Date
|
Hours
|
Work Log Summary

|
Details

|
07-30-2017
|
0.50
|
clean up hangar a bit and blow out.
|
|
  |
|
10-20-2012
|
5.25
|
cowl, aileron hinges, B battery
|
Details
|
  |
|
08-20-2012
|
3.00
|
mount bolts. trim door flange, skybolt 4 nose gear
|
Details
|
|
|
08-06-2012
|
6.00
|
work on plane while engine is rebuilt
|
Details
|
|
|
07-09-2012
|
2.50
|
Misc. squawks
|
Details
|
|
|
06-18-2012
|
1.75
|
replace static line; work on MG wheel pants covers
|
Details
|
|
|
06-17-2012
|
2.25
|
misc. - try new cover - recowl
|
Details
|
|
|
05-21-2012
|
1.25
|
cowlings back on and misc.
|
|
  |
|
05-20-2012
|
1.50
|
misc.
|
Details
|
  |
|
04-14-2012
|
4.75
|
get ready for test flight tomorrow
|
Details
|
|
|
04-01-2012
|
2.50
|
update checklist; begin editing AFS checklist file
|
|
  |
|
03-26-2012
|
1.00
|
misc. shop and sort cup full of misc hardware back
|
|
  |
|
03-25-2012
|
1.00
|
test parking brake; engine run
|
Details
|
  |
|
03-24-2012
|
3.00
|
.DAR visit & inspection
|
Details
|
|
|
03-19-2012
|
1.00
|
wipe down entire plane and clean up - prep for DAR
|
|
  |
|
03-12-2012
|
3.75
|
Weight and Balance day
|
Details
|
|
|
03-12-2012
|
0.00
|
add'l w&b pics
|
|
|
|
03-11-2012
|
3.25
|
drain fuel, paint/install glareshield
|
Details
|
  |
|
02-25-2012
|
0.00
|
3 view pics for DAR inspection
|
|
|
|
02-24-2012
|
1.50
|
prep and mail paperwork to Ron Jones, DAR
|
Details
|
  |
|
02-21-2012
|
1.50
|
document AD compliance for 8130-6 form
|
Details
|
|
|
02-13-2012
|
0.75
|
review staged parts; clean up; clean tape off of s
|
|
  |
|
02-11-2012
|
0.50
|
|
|
  |
|
01-30-2012
|
0.75
|
talk to John Reider & reinstall wing tip lights
|
|
  |
|
01-29-2012
|
0.75
|
run engine and misc clean up
|
Details
|
  |
|
01-21-2012
|
1.00
|
pull tip lighst for painting; record prop info
|
Details
|
|
|
12-17-2011
|
1.50
|
run engine; inadvertant taxi!!!
|
Details
|
  |
|
10-31-2011
|
1.50
|
trim engine hoses; plan L armrest
|
Details
|
  |
|
09-21-2011
|
0.75
|
misc shop and try to clean foam mess: no joy
|
|
  |
|
08-27-2011
|
0.50
|
assembled and test AeroKart tug
|
Details
|
 |
|
08-15-2011
|
0.50
|
change descicant plugs; sweep hangar
|
|
  |
|
07-23-2011
|
3.75
|
work at airport a bit...hot!
|
Details
|
  |
|
07-04-2011
|
1.00
|
B batt leads; vacuum fusleage; count screws
|
Details
|
  |
|
07-03-2011
|
0.50
|
misc shop
|
Details
|
  |
|
06-04-2011
|
2.50
|
Ron & Debbie Perry visit and tour
|
|
  |
|
05-22-2011
|
0.50
|
|
|
  |
|
05-14-2011
|
1.00
|
misc and make up ELT GPS power lead
|
|
 |
|
02-05-2011
|
0.50
|
misc shop
|
|
  |
|
02-04-2011
|
0.50
|
misc shop stuff
|
|
  |
|
01-30-2011
|
1.00
|
micro top of vert hat rack; soften epoxy and reloa
|
Details
|
  |
|
01-29-2011
|
0.25
|
get pics & measurements on inertia reel for 2 buil
|
Details
|
  |
|
01-23-2011
|
0.75
|
misc shop and prep rudder bellcrank
|
|
  |
|
11-30-2010
|
0.50
|
misc. shop...had to clean up some!
|
|
  |
|
11-21-2010
|
1.25
|
clean epoxy pump; put new 11/10 epoxy in
|
Details
|
  |
|
09-12-2010
|
1.00
|
misc shop; cut BIDS for VS-HS; clean up
|
|
  |
|
09-04-2010
|
2.50
|
lower fuse and level; give tour to Sonex guy...Ran
|
|
  |
|
08-29-2010
|
1.00
|
measure aft seats and install ground strap
|
Details
|
 |
|
08-16-2010
|
4.50
|
prep/remove engine; rotate fuselage
|
Details
|
|
|
08-15-2010
|
0.75
|
figure nose wheel air; fire sleeve fuel flow cube
|
|
 |
|
04-26-2010
|
1.50
|
cowl parts upstairs; fuse dolly, clean up
|
|
 |
|
04-24-2010
|
1.00
|
misc shop and drill 1/8" vent hole in nose pant
|
|
  |
|
04-12-2010
|
0.25
|
change desicant plugs in al cylinders
|
|
  |
|
01-31-2010
|
1.00
|
misc shop clean up and reorg.
|
|
  |
|
01-31-2010
|
0.50
|
misc shop
|
|
  |
|
01-24-2010
|
1.25
|
flip fuse; misc shop
|
|
  |
|
01-18-2010
|
0.50
|
put stuff away, clean up a bit, etc.
|
|
  |
|
01-16-2010
|
0.75
|
clean out epoxy pump; resin side had some crystali
|
|
  |
|
12-20-2009
|
0.50
|
re-plumb compressoer fittings to get out of way
|
|
|
|
12-07-2009
|
7.00
|
HF compressor died; to Lowes for new
|
Details
|
|
|
12-07-2009
|
1.50
|
get fittings, install, adjust new compressor
|
|
  |
|
11-01-2009
|
0.75
|
DC4 filter, descicant plugs, misc
|
|
  |
|
09-07-2009
|
1.25
|
re-arrange shop, move fuse, lay left wing flat
|
Details
|
|
|
08-09-2009
|
8.00
|
transport engine & prop to Perry County Airplane F
|
Details
|
|
|
08-09-2009
|
0.10
|
snap shots of mags and alt. for Aerotronics
|
|
|
|
08-09-2009
|
0.10
|
set engine on dolley for now..may rig engine stand
|
|
 |
|
08-02-2009
|
0.50
|
lool through box that shipped with engine
|
Details
|
  |
|
07-19-2009
|
1.25
|
hang primed parts upstairs in the loft (aka Chris'
|
Details
|
|
|
07-19-2009
|
1.00
|
flipped tileboard at layup table around; gen'l cle
|
|
|
|
07-06-2009
|
0.50
|
misc shop & clean up
|
|
  |
|
06-28-2009
|
1.75
|
Assemble shop crane; misc shop
|
Details
|
|
|
05-31-2009
|
0.50
|
rebuild wing stands
|
Details
|
|
|
05-31-2009
|
1.00
|
misc. shop, cleanup, reorg., etc
|
|
  |
|
05-30-2009
|
1.00
|
take off fuselage top on rotisserie
|
Details
|
|
|
05-30-2009
|
1.00
|
rebuild wing stands so both wings face the same wa
|
|
  |
|
05-10-2009
|
7.00
|
drove to VA - Bill Harrelson to pick up rotisserie
|
Details
|
|
|
05-04-2009
|
1.50
|
misc. including figuring firewall connectors
|
Details
|
|
|
05-03-2009
|
0.50
|
research various issues
|
|
  |
|
04-11-2009
|
0.10
|
my faithful helper, Maggie... on the job!
|
|
|
|
03-29-2009
|
0.50
|
shop clean up
|
|
  |
|
03-08-2009
|
0.50
|
reserach and order crimper and stripper
|
Details
|
  |
|
01-31-2009
|
0.50
|
misc shop and pull parts
|
|
  |
|
12-28-2008
|
3.50
|
turn fuse; stow left wing; clean shop; fill pump
|
Details
|
|
|
12-27-2008
|
2.50
|
trim fuse supports; lower wing
|
Details
|
  |
|
12-07-2008
|
0.50
|
general, long overdue, shop cleanup
|
|
  |
|
09-07-2008
|
0.50
|
organize new bolt and nut, etc trays, label
|
|
  |
|
08-24-2008
|
0.50
|
clean shop and think through foam for fairing
|
|
  |
|
08-09-2008
|
0.75
|
turn threads on perma-grit countersink
|
Details
|
|
|
07-19-2008
|
0.10
|
took time out to knock off a ground hog
|
|
|
|
07-14-2008
|
1.50
|
finished up securing wall cut-out to accomodate bo
|
Details
|
  |
|
06-29-2008
|
5.00
|
rearrange shop; cut hole in garage wall
|
Details
|
|
|
06-29-2008
|
0.10
|
opening framed up
|
|
|
|
06-22-2008
|
2.00
|
KCXY pilot gang came up for a tour
|
Details
|
  |
|
06-21-2008
|
0.10
|
had a visitor today...3 foot black snake
|
Details
|
|
|
06-13-2008
|
0.50
|
misc shop; received BO'd nose gear strut...looks g
|
Details
|
  |
|
06-09-2008
|
0.50
|
clean up shop and put lots of tools away
|
|
  |
|
06-08-2008
|
0.50
|
|
|
  |
|
06-08-2008
|
0.50
|
|
|
  |
|
06-02-2008
|
1.00
|
remove left wing and position fuselage higher to m
|
Details
|
  |
|
06-02-2008
|
0.10
|
my faithful helper, Maggie
|
|
|
|
05-18-2008
|
0.50
|
finish up AC, rehang lights. etc.
|
|
  |
|
05-17-2008
|
8.00
|
install A/C
|
Details
|
|
|
05-12-2008
|
0.75
|
general clean-up; fill epoxy pump; clean table; pu
|
|
  |
|
04-28-2008
|
1.75
|
reposition wing and fuselage; cut glas for remaini
|
|
 |
|
04-27-2008
|
1.00
|
pull flap parts while waiting for micro to set up
|
|
  |
|
04-26-2008
|
1.00
|
finish running HVAC ducts downstairs
|
Details
|
  |
|
04-07-2008
|
0.25
|
Not in the manual, but..........
|
Details
|
|
|
04-06-2008
|
0.50
|
misc. shop stuff
|
|
  |
|
04-05-2008
|
2.00
|
Installed new air compressor
|
Details
|
|
|
03-30-2008
|
1.50
|
clean up and misc.
|
Details
|
  |
|
03-29-2008
|
2.00
|
moved parts around...right to left
|
Details
|
|
|
03-29-2008
|
0.10
|
Another shot of left wing now mated to fuselage
|
|
 |
|
03-09-2008
|
1.00
|
Lynn and I removed right wing to access push tubes
|
|
 |
|
02-16-2008
|
1.50
|
set up epoxy pump; level fuse
|
Details
|
|
|
02-10-2008
|
4.00
|
Organized and stored parts
|
Details
|
|
|
02-09-2008
|
5.00
|
Moved kit from Capital City to Porter's Ridge
|
Details
|
|
|
02-05-2008
|
1.00
|
Unload trailer from Partain - finally
|
Details
|
|
|
02-05-2008
|
0.50
|
Most of the kit in the hangar...wings set on horse
|
|
|
|
01-25-2008
|
0.10
|
Kit finally picked up
|
Details
|
  |
|
01-06-2008
|
0.10
|
this will be my building home
|
Details
|
|
|
01-06-2008
|
3.00
|
finish up getting workshop ready
|
Details
|
|
|
01-05-2008
|
3.00
|
Build Fuse cradles and misc. workshop - while wait
|
Details
|
|
|
12-30-2007
|
8.00
|
Finsh set up of shop
|
Details
|
  |
|
12-23-2007
|
3.00
|
continue set up of shop; build engine stand to tur
|
Details
|
  |
|
12-21-2007
|
0.10
|
Bob Carter's favorite place - Timber Inn, Route 97
|
Details
|
 |
|
12-20-2007
|
0.10
|
scope out dimensions for fusleage cradle that will
|
Details
|
|
|
12-16-2007
|
0.10
|
Old Columbia plant in Bend OR, now ownes by Cessna
|
Details
|
|
|
12-14-2007
|
80.00
|
Working assitant during builder assist at Lancair
|
|
  |
|
12-11-2007
|
1.00
|
Inventory parts with Tory
|
Details
|
  |