Date
|
Hours
|
Work Log Summary

|
Details

|
08-15-2011
|
0.75
|
start elev trim tab/servo install
|
Details
|
  |
|
08-01-2011
|
0.00
|
shot a coat of rattle can primer for now
|
|
|
|
08-01-2011
|
0.50
|
finish repairs to HS, VS and rudder LE
|
|
|
|
07-31-2011
|
1.00
|
repair HS, VS and rudder
|
Details
|
|
|
07-30-2011
|
1.00
|
repair moving damage; rufferr LE too
|
Details
|
|
|
07-28-2011
|
1.50
|
elevator bolts - install and tighten; apply torque
|
Details
|
|
|
07-25-2011
|
1.00
|
hang elevators. Need to tighten up some bolts
|
Details
|
  |
|
01-17-2011
|
0.00
|
trial fit elevator tubes continued
|
|
|
|
01-17-2011
|
1.75
|
elev. on, install tubes; test rigging
|
|
|
|
12-19-2010
|
1.25
|
more drilling right elev.; balance
|
|
|
|
12-19-2010
|
0.50
|
left side holes and weight required
|
|
|
|
12-19-2010
|
1.00
|
flox holes
|
Details
|
|
|
12-19-2010
|
1.25
|
add'l pics of right elevator
|
Details
|
|
|
12-13-2010
|
3.00
|
drill out excess elevator weight
|
Details
|
|
|
09-19-2010
|
3.25
|
add 2 BID to bottom HS to fuselage joint
|
Details
|
|
|
08-29-2010
|
0.50
|
right side squeeze out
|
Details
|
|
|
08-29-2010
|
2.50
|
Horiz Stab bonded in!!!!
|
Details
|
|
|
08-29-2010
|
2.50
|
final fit, check and adjustment before bonding
|
|
|
|
08-29-2010
|
0.00
|
add'l pics for reference
|
|
|
|
08-16-2010
|
1.75
|
dry run; mount HS and level with laser
|
Details
|
|
|
08-10-2009
|
0.10
|
rechecked HS to cradle; e-mailed pics to Lancair
|
Details
|
|
|
08-10-2009
|
0.50
|
recheck fit of HS to cradle per ? to Justin last w
|
|
  |
|
08-10-2009
|
0.10
|
add'l HS to cradle pics for Lancair
|
Details
|
|
|
07-12-2009
|
5.00
|
sand, prep, add super-fil
|
Details
|
|
|
07-12-2009
|
2.25
|
Sand & prep top of HS; add Super-fil to top
|
|
 |
|
07-06-2009
|
2.00
|
sand HS top; micro 1st pass HS top
|
Details
|
|
|
07-06-2009
|
1.75
|
prep elev and rudder with 150 grit; add Super-Fil
|
|
 |
|
06-28-2009
|
3.50
|
sand elevators; add Super-Fil to top face
|
Details
|
|
|
06-28-2009
|
0.25
|
reserach Service Bulletin for rounding of HS edges
|
Details
|
  |
|
06-08-2009
|
1.25
|
sand top right elevator 1st pass; torque right sid
|
Details
|
  |
|
06-08-2009
|
2.25
|
sand top left elevator; fix stripped AN4-6A bolt
|
Details
|
|
|
06-01-2009
|
4.75
|
sand micro'd elevators; micro other side
|
|
|
|
05-31-2009
|
2.75
|
sand, prep and micro elevators
|
Details
|
|
|
05-31-2009
|
1.50
|
sand elevators and prep for 1st micro
|
Details
|
|
|
05-30-2009
|
1.50
|
prep and add Loehle Wonder-fil to bottom of HS
|
Details
|
 |
|
05-30-2009
|
1.50
|
grind out BID at elev. stop phenolic for clearance
|
|
 |
|
05-30-2009
|
1.50
|
fit elevators to HS; sand micro'd ends to get prop
|
|
|
|
05-30-2009
|
1.25
|
final fit of elevator to HS; shop clean up
|
|
|
|
05-11-2009
|
0.50
|
micro left end of HS....cabin method
|
|
 |
|
05-10-2009
|
0.50
|
micro right end of HS
|
|
|
|
05-03-2009
|
1.00
|
prep and micro short half of elevator pockets
|
Details
|
|
|
04-12-2009
|
1.00
|
trim rudder trim fairing to shape; sand botton of
|
|
  |
|
04-05-2009
|
1.50
|
Sand bottom of Horiz. Stab - continued
|
Details
|
  |
|
04-05-2009
|
1.00
|
make add'l fairing #3, add micro to bottom of HS
|
|
  |
|
04-04-2009
|
2.25
|
begin sanding of bottom of Horiz. Stab
|
Details
|
 |
|
03-29-2009
|
2.25
|
micro bottom of Horiz. Stab.
|
Details
|
|
|
03-09-2009
|
2.00
|
sand HS, HSm back on re-check level and incidence
|
Details
|
|
|
03-08-2009
|
1.00
|
re-set incidence for HS
|
Details
|
|
|
03-08-2009
|
0.75
|
HS off; fab 2 - .082 shims; bond to HS cradle with
|
|
 |
|
03-08-2009
|
0.10
|
add'l pics after figuring shim needed
|
|
|
|
02-22-2009
|
0.75
|
fit HS, right and left VS
|
Details
|
|
|
01-30-2009
|
0.75
|
fabricate and epoxy 2 add'l shims on left HS cradl
|
|
  |
|
01-24-2009
|
1.00
|
prep & epoxy shims for stab cradle
|
Details
|
|
|
01-18-2009
|
0.10
|
stab fitting - cont'd
|
|
|
|
01-18-2009
|
2.50
|
fit stabilizer; measure, measure, measure
|
Details
|
|
|
01-18-2009
|
0.10
|
final pics of stab set-up
|
Details
|
|
|
01-18-2009
|
1.00
|
cradle interference with elev. stops
|
Details
|
|
|
12-21-2007
|
1.00
|
prep elevator; enlarge acces to bolts stab/elevato
|
|
|
|
12-21-2007
|
6.00
|
fitting and setting elevator
|
|
|
|
12-21-2007
|
1.00
|
add phenolic block for up and down elevator travel
|
|
|
|
12-21-2007
|
1.00
|
add phelonic block for elevator stops
|
|
|
|
12-20-2007
|
2.00
|
finish up elevator BIDs
|
|
|
|
12-19-2007
|
0.50
|
Door is fitted,ready to prep and add BIDs
|
Details
|
|
|
12-18-2007
|
2.50
|
apply 2 BID to leading edge of Horiz Stab
|
Details
|
|
|
12-18-2007
|
2.00
|
add 2 BID to elevators' leading edges
|
|
|
|
12-17-2007
|
1.00
|
Stabilizer ready for final 2 BID
|
Details
|
 |
|
12-17-2007
|
1.00
|
Resulting fix to elevator
|
Details
|
|
|
12-14-2007
|
2.00
|
prep and close Horizibtal Stabilator
|
|
|
|
12-14-2007
|
4.00
|
Left elevator mistake
|
Details
|
|
|
12-13-2007
|
2.00
|
pressure test fuel tanks in RW
|
Details
|
|
|
12-13-2007
|
2.00
|
Prep stab for closing tomorrow
|
Details
|
 |
|
12-13-2007
|
2.00
|
Prep and close elevators
|
|
|
|
12-13-2007
|
2.00
|
Close elevators
|
|
|
|
12-12-2007
|
8.00
|
prep Horiz Stab and elevators
|
|
|
|
12-10-2007
|
2.00
|
Day #1 - Sanded skin, spars, and caps for Stab
|
Details
|
  |