; attach handles
|
Details
|
|
|
10-18-2010
|
0.75
|
fit and micro ELT access door
|
Details
|
|
|
10-03-2010
|
0.75
|
prep for 2 BID for static port
|
Details
|
 |
|
09-27-2010
|
1.00
|
flox in FU1 static port
|
|
|
|
09-27-2010
|
1.75
|
figure out static port and pull parts; bend pitot
|
Details
|
|
|
08-16-2010
|
1.25
|
rotate fuse and level; install rotissirie
|
|
|
|
08-16-2010
|
0.00
|
level fuselage
|
|
|
|
07-18-2010
|
0.50
|
repin castelated nuts for both front seats
|
|
|
|
05-03-2010
|
1.00
|
add holes to magnetomter shelf and micro in
|
Details
|
|
|
05-02-2010
|
1.25
|
work on avionics shelf layout; micro aft of magnet
|
|
  |
|
05-01-2010
|
1.25
|
sand seat belt floxing; add micro pads to mag. she
|
|
|
|
05-01-2010
|
1.75
|
design and rough up shelf for magnetometer
|
|
|
|
04-26-2010
|
1.50
|
servo pads; drill 7/8" holes for harness cable; cl
|
Details
|
|
|
04-25-2010
|
5.00
|
sand and prep cowl and nose fairing; WLS #2
|
|
|
|
04-25-2010
|
1.00
|
add 2 BID to AP servo phenolic blocks
|
|
 |
|
04-19-2010
|
1.75
|
super-fill pin holes on cowls, mostly on top cowl
|
|
  |
|
04-18-2010
|
5.00
|
sand cowl and nose fairing, prep, WLS #2
|
|
  |
|
04-18-2010
|
3.00
|
prep cowl, WLS primer #1
|
|
|
|
04-12-2010
|
1.50
|
sand cowls and nose wheel fairing again
|
|
  |
|
04-11-2010
|
1.25
|
super-fill cowl and nose leg fairing #2+
|
|
  |
|
04-11-2010
|
0.00
|
super-fill applied to cowl seams
|
|
|
|
04-11-2010
|
3.50
|
sand cowl seams after super-fill
|
|
|
|
04-11-2010
|
3.00
|
fit for cowling seams
|
|
|
|
03-28-2010
|
1.00
|
mark & measure a/p servos; measure for harness
|
Details
|
|
|
03-28-2010
|
0.75
|
grind and sand fuselage/cowling joggle
|
|
  |
|
03-28-2010
|
1.75
|
fit and trim oil door; sand cowlings again
|
Details
|
|
|
03-28-2010
|
2.75
|
bodywork cowling and nose gear fairing
|
Details
|
|
|
03-15-2010
|
0.00
|
seat belts holes
|
Details
|
|
|
03-15-2010
|
5.50
|
sand cowl halves; super-fill #2
|
Details
|
|
|
03-15-2010
|
0.50
|
figure interior panel measurements so I can order
|
Details
|
  |
|
03-15-2010
|
2.75
|
figure front seat belts and drill holes
|
Details
|
|
|
03-14-2010
|
1.75
|
Super-fill #1 to both cowl halves
|
|
|
|
03-14-2010
|
2.75
|
prep cowl halves for fill
|
|
|
|
03-14-2010
|
2.00
|
micro bottom of cowl spinner flange
|
Details
|
|
|
03-14-2010
|
3.00
|
fit & trim lower cowl spinner flange
|
Details
|
|
|
03-08-2010
|
2.00
|
trim and refit cowl
|
Details
|
|
|
03-08-2010
|
1.00
|
additional pics - skybolts installed
|
|
|
|
03-08-2010
|
2.50
|
add .2" micro to front lower cowl spinner flange
|
Details
|
|
|
03-07-2010
|
1.50
|
skybolts to aft nose gear fairing
|
Details
|
|
|
03-07-2010
|
1.75
|
shape foam and add 1 BID, peel ply
|
|
 |
|
03-07-2010
|
1.50
|
scarf clark foam to left side of cowl
|
Details
|
|
|
03-07-2010
|
0.50
|
retack foam pieces
|
|
|
|
03-07-2010
|
1.50
|
decore and super fill oil door and opening
|
|
|
|
03-07-2010
|
1.00
|
add nutplates to nose inlet
|
Details
|
 |
|
03-07-2010
|
0.00
|
|
|
|
|
02-22-2010
|
2.75
|
rest of cowl skybolts; nutplate for inlets
|
|
|
|
02-22-2010
|
2.00
|
fit nose fairing to lower cowling
|
|
|
|
02-22-2010
|
2.00
|
fit and align nose gear fairing
|
Details
|
|
|
02-22-2010
|
0.00
|
add'l pics.. skybolts to nose fairing
|
|
|
|
02-21-2010
|
3.00
|
skybolt installation continued
|
|
|
|
02-21-2010
|
3.25
|
install skybolts for cowling
|
Details
|
|
|
02-21-2010
|
3.00
|
install rest of skybolts including studs
|
Details
|
|
|
02-21-2010
|
1.00
|
fit and trim nose gear fairing
|
Details
|
 |
|
02-15-2010
|
1.50
|
make jig for Skybolts; fool with rivets
|
Details
|
  |
|
02-15-2010
|
3.00
|
drill rivet holes and enlarge pilot to 15/32
|
Details
|
|
|
02-15-2010
|
1.50
|
cut and grind access in fuse double joggle
|
Details
|
|
|
02-15-2010
|
0.00
|
Add'l Skybolt drilling pics
|
|
|
|
02-15-2010
|
1.00
|
1 BID over rivets for oil access door
|
|
 |
|
02-14-2010
|
0.10
|
spinner alignment issue
|
Details
|
|
|
02-14-2010
|
2.00
|
oil door; decore for hinge and cut; rivet hinges o
|
Details
|
|
|
02-14-2010
|
2.50
|
fit cowling;layout holes for skybolts; drill & cle
|
Details
|
|
|
02-14-2010
|
1.75
|
cut and rivet in Hartwell hinge for oil door
|
Details
|
|
|
02-13-2010
|
3.25
|
decore for oil door latch; 4 BID flange
|
|
|
|
02-05-2010
|
0.00
|
pics of top gap fuse to fuse joggle; flange width
|
Details
|
|
|
02-05-2010
|
0.50
|
cut oil access door; add 4 BID
|
|
  |
|
02-05-2010
|
6.50
|
continue cowl fitting and cutting
|
Details
|
|
|
02-05-2010
|
0.00
|
add'l pics
|
Details
|
|
|
02-05-2010
|
0.00
|
|
|
|
|
02-04-2010
|
5.00
|
fit upper & lower cowling; 1st pass trimming
|
Details
|
|
|
01-31-2010
|
7.50
|
relocate fuselage to hang engine
|
Details
|
|
|
01-31-2010
|
0.00
|
level fuselage in prep to mount nose strut
|
|
|
|
01-31-2010
|
1.00
|
layout cowl cuts
|
Details
|
|
|
01-25-2010
|
4.50
|
final sand, prep and prime fuse sides
|
Details
|
|
|
01-24-2010
|
1.00
|
sand right fuselage; super-fil #3
|
|
  |
|
01-24-2010
|
2.75
|
sand fuse sides; prep and apply super-fil
|
|
  |
|
01-24-2010
|
2.00
|
rivet 12 nutplates to each opening
|
Details
|
|
|
01-24-2010
|
0.25
|
micro small dimple in aft R fuselage
|
|
|
|
01-24-2010
|
1.00
|
2 BID inside of NACA scoop flange
|
Details
|
|
|
01-24-2010
|
1.00
|
|
Details
|
|
|
01-18-2010
|
2.50
|
WLS primer to fuselage bottom; 2 coats
|
Details
|
|
|
01-18-2010
|
0.00
|
flox in air inlet to console
|
Details
|
|
|
01-18-2010
|
2.50
|
final sand of fuselage bottom & prep for WLS prime
|
|
  |
|
01-18-2010
|
1.50
|
fabricate air inlet for console; flox in place
|
|
 |
|
01-17-2010
|
3.25
|
sand fuse bottom; trim flap cover flange repair
|
Details
|
|
|
01-17-2010
|
1.25
|
prep & S/F #3 fuselage bottom
|
|
  |
|
01-17-2010
|
1.50
|
design & fabricate fresh air vent tube from o/h co
|
Details
|
|
|
01-16-2010
|
1.50
|
WLS # 2 bottom of ailerons & elevators
|
|
 |
|
01-16-2010
|
1.75
|
prep and S/F #2 to fuselage bottom
|
|
  |
|
01-11-2010
|
2.75
|
sand fuse bottom
|
Details
|
|
|
01-11-2010
|
2.00
|
fit & trim access covers; vac. fuselage
|
|
|
|
01-11-2010
|
2.00
|
fairing access covers; fit, fix and trim
|
Details
|
|
|
12-26-2009
|
1.25
|
super-fil pass #1 to fuselage bottom
|
|
|
|
12-26-2009
|
1.25
|
seats off, roll fuse; fit flap,aileron,tip
|
Details
|
|
|
12-26-2009
|
1.25
|
sand & prep fuse bottom for super-fil #1
|
|
  |
|
12-26-2009
|
1.00
|
clean up step bracket and re-do aft air vent drain
|
|
|
|
12-21-2009
|
0.50
|
trim elev torque tube cover
|
|
  |
|
12-21-2009
|
1.00
|
fit & trim elev tube access holes in aft seat flan
|
|
|
|
12-21-2009
|
1.00
|
decore and micro elev holes in aft seat flange
|
|
|
|
12-14-2009
|
2.00
|
drill holes and add 10-32 rivnuts to torque tube c
|
Details
|
|
|
12-14-2009
|
0.75
|
cut 4 BID fir elev. cover
|
Details
|
  |
|
12-14-2009
|
1.75
|
4 BID to elev. torque tube cover
|
|
|
|
12-13-2009
|
0.50
|
prep & micro fwd edge of elev. TT cover
|
|
 |
|
12-07-2009
|
1.75
|
flox in parking brake valve; 2 BID
|
|
|
|
12-07-2009
|
1.00
|
figure brake fittings and connect brake lines
|
Details
|
|
|
12-07-2009
|
1.25
|
fabricate top elev tube cover
|
|
|
|
12-07-2009
|
2.50
|
design/fit elev. torque tube cover
|
Details
|
|
|
12-07-2009
|
0.00
|
add'l parking brake pics
|
|
|
|
11-29-2009
|
1.00
|
design and fit parking brake
|
Details
|
|
|
11-29-2009
|
1.25
|
2 BID aft seat flange - aft side
|
Details
|
|
|
11-28-2009
|
1.00
|
riv-nuts for top part of hinge
|
Details
|
|
|
11-28-2009
|
1.25
|
drill and rivit aft seat hinge
|
Details
|
|
|
11-14-2009
|
1.50
|
6 BID flange for folding seat back
|
Details
|
 |
|
11-09-2009
|
1.50
|
bond in lower seat back, 2 BID flange/fuselage
|
|
|
|
11-02-2009
|
0.50
|
figure parking brake; dev. parts needed list
|
|
  |
|
11-02-2009
|
1.00
|
continue on aft seat back geometry
|
|
|
|
11-02-2009
|
1.25
|
bond in aft seat flanges with flox
|
|
|
|
11-01-2009
|
1.75
|
prep 3 BID and 4 BID for at seat
|
Details
|
|
|
11-01-2009
|
1.25
|
3 BID front of seat back flange and flip L wing ov
|
|
 |
|
10-26-2009
|
2.75
|
fabricate and prep at seat flanges, etc
|
Details
|
|
|
10-26-2009
|
2.00
|
apply 18 BID to fwd seatbelt gusset
|
Details
|
 |
|
10-18-2009
|
3.00
|
forward seat belt gusset
|
Details
|
|
|
10-18-2009
|
3.00
|
figure/design rear saet flange
|
Details
|
|
|
10-18-2009
|
1.00
|
cut 4 sets of 9 BID for fwd gusset-seat belt
|
|
  |
|
10-05-2009
|
1.50
|
sand r fuse, s/f #4
|
|
  |
|
09-28-2009
|
2.75
|
sand right fuselage; s/f #2
|
|
  |
|
09-27-2009
|
1.25
|
sand R fuselage and super-fill
|
|
 |
|
08-30-2009
|
0.75
|
sand left fuselage again
|
|
|
|
08-30-2009
|
2.00
|
sand and prep right side of fuse for micro
|
|
|
|
08-30-2009
|
2.00
|
place and drill hole for tail tie down ring
|
Details
|
|
|
08-30-2009
|
0.25
|
grind out i/s of naca vent
|
|
 |
|
08-17-2009
|
3.50
|
sand fuselage - round #2
|
Details
|
|
|
08-16-2009
|
2.00
|
sanded and Super-filled left side of fuselage...mo
|
Details
|
|
|
08-10-2009
|
0.50
|
grind excess micro from NACA scoop
|
Details
|
|
|
08-03-2009
|
1.00
|
Decore & micro NACA scoop; pull clecos
|
|
 |
|
08-02-2009
|
0.10
|
place NACA scoop on left side of fuselage
|
Details
|
|
|
08-02-2009
|
0.50
|
figure out where to put NACA fresh air scoop
|
Details
|
|
|
08-02-2009
|
2.75
|
|
Details
|
|
|
07-20-2009
|
0.75
|
micro floor boards, 2nd pass
|
|
|
|
07-12-2009
|
1.75
|
test fit 1:1 panel print out
|
Details
|
|
|
07-12-2009
|
0.10
|
panel pics #3
|
|
|
|
07-12-2009
|
0.10
|
more panel fitting pics
|
|
|
|
07-12-2009
|
0.50
|
drill battery box holes;
|
|
|
|
07-12-2009
|
0.75
|
2 BID FS185 to fuselage
|
|
|
|
07-06-2009
|
1.50
|
fabricated battery box hardpoints & shims
|
Details
|
|
|
05-11-2009
|
2.00
|
mount rotisserie with Phil's help
|
Details
|
|
|
05-11-2009
|
2.00
|
fit rotisserie and cut floorboards for bolt access
|
|
|
|
05-10-2009
|
2.50
|
Begin set up of rotisserie
|
|
  |
|
04-12-2009
|
0.50
|
research 740 and 720 black cables; measure all cab
|
Details
|
|
|
04-12-2009
|
0.50
|
remove panel; pack up to take to SNF for Aerotroni
|
|
  |
|
04-12-2009
|
0.10
|
measurements for panel shop
|
|
|
|
04-12-2009
|
1.00
|
instrument panel fit #2
|
|
|
|
04-12-2009
|
0.75
|
install 2 nutplates to 4 BID bracket on each side
|
|
|
|
04-12-2009
|
1.00
|
fit instrument panel
|
Details
|
|
|
04-11-2009
|
0.75
|
pul parts for panel install.
|
|
  |
|
04-11-2009
|
1.00
|
pop use top; fit panel bank
|
|
|
|
04-11-2009
|
1.00
|
fit fuselage
|
Details
|
|
|
04-11-2009
|
1.00
|
fit & trim panel to fuselage; 2 screws each side t
|
|
|
|
04-11-2009
|
2.00
|
after adding 4 BID for flanges
|
|
|
|
03-09-2009
|
0.50
|
pop bellcrank bolt off; redrill hole
|
Details
|
  |
|
02-21-2009
|
1.25
|
grind out elev hole; grind/trim bellcrank platfrom
|
Details
|
|
|
02-16-2009
|
1.25
|
figure and grind hole for elevator push rod to VS
|
Details
|
|
|
02-01-2009
|
2.00
|
drill for elev. weldment inspection panel
|
|
|
|
02-01-2009
|
2.25
|
1 ah shit (see pic), install all 14 nutplates
|
Details
|
 |
|
01-25-2009
|
1.00
|
put fuselage top on; cleco and bolt
|
Details
|
|
|
01-24-2009
|
0.50
|
trim fuel tunnel; rivnut fuel selector
|
Details
|
 |
|
01-24-2009
|
2.50
|
fuel tunnel and floorboards
|
Details
|
|
|
01-24-2009
|
0.50
|
add ad'l micro to floorbaord transition
|
|
  |
|
01-18-2009
|
2.00
|
level fuse, trim supports
|
Details
|
|
|
01-18-2009
|
0.75
|
fabricate 4 BIDS for fuel hose tunnel
|
|
 |
|
01-18-2009
|
1.00
|
3 BID release for fuel tunnel cover
|
Details
|
|
|
01-17-2009
|
0.50
|
install replacement seat slider mechanisms
|
Details
|
|
|
12-28-2008
|
1.00
|
prep floor, release tape for tunnel flange
|
Details
|
 |
|
12-28-2008
|
1.00
|
add vinyl hose to cushion fuel lines through holes
|
|
|
|
12-27-2008
|
0.50
|
research selector issue on line and in Lancair "go
|
|
  |
|
12-27-2008
|
1.25
|
fit/trim fuel line tunne; study selector attachmen
|
Details
|
|
|
12-27-2008
|
1.00
|
add 2 BID to vertical floorboard supports
|
|
|
|
12-27-2008
|
1.25
|
2 BID top of fuel line tunnel
|
Details
|
 |
|
12-26-2008
|
1.00
|
Trim & prep fuel line tunnel and vert. capstrip
|
|
  |
|
12-26-2008
|
0.25
|
cut lay-ups for vertical floor supports
|
Details
|
 |
|
12-26-2008
|
1.50
|
cleco and bond vertical floorboard supports
|
Details
|
 |
|
12-26-2008
|
1.00
|
add 2 BID to inside of fuel line tunnel
|
Details
|
 |
|
12-22-2008
|
1.75
|
trim fuel line tunnel , fabricate
|
Details
|
|
|
12-22-2008
|
1.25
|
trim aft seat & flanges; grind seat belt holes
|
|
|
|
12-22-2008
|
1.00
|
drill holes & add nutplates for seat
|
|
  |
|
12-22-2008
|
0.50
|
cut inside and outside BIDs for top; misc. shop
|
|
  |
|
12-22-2008
|
1.00
|
1 BID to vertical support capstrip
|
|
 |
|
12-21-2008
|
0.10
|
will need a micro release and micro build up
|
Details
|
|
|
12-21-2008
|
1.75
|
fabricate vertical supports for under floorboards
|
Details
|
|
|
12-21-2008
|
2.00
|
design forward floorboards, cut template
|
|
|
|
12-21-2008
|
2.50
|
design & fabricate fuel line tunnel
|
Details
|
|
|
12-21-2008
|
0.75
|
cut pre peg and fit floorboards
|
|
|
|
12-20-2008
|
1.00
|
micro and 2 BID aft seat flange support
|
|
 |
|
12-20-2008
|
0.10
|
make support for flange; drill seat belt bolt hole
|
|
|
|
12-20-2008
|
1.00
|
figure out floorboards, begin template
|
Details
|
  |
|
12-20-2008
|
1.25
|
aft seat flange support
|
Details
|
 |
|
12-20-2008
|
2.00
|
add'l 4 BID on aft seat bottom
|
Details
|
|
|
12-14-2008
|
1.00
|
seat rail template and drill holes in fuse flanges
|
|
 |
|
12-14-2008
|
1.00
|
fit seats, mess with corrosion
|
Details
|
|
|
12-14-2008
|
1.75
|
3 BID to bottom of aft seat bottom
|
|
|
|
12-13-2008
|
2.50
|
trim, prep and bond seat bottom
|
Details
|
|
|
12-13-2008
|
0.50
|
research aft seat flanges....manual is fucked up
|
|
  |
|
12-13-2008
|
1.00
|
epoxy build up strips to spar flange, misc.
|
|
 |
|
12-13-2008
|
1.00
|
cut aft seat bottom and fit
|
|
|
|
12-13-2008
|
2.75
|
aft seat flange - top
|
Details
|
|
|
12-13-2008
|
0.50
|
add 2 BID to errant cut on seat bottom
|
|
 |
|
12-07-2008
|
0.75
|
research gusset removal and seat placement
|
Details
|
  |
|
12-07-2008
|
0.50
|
pull seats parts
|
|
  |
|
12-07-2008
|
0.50
|
prep bulkhead flange to bond strips next week
|
|
  |
|
12-07-2008
|
2.00
|
assemble front seats
|
|
|
|
12-07-2008
|
0.25
|
alternate method for seat release
|
Details
|
|
|
12-07-2008
|
1.25
|
aileron bulkhead mistake
|
Details
|
|
|
12-06-2008
|
2.75
|
micro and 2 BID both close out panels
|
|
|
|
12-06-2008
|
2.50
|
fabricate shear close out and aileron close out
|
|
|
|
11-30-2008
|
1.00
|
work on finishing fuel system lines
|
Details
|
|
|
11-30-2008
|
1.00
|
fuel hoses
|
Details
|
 |
|
11-30-2008
|
0.50
|
drill hole in step sleeve and make flox shoulder
|
|
|
|
11-23-2008
|
1.50
|
step work
|
Details
|
  |
|
11-23-2008
|
2.50
|
micro prepeg panel 1 of 3 in place
|
|
|
|
11-23-2008
|
1.75
|
micro panels 2 and 3; add 2 BIDs
|
|
|
|
11-23-2008
|
2.00
|
measure for step and cut holes
|
Details
|
|
|
11-23-2008
|
2.00
|
flox step sleeve in place
|
|
|
|
11-23-2008
|
1.00
|
fabricate step panels 2 and 3
|
|
 |
|
11-23-2008
|
0.50
|
add 6 click-bond studs to hold fuel lines
|
Details
|
|
|
11-17-2008
|
1.50
|
more fuel system work
|
|
|
|
11-17-2008
|
0.50
|
level fuse; prep for step installation
|
|
  |
|
11-17-2008
|
1.50
|
finish fuel hoses and fittings
|
|
|
|
11-17-2008
|
1.25
|
bulkhead fitting to gascolator
|
Details
|
|
|
11-15-2008
|
4.00
|
micro belly, access panels, repair leg fairing
|
Details
|
|
|
10-20-2008
|
1.00
|
install nutplates for access panels
|
|
 |
|
10-20-2008
|
2.25
|
finish fuel and flap access panels
|
Details
|
 |
|
10-19-2008
|
2.00
|
release tape panels and add 4 BID for flange
|
|
|
|
10-19-2008
|
0.50
|
cut fuel and flap access panels
|
|
|
|
10-19-2008
|
0.50
|
cut fuel and flap access panels
|
|
 |
|
10-19-2008
|
0.50
|
cut fuel and flap access panels
|
|
|
|
09-28-2008
|
0.10
|
pics from 9/28
|
|
|
|
09-15-2008
|
2.25
|
sand and apply 2nd pass of micro on fairings
|
|
|
|
09-14-2008
|
1.75
|
micro bottom of fuselage & wing/leg fairings
|
Details
|
|
|
09-13-2008
|
2.50
|
sand lower wing and leg fairings; prep for 1st bod
|
|
  |
|
08-25-2008
|
1.00
|
shape foam to build out right wing fairing
|
Details
|
|
|
08-25-2008
|
0.75
|
flox foam to right fairing to build up gap
|
|
 |
|
08-24-2008
|
1.25
|
BIDs to right side fairing
|
Details
|
 |
|
08-24-2008
|
3.00
|
add BIDS to wing fairings
|
Details
|
|
|
08-23-2008
|
3.00
|
pull access panels and prep wing fairings
|
Details
|
|
|
08-09-2008
|
0.25
|
fairing interferes with fuel access panel
|
Details
|
|
|
08-03-2008
|
1.00
|
Prepare to flip fuselage over
|
Details
|
|
|
08-03-2008
|
0.10
|
Flipped over
|
|
|
|
07-27-2008
|
1.50
|
run lines and connect Russell fittings
|
|
|
|
07-27-2008
|
1.50
|
route stainless steel supply and return lines
|
|
|
|
07-27-2008
|
1.00
|
new hoses and fittings
|
Details
|
|
|
07-27-2008
|
0.50
|
mount fuel pump bracket
|
|
|
|
07-27-2008
|
1.00
|
micro all new openings
|
|
|
|
07-27-2008
|
0.75
|
grind holes to fuel selector
|
|
 |
|
07-27-2008
|
0.25
|
add fittings to fuel selector
|
Details
|
 |
|
07-27-2008
|
1.00
|
|
Details
|
|
|
07-21-2008
|
1.00
|
pull step parts and study manual
|
|
  |
|
07-21-2008
|
0.25
|
pull off aileron controls in prep for flipping fus
|
|
  |
|
07-21-2008
|
1.50
|
prep & micro both wing fairings in prep for 2 BID
|
|
|
|
07-21-2008
|
0.25
|
add 2 BID to fuel selector pad, right side
|
|
  |
|
07-20-2008
|
0.50
|
install fuel selector to pad
|
|
|
|
07-14-2008
|
0.50
|
micro and add 2 BID to base for fuel selector
|
|
 |
|
07-14-2008
|
2.00
|
messed up fuel selector base...re-did
|
Details
|
|
|
07-14-2008
|
0.25
|
further documenting fuel system mis-specification
|
Details
|
|
|
07-14-2008
|
0.10
|
|
|
|
|
07-13-2008
|
2.50
|
pull fuel system parts and try to figure out manua
|
Details
|
 |
|
07-13-2008
|
1.50
|
prepare mounting plate for fuel selector
|
Details
|
|
|
07-13-2008
|
0.50
|
info on fuel return line and fittings
|
Details
|
|
|
06-29-2008
|
0.50
|
crawl under fuselage..verify BIDs, remove peel-ply
|
|
  |
|
06-21-2008
|
0.25
|
sand micro on left wing fairing
|
Details
|
  |
|
06-13-2008
|
1.75
|
finish brake lines; insulate, tie-strap
|
|
|
|
06-13-2008
|
1.00
|
finish brake lines
|
Details
|
|
|
06-09-2008
|
2.00
|
repair left wing fairing damaged removing wing las
|
Details
|
|
|
06-09-2008
|
2.50
|
fabricated and installed alum. brake lines
|
Details
|
|
|
06-09-2008
|
1.00
|
brakes hoses all run
|
|
|
|
06-08-2008
|
0.50
|
pull rest of brake parts and review manual
|
|
  |
|
06-08-2008
|
0.50
|
braided hoses installed to pilot side pedals
|
Details
|
|
|
06-08-2008
|
0.50
|
|
|
|
|
06-02-2008
|
1.00
|
move rudder pedals forward .7 inch
|
Details
|
|
|
06-02-2008
|
0.50
|
installed flap motor
|
Details
|
|
|
05-19-2008
|
0.50
|
test fit right main gear fairing
|
Details
|
  |
|
05-19-2008
|
0.75
|
figure out and fabricate center shim
|
|
|
|
05-19-2008
|
1.75
|
drill and pot bolts for flap motor; add 2 BID on f
|
|
|
|
05-19-2008
|
1.50
|
build rudder pedals; too much paint on tubes
|
|
|
|
05-19-2008
|
1.00
|
both tubes bolted in place
|
Details
|
 |
|
05-19-2008
|
1.00
|
aft (right) pedal tube clamped in place
|
Details
|
|
|
05-18-2008
|
2.25
|
trim fairings, build flap control rods; drill fwd
|
|
|
|
05-18-2008
|
1.00
|
torque flap tube and support bolts
|
Details
|
 |
|
05-18-2008
|
2.50
|
recut inside BIDS (measured right and cut wrong fo
|
|
  |
|
05-18-2008
|
1.50
|
install delrin flap stops
|
Details
|
|
|
05-18-2008
|
0.10
|
drill forward spar hole to correct size; both side
|
|
 |
|
05-18-2008
|
0.50
|
decore and micro fuse supports that were opened up
|
|
|
|
05-12-2008
|
1.50
|
flap controls
|
Details
|
 |
|
05-12-2008
|
0.50
|
figure out manuals and plan fo attack
|
Details
|
  |
|
05-12-2008
|
0.10
|
drawings instead of patterns of the manual calls f
|
|
|
|
05-12-2008
|
0.10
|
cut all BIDS for both sides at once
|
|
 |
|
05-12-2008
|
2.50
|
add 16 BID to right side of aft seat support
|
|
 |
|
05-12-2008
|
1.50
|
ad micro due to large gap between right seat suppo
|
|
|
|
05-11-2008
|
1.00
|
more hole alignment
|
|
|
|
05-11-2008
|
1.00
|
install supports and guides - 4 of them
|
Details
|
|
|
05-11-2008
|
2.00
|
Flap torque tube
|
|
|
|
05-11-2008
|
2.00
|
enlarge hole to 1 1/2"
|
|
|
|
05-11-2008
|
1.00
|
assemble flap torque tube
|
Details
|
|
|
05-11-2008
|
1.25
|
align holes
|
Details
|
|
|
05-11-2008
|
1.25
|
|
|
|
|
05-10-2008
|
1.50
|
add 2 BID to left wing fairing; plan flap controls
|
Details
|
  |
|
04-28-2008
|
2.00
|
fit and trim top fairing and rib
|
Details
|
  |
|
04-28-2008
|
2.50
|
bond top fairing; flox on fairing/fuselage and mic
|
Details
|
|
|
04-28-2008
|
2.00
|
apply BIDs to fairing rib and web; 10 BIDs in tota
|
Details
|
|
|
04-27-2008
|
2.50
|
micro wing left rib, trim add phenolic and final 2
|
|
|
|
04-27-2008
|
1.75
|
bond left fairing rib/web to bottom fairing and fu
|
|
|
|
04-26-2008
|
0.75
|
measure I/B aileron tube, rivet rod end
|
Details
|
  |
|
04-26-2008
|
1.75
|
Fit and trim fairing rib to left side; add 2 BID t
|
Details
|
  |
|
04-21-2008
|
0.25
|
full garb - working on fairing rib
|
Details
|
 |
|
04-21-2008
|
1.00
|
cleco left fairing in prep for bonding
|
Details
|
 |
|
04-21-2008
|
3.00
|
build and fit and fit and fit templates for web an
|
Details
|
 |
|
04-21-2008
|
1.00
|
bond left bottom wing fairing with flox
|
|
|
|
04-21-2008
|
2.00
|
add webs to rib - micro
|
|
|
|
04-07-2008
|
1.00
|
trim cover
|
Details
|
|
|
04-07-2008
|
0.75
|
install nutplates with rivets - 6 places
|
Details
|
|
|
04-06-2008
|
2.00
|
install elev. tunnel top
|
Details
|
|
|
04-06-2008
|
2.00
|
fabricate top for elevator pushrod tube cover
|
Details
|
  |
|
04-05-2008
|
1.50
|
pot in left elevator torque tube enclosure
|
|
|
|
04-05-2008
|
1.50
|
add 2 BIDs all around and micro'd cored out top
|
|
  |
|
03-30-2008
|
7.00
|
Elevator tube cover
|
Details
|
|
|
03-29-2008
|
0.50
|
trim clearance holes for elevator pushtubes
|
|
  |
|
03-29-2008
|
2.00
|
measure and fabricate elevator torque tube to idle
|
|
|
|
03-29-2008
|
1.00
|
make pattern for elevator tube enclosure
|
|
|
|
03-29-2008
|
2.00
|
complete elevator push tube and inboard aileron pu
|
|
  |
|
03-28-2008
|
0.10
|
only 1 spot to enlarge - Right side
|
Details
|
 |
|
03-28-2008
|
1.00
|
installed elevator push tubes
|
|
|
|
03-28-2008
|
1.00
|
install elevator torque tube
|
Details
|
|
|
03-28-2008
|
2.00
|
fairing access panel and BIDs
|
Details
|
|
|
03-28-2008
|
1.75
|
fabricate elevator push tubes
|
|
|
|
03-28-2008
|
2.00
|
cut bulkhead supports for elevator pushtubes
|
Details
|
|
|
03-23-2008
|
6.00
|
bond wing fairing web and ribs
|
Details
|
|
|
03-23-2008
|
0.50
|
add phenolic for flap control; add 4 BID over top
|
|
|
|
03-22-2008
|
0.75
|
rivet elevator idler
|
|
|
|
03-22-2008
|
1.00
|
research elevator controls and build elev. idler
|
Details
|
|
|
03-22-2008
|
0.50
|
install elevator idler assembly aft of FS 185 in f
|
Details
|
|
|
03-10-2008
|
2.00
|
make templates for fairing ribs and webs - right s
|
|
|
|
03-10-2008
|
2.00
|
fitted parts to fuselage
|
|
|
|
03-10-2008
|
1.50
|
de-core ribs and webs
|
|
|
|
03-10-2008
|
2.00
|
cut pre-peg
|
|
|
|
03-09-2008
|
1.50
|
fabricate interior aileron bellcrank tubes
|
|
 |
|
03-08-2008
|
1.00
|
made another pass at fitting right wing fairing
|
|
|
|
03-08-2008
|
0.10
|
installed control sticks to aileron torque tube
|
Details
|
|
|
02-25-2008
|
1.00
|
Remove incorrect 4080 part-manual wrong
|
Details
|
|
|
02-24-2008
|
2.50
|
re-engineer forward support #4080
|
Details
|
|
|
02-24-2008
|
1.50
|
Grind areas for aileron clearance
|
Details
|
|
|
02-24-2008
|
2.00
|
epoxy/micro forward supports
|
Details
|
|
|
02-24-2008
|
2.00
|
drill access holes for aileron pushrods
|
Details
|
|
|
02-23-2008
|
0.50
|
Lay out holes for aileron tube
|
Details
|
 |
|
02-23-2008
|
6.50
|
install aileron forward supports
|
Details
|
|
|
02-17-2008
|
5.50
|
apply 9 BIDs for aft seat belt
|
|
|
|
02-17-2008
|
1.00
|
apply 5 BID to both aileron front supports
|
|
|
|
02-16-2008
|
1.00
|
floxed in hard points for aft seat belt
|
Details
|
 |
|
02-16-2008
|
0.50
|
|
Details
|
|
|
02-15-2008
|
3.50
|
Sorted aileron control parts; worked on Fwd ailero
|
Details
|
|
|
02-15-2008
|
1.50
|
Cut out core for aft seat points hard points
|
|
|
|
02-15-2008
|
1.00
|
cut all BIDs for aileron support and seat belt har
|
Details
|
 |
|
02-10-2008
|
0.50
|
Laid out hard points for aft seats belts, cut phen
|
Details
|
  |
|
12-21-2007
|
1.00
|
Ready to BID inside of windows - 2 BID
|
|
|
|
12-21-2007
|
6.00
|
add 2 BID around all windows
|
|
 |
|
12-20-2007
|
0.10
|
pix after door bond
|
Details
|
|
|
12-20-2007
|
0.10
|
more after bonding door pics
|
|
|
|
12-20-2007
|
3.00
|
bond in door
|
|
 |
|
12-19-2007
|
3.00
|
Micro around windows add 4" wide 4 BID around wind
|
Details
|
|
|
12-19-2007
|
4.00
|
fit door frame and door
|
Details
|
|
|
12-19-2007
|
0.50
|
door seal pump motor
|
Details
|
|
|
12-18-2007
|
1.00
|
prep windshield for bonding
|
Details
|
|
|
12-18-2007
|
4.00
|
bond in windows and windshield
|
Details
|
|
|
12-17-2007
|
2.00
|
Trim right side of upper fuselage
|
Details
|
|
|
12-17-2007
|
2.00
|
Screwed up window application
|
Details
|
|
|
12-17-2007
|
1.00
|
Sand and prep fuselage for bonding of windows & w/
|
Details
|
|
|
12-17-2007
|
2.00
|
Prep 2nd set of windows for bonding
|
Details
|
 |
|
12-17-2007
|
0.10
|
Fuselage mated after trimming right side to acheiv
|
Details
|
 |
|
12-17-2007
|
0.50
|
|
Details
|
  |
|
12-14-2007
|
1.00
|
Sand window openings; add 45 degree bias
|
|
  |
|
12-13-2007
|
1.00
|
Prep and square window openings
|
Details
|
|
|
12-12-2007
|
0.50
|
moving fuselage over from prep shop to main build
|
|
|