Date
|
Hours
|
Work Log Summary
|
Details
|
07-20-2015
|
3.25
|
begin stick mixer/controls install
|
Details
|
|
|
06-30-2015
|
0.75
|
rivnuts - floor to underlying AL angle braces
|
|
|
|
06-30-2015
|
0.50
|
research, locate and grind holes for seatbelts in
|
|
|
|
06-30-2015
|
2.25
|
baggage floor, back and misc
|
Details
|
|
|
06-15-2015
|
2.50
|
plan & layout baggae area supports
|
Details
|
|
|
06-15-2015
|
1.50
|
fuel hoses cont'd
|
|
|
|
06-08-2015
|
1.00
|
move fuel supply bulkheads fitting
|
|
|
|
06-01-2015
|
2.00
|
fuel system work cont'd
|
Details
|
|
|
06-01-2015
|
2.00
|
fuel system cont'd
|
|
|
|
08-04-2014
|
0.00
|
strut info Suspa CI6-24200 15#
|
|
|
|
08-04-2014
|
1.00
|
secure canopy frame to fuse with 3 self tapping sm
|
|
|
|
08-04-2014
|
2.00
|
fit, cut and fine tune access hole in glare shield
|
|
|
|
08-04-2014
|
1.00
|
fab and fit canopy hinge hardware
|
|
|
|
08-04-2014
|
2.00
|
cont'd canopy hinge through glareshield
|
|
|
|
07-14-2014
|
3.25
|
prep for inside paint; clean and prep paint guns
|
Details
|
|
|
07-07-2014
|
2.00
|
clean, prep and wrap interior in prep for Zolatone
|
|
|
|
03-03-2014
|
4.50
|
fit and trim cowling
|
Details
|
|
|
03-01-2014
|
3.00
|
1 BID to top and bottom cowls
|
|
|
|
02-09-2014
|
1.25
|
prep & micro top side of top cowling
|
Details
|
|
|
02-09-2014
|
2.00
|
2 BID to inside of lower cowl extension
|
|
|
|
02-03-2014
|
1.50
|
prep and 2 BID to inside of top cowl at 4 BID exte
|
|
|
|
02-03-2014
|
1.25
|
flox lower cowl extensions to lower cowl
|
Details
|
|
|
01-26-2014
|
1.50
|
prep lower cowling for 3 BID cowling extension
|
|
|
|
01-26-2014
|
1.00
|
pop top cowling BID; align & cleco
|
Details
|
|
|
01-26-2014
|
1.00
|
pop lower cowl 3 BID layup; fit to lower cowl
|
Details
|
|
|
01-26-2014
|
1.75
|
make up 35" jig & epoxy top cowl extension to top
|
|
|
|
01-26-2014
|
1.25
|
3 BID to lower cowl for cowling extensions
|
|
|
|
12-08-2013
|
3.00
|
sand and prep top inside fuse. superfill #2, sand
|
Details
|
|
|
11-25-2013
|
2.00
|
super-fill pass #1, #3 overall top i/s fuselage
|
|
|
|
11-24-2013
|
1.50
|
sand and prep for micro pass #2 on top inside of f
|
|
|
|
11-17-2013
|
2.50
|
sand-prep-micro i/s fuse top
|
Details
|
|
|
11-17-2013
|
1.50
|
console/fuel selector
|
Details
|
|
|
10-13-2013
|
1.00
|
super-fill to new console and last pass to inside
|
Details
|
|
|
10-13-2013
|
1.00
|
fuel console install 4/4
|
|
|
|
10-13-2013
|
1.00
|
fuel console 3/4
|
Details
|
|
|
10-13-2013
|
1.00
|
fuel console 2/4
|
|
|
|
10-13-2013
|
1.00
|
fuel console 1/4
|
|
|
|
10-07-2013
|
1.00
|
sand interior of fuselage - cont'd
|
Details
|
|
|
10-07-2013
|
1.25
|
interior sanding cont'd
|
|
|
|
10-07-2013
|
1.00
|
fuel console attach tabs
|
|
|
|
10-07-2013
|
1.75
|
fab center console - 3 BID
|
Details
|
|
|
09-23-2013
|
1.00
|
sanding con'td; prep rudder
|
|
|
|
09-23-2013
|
1.00
|
sand inside fuleage
|
|
|
|
09-23-2013
|
3.75
|
prep and superifll fuse., HS, rudder
|
Details
|
|
|
09-09-2013
|
3.25
|
prep and micro inside of fuselage
|
Details
|
|
|
09-09-2013
|
0.25
|
clean up flox release at seat pans
|
|
|
|
09-02-2013
|
1.50
|
flox release seat pans; 2 BID to top seat back
|
|
|
|
09-01-2013
|
0.25
|
open up delrin rudder cable guides; lay in cables
|
Details
|
|
|
08-12-2013
|
1.00
|
sand belly seam - last pass
|
|
|
|
08-12-2013
|
1.25
|
prep top seam and S/F #3
|
|
|
|
08-12-2013
|
0.50
|
flip fuselage back right side up
|
Details
|
|
|
08-05-2013
|
0.00
|
secure rudder support tube to bushing
|
Details
|
|
|
08-05-2013
|
4.50
|
rudder pedals, pulleys, cables
|
Details
|
|
|
08-05-2013
|
0.00
|
add'l rudder control pics
|
|
|
|
07-29-2013
|
0.75
|
rudder guide wheel brackets
|
Details
|
|
|
07-29-2013
|
1.25
|
fit up rudder pedals; tighten all bolts. No pics-
|
Details
|
|
|
07-28-2013
|
0.75
|
prep and S/F #2 to bottom fuselage seam
|
|
|
|
07-28-2013
|
1.25
|
fit rudder pedals; flute tube truss
|
Details
|
|
|
07-28-2013
|
2.00
|
fabricate flute tube truss supports
|
Details
|
|
|
07-22-2013
|
0.50
|
tested flap motor
|
Details
|
|
|
07-22-2013
|
1.00
|
super-fill pass #1 to belly - mostly the fuse seam
|
Details
|
|
|
07-22-2013
|
0.00
|
rudder pedal bushings floxed in
|
|
|
|
07-22-2013
|
2.25
|
fitted up rudder pedal rod and bushings
|
Details
|
|
|
07-14-2013
|
2.25
|
rudder pdeal flute tubes and rough up supports
|
|
|
|
07-14-2013
|
1.50
|
Grind rudder cable holes in seat back & flip fuse
|
|
|
|
07-14-2013
|
2.25
|
fabricate rudder pedal brackets
|
Details
|
|
|
07-08-2013
|
3.75
|
rivnuts & trim to seat pans & rails
|
Details
|
|
|
07-08-2013
|
3.00
|
build rudder/brake controls
|
Details
|
|
|
07-07-2013
|
4.00
|
fab and flox in seats rails & center console
|
Details
|
|
|
07-01-2013
|
0.75
|
install Thomson flap motor
|
Details
|
|
|
07-01-2013
|
1.75
|
center console fit & trim
|
Details
|
|
|
06-23-2013
|
2.25
|
tap AOI holes; lay up 3 bid for wing fairing
|
Details
|
|
|
06-15-2013
|
3.50
|
cut wing flap access; cut & prep BIDS for wing fai
|
Details
|
|
|
05-13-2013
|
0.75
|
seat panels & grind out leg holes
|
|
|
|
05-13-2013
|
1.00
|
install shoulder harness and lap belts-buckle side
|
|
|
|
05-13-2013
|
0.00
|
flap torsional supports cont'd
|
|
|
|
05-13-2013
|
2.50
|
flap torque tube and torsional supports
|
|
|
|
04-21-2013
|
0.75
|
sand and superf-fill #1 top fusealge joint
|
Details
|
|
|
03-26-2013
|
2.00
|
fit & trim panel blank
|
|
|
|
03-26-2013
|
1.25
|
|
Details
|
|
|
03-18-2013
|
1.00
|
drill and c/s panel attach holes
|
Details
|
|
|
03-17-2013
|
1.00
|
place and drill for rivnust in panel brackets
|
Details
|
|
|
03-17-2013
|
0.75
|
fit and grind panel vent parts to fit panel/bracke
|
Details
|
|
|
03-11-2013
|
1.00
|
redrill vent 2.5" holes in panel
|
|
|
|
03-11-2013
|
0.75
|
2 BID to alum. panel support brackets
|
|
|
|
03-10-2013
|
0.25
|
flox in canopy strut brackets
|
|
|
|
03-10-2013
|
1.25
|
fab, prep and flox in panel attach brackets
|
Details
|
|
|
03-04-2013
|
0.50
|
vent hole not in right position
|
Details
|
|
|
03-04-2013
|
0.50
|
flox in vent hole cut-out for do over
|
Details
|
|
|
03-04-2013
|
1.50
|
fit and mount canopy mount bracket
|
Details
|
|
|
03-04-2013
|
1.75
|
canopy strut brackets part 1 and part 2
|
Details
|
|
|
03-03-2013
|
1.75
|
start fabbing gas strut/mounting brackets
|
Details
|
|
|
03-03-2013
|
0.00
|
panel fit to fuselage
|
|
|
|
03-03-2013
|
0.10
|
level point on pilot's side
|
|
|
|
03-03-2013
|
1.00
|
fit and cleco panel to fuselage
|
Details
|
|
|
03-03-2013
|
0.50
|
2 BID on top of ground plane copper plate
|
|
|
|
02-17-2013
|
0.75
|
flox in 6x6 copper plate for ground plane
|
|
|
|
01-28-2013
|
2.50
|
install VHF COM ground plane
|
|
|
|
01-27-2013
|
1.75
|
trial fit spar box - count spacer washers, note
|
Details
|
|
|
01-27-2013
|
0.00
|
rudder cable guides
|
|
|
|
01-27-2013
|
1.00
|
com1 ground plane & rudder cable guides
|
|
|
|
12-17-2012
|
0.75
|
repair aft fuselage damaged in delivery/unloading
|
Details
|
|
|
12-16-2012
|
1.00
|
prep and micro voids in top fuselage seam
|
|
|
|
12-16-2012
|
0.50
|
Elev bellcrank slot
|
Details
|
|
|
12-16-2012
|
1.00
|
cut opening in naca scoops; scuff firewall
|
|
|
|
12-15-2012
|
1.25
|
spar/wing cut-outs
|
|
|
|
12-15-2012
|
2.25
|
cut out windows, prep flange
|
Details
|
|