KitLog pro

Powered By Kitlog Pro v2.0

N144GP Lancair Super ES
Work Logs Found: 107
Category Work Time: 155 Hours
 Date
Hours
Work Log Summary

Details

 07-20-2015
3.25
begin stick mixer/controls install
Details
       

 06-30-2015
0.75
rivnuts - floor to underlying AL angle braces

 06-30-2015
0.50
research, locate and grind holes for seatbelts in
       

 06-30-2015
2.25
baggage floor, back and misc
Details
       

 06-15-2015
2.50
plan & layout baggae area supports
Details
       

 06-15-2015
1.50
fuel hoses cont'd
       

 06-08-2015
1.00
move fuel supply bulkheads fitting
       

 06-01-2015
2.00
fuel system work cont'd
Details
       

 06-01-2015
2.00
fuel system cont'd
       

 08-04-2014
0.00
strut info Suspa CI6-24200 15#
       

 08-04-2014
1.00
secure canopy frame to fuse with 3 self tapping sm
       

 08-04-2014
2.00
fit, cut and fine tune access hole in glare shield
       

 08-04-2014
1.00
fab and fit canopy hinge hardware
       

 08-04-2014
2.00
cont'd canopy hinge through glareshield
       

 07-14-2014
3.25
prep for inside paint; clean and prep paint guns
Details
       

 07-07-2014
2.00
clean, prep and wrap interior in prep for Zolatone

 03-03-2014
4.50
fit and trim cowling
Details
       

 03-01-2014
3.00
1 BID to top and bottom cowls
       

 02-09-2014
1.25
prep & micro top side of top cowling
Details
       

 02-09-2014
2.00
2 BID to inside of lower cowl extension
       

 02-03-2014
1.50
prep and 2 BID to inside of top cowl at 4 BID exte
       

 02-03-2014
1.25
flox lower cowl extensions to lower cowl
Details
       

 01-26-2014
1.50
prep lower cowling for 3 BID cowling extension
       

 01-26-2014
1.00
pop top cowling BID; align & cleco
Details
       

 01-26-2014
1.00
pop lower cowl 3 BID layup; fit to lower cowl
Details
       

 01-26-2014
1.75
make up 35" jig & epoxy top cowl extension to top
       

 01-26-2014
1.25
3 BID to lower cowl for cowling extensions
       

 12-08-2013
3.00
sand and prep top inside fuse. superfill #2, sand
Details

 11-25-2013
2.00
super-fill pass #1, #3 overall top i/s fuselage
       

 11-24-2013
1.50
sand and prep for micro pass #2 on top inside of f

 11-17-2013
2.50
sand-prep-micro i/s fuse top
Details
       

 11-17-2013
1.50
console/fuel selector
Details
       

 10-13-2013
1.00
super-fill to new console and last pass to inside
Details
       

 10-13-2013
1.00
fuel console install 4/4
       

 10-13-2013
1.00
fuel console 3/4
Details
       

 10-13-2013
1.00
fuel console 2/4
       

 10-13-2013
1.00
fuel console 1/4
       

 10-07-2013
1.00
sand interior of fuselage - cont'd
Details
       

 10-07-2013
1.25
interior sanding cont'd
       

 10-07-2013
1.00
fuel console attach tabs
       

 10-07-2013
1.75
fab center console - 3 BID
Details
       

 09-23-2013
1.00
sanding con'td; prep rudder

 09-23-2013
1.00
sand inside fuleage
       

 09-23-2013
3.75
prep and superifll fuse., HS, rudder
Details
       

 09-09-2013
3.25
prep and micro inside of fuselage
Details
       

 09-09-2013
0.25
clean up flox release at seat pans
       

 09-02-2013
1.50
flox release seat pans; 2 BID to top seat back
       

 09-01-2013
0.25
open up delrin rudder cable guides; lay in cables
Details
       

 08-12-2013
1.00
sand belly seam - last pass
       

 08-12-2013
1.25
prep top seam and S/F #3

 08-12-2013
0.50
flip fuselage back right side up
Details
       

 08-05-2013
0.00
secure rudder support tube to bushing
Details
     

 08-05-2013
4.50
rudder pedals, pulleys, cables
Details
       

 08-05-2013
0.00
add'l rudder control pics
       

 07-29-2013
0.75
rudder guide wheel brackets
Details

 07-29-2013
1.25
fit up rudder pedals; tighten all bolts. No pics-
Details

 07-28-2013
0.75
prep and S/F #2 to bottom fuselage seam

 07-28-2013
1.25
fit rudder pedals; flute tube truss
Details
       

 07-28-2013
2.00
fabricate flute tube truss supports
Details
       

 07-22-2013
0.50
tested flap motor
Details

 07-22-2013
1.00
super-fill pass #1 to belly - mostly the fuse seam
Details
       

 07-22-2013
0.00
rudder pedal bushings floxed in
     

 07-22-2013
2.25
fitted up rudder pedal rod and bushings
Details
       

 07-14-2013
2.25
rudder pdeal flute tubes and rough up supports
       

 07-14-2013
1.50
Grind rudder cable holes in seat back & flip fuse
       

 07-14-2013
2.25
fabricate rudder pedal brackets
Details
       

 07-08-2013
3.75
rivnuts & trim to seat pans & rails
Details
       

 07-08-2013
3.00
build rudder/brake controls
Details
       

 07-07-2013
4.00
fab and flox in seats rails & center console
Details
       

 07-01-2013
0.75
install Thomson flap motor
Details
       

 07-01-2013
1.75
center console fit & trim
Details
       

 06-23-2013
2.25
tap AOI holes; lay up 3 bid for wing fairing
Details
       

 06-15-2013
3.50
cut wing flap access; cut & prep BIDS for wing fai
Details
       

 05-13-2013
0.75
seat panels & grind out leg holes
       

 05-13-2013
1.00
install shoulder harness and lap belts-buckle side

 05-13-2013
0.00
flap torsional supports cont'd
       

 05-13-2013
2.50
flap torque tube and torsional supports
       

 04-21-2013
0.75
sand and superf-fill #1 top fusealge joint
Details
       

 03-26-2013
2.00
fit & trim panel blank
       

 03-26-2013
1.25

Details
       

 03-18-2013
1.00
drill and c/s panel attach holes
Details
       

 03-17-2013
1.00
place and drill for rivnust in panel brackets
Details
       

 03-17-2013
0.75
fit and grind panel vent parts to fit panel/bracke
Details
       

 03-11-2013
1.00
redrill vent 2.5" holes in panel
       

 03-11-2013
0.75
2 BID to alum. panel support brackets
     

 03-10-2013
0.25
flox in canopy strut brackets
       

 03-10-2013
1.25
fab, prep and flox in panel attach brackets
Details
       

 03-04-2013
0.50
vent hole not in right position
Details
       

 03-04-2013
0.50
flox in vent hole cut-out for do over
Details
       

 03-04-2013
1.50
fit and mount canopy mount bracket
Details
       

 03-04-2013
1.75
canopy strut brackets part 1 and part 2
Details
       

 03-03-2013
1.75
start fabbing gas strut/mounting brackets
Details
       

 03-03-2013
0.00
panel fit to fuselage
       

 03-03-2013
0.10
level point on pilot's side
     

 03-03-2013
1.00
fit and cleco panel to fuselage
Details
       

 03-03-2013
0.50
2 BID on top of ground plane copper plate
     

 02-17-2013
0.75
flox in 6x6 copper plate for ground plane
     

 01-28-2013
2.50
install VHF COM ground plane
       

 01-27-2013
1.75
trial fit spar box - count spacer washers, note
Details
       

 01-27-2013
0.00
rudder cable guides
       

 01-27-2013
1.00
com1 ground plane & rudder cable guides
       

 12-17-2012
0.75
repair aft fuselage damaged in delivery/unloading
Details
       

 12-16-2012
1.00
prep and micro voids in top fuselage seam
       

 12-16-2012
0.50
Elev bellcrank slot
Details
       

 12-16-2012
1.00
cut opening in naca scoops; scuff firewall
       

 12-15-2012
1.25
spar/wing cut-outs
       

 12-15-2012
2.25
cut out windows, prep flange
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.