KitLog pro

Powered By Kitlog Pro v2.0

N144GP Lancair Super ES
Work Logs Found: 70
Category Work Time: 93 Hours
 Date
Hours
Work Log Summary

Details

 06-01-2015
0.50
reclock wing supply fittings; add 2 FtoF 90 degree
       

 08-25-2014
1.00
prep and superfill wing tips

 08-18-2014
2.50
prep & superfill HS, ailerons & flaps
       

 11-25-2013
1.75
fuel return - drill & c/s flange, prep and Hysol i
       

 09-30-2013
1.00
sand wings, stow in cradles for now
       

 09-30-2013
2.00
sand ailerons & flaps; continue sanding IS fuselag
Details
       

 09-30-2013
1.00
prep ailerons and flaps for micro
       

 09-30-2013
1.00
micro ailerons and flaps
       

 09-23-2013
2.00
sand & prep wings and HS for superfill
     

 09-02-2013
0.50
super fill wing joggle and lower wing fairings #2
       

 09-02-2013
0.50
sand bottom of wing surfaces, super-fill fairings
       

 09-01-2013
0.75
SF lower wing and HW fairings
       

 09-01-2013
0.75
sand SF on top of wing fairings; flip over
     

 09-01-2013
1.00
prep lower wing fairings and misc spots
     

 08-26-2013
1.00
prep and S/F to top of both wing fairings
       

 07-22-2013
1.50
test & flox in R fuel probe
Details
       

 07-01-2013
3.50
fuel probes
Details
       

 07-01-2013
1.00
flox in L fuel probe
       

 07-01-2013
6.50
finish flap hinges, stow wings and clean up
       

 06-30-2013
0.00
install flap brackets after jigging
Details
     

 06-30-2013
0.00
flap bracket install
       

 06-30-2013
0.00
flap bracket cont'd
       

 06-30-2013
1.50
aileron brackets and flap travel
Details
       

 06-24-2013
2.25
right aileron brackets
       

 06-24-2013
2.00
rig and fab aileron brackets
       

 06-24-2013
1.25
other misc. wing tasks
       

 06-24-2013
1.25
alieron brackets cont'd
Details
       

 05-13-2013
1.00
grind aft R hardpoint; install both R side AOI pla
Details
       

 05-12-2013
0.75
set wings in spar box cont'd
Details
       

 05-12-2013
1.50
install L side AOI plates to hardpoints
Details
       

 05-12-2013
1.00
grind 2 5/8" pins for spar; grind R root; knock in
Details
       

 05-12-2013
0.50
check/adjust AOI & sweep
Details
       

 05-12-2013
0.00
check sweep of wings; AOI cont'd
Details
       

 05-06-2013
0.00
wing fit continued
       

 05-06-2013
2.25
spar box installation continued
Details
       

 05-06-2013
2.25
spar box install
Details
       

 05-06-2013
1.00
rig fuselage for spar box/wing install
       

 05-06-2013
1.50
hang wings for angle/sweep fitting
Details
       

 05-06-2013
1.00
fab wing incidence jig & misc. shop
       

 04-21-2013
0.75
Super-fill #2 to top light pockets
       

 04-21-2013
0.75
sand light pockets in prep for s/f #2

 04-01-2013
1.50
take clecos out of tips and sand/cleanuo

 03-26-2013
1.25
under side wing light pockets; measure panel openi
Details
       

 03-26-2013
2.00
sand, prep and super-fil light pockets & fuel caps
       

 03-26-2013
2.50
prep and flox close wing tips
Details
       

 03-26-2013
2.00
install nav/strobe light brackets
Details
       

 03-26-2013
0.00
ground wire to nav light bracket
Details
       

 03-18-2013
1.50
fit, drill, c/s, rivnut light lenses
Details
       

 03-11-2013
1.50
trim light lenses to fit; drill, c/s; add rivnuts
Details
       

 03-10-2013
3.00
BID in light pockets
       

 03-04-2013
1.25
wing light conduit
Details
       

 03-03-2013
1.00
mask, prep & superfill fuel cap openings
Details
       

 02-18-2013
2.00
add nutplates to light pockets; both L & R
Details
       

 02-17-2013
2.50
L&R fuel fill cpas
Details
       

 02-17-2013
1.25
cut in L side light pocket; trail & error for fit
       

 02-17-2013
0.75
cut in L & R light pockets for Aeroleds Aerosuns
Details
       

 01-28-2013
0.50
mark fuel cap location - bad marks from factory
Details
       

 01-28-2013
1.00
mark and cut opening for R wing light
       

 01-28-2013
0.00
manual page for fuel cap positioning
     

 01-28-2013
0.75
finish & fit lite pocket
       

 01-27-2013
0.25
finish fuel vents in wing ends
     

 01-21-2013
4.50
c/s and nutplates to wing tips
       

 01-21-2013
1.50
bond fuel vents to wing; install check valve
       

 12-29-2012
1.00
prep install of wing tips
Details
       

 12-29-2012
1.00
hang flaps; install 3 bronze bushings each side
Details
       

 12-29-2012
1.25
hang flaps; figure out which side of hinge to atta
       

 12-29-2012
0.50
add nutplates for wing access covers; c/s covers
       

 12-29-2012
1.50
Add 3 BID to top & bootom of wing tips - for nutpl
       

 12-29-2012
1.50

       

 12-24-2012
1.25
start wing access covers
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.