Date
|
Hours
|
Work Log Summary
|
Details
|
06-01-2015
|
0.50
|
reclock wing supply fittings; add 2 FtoF 90 degree
|
|
|
|
08-25-2014
|
1.00
|
prep and superfill wing tips
|
|
|
|
08-18-2014
|
2.50
|
prep & superfill HS, ailerons & flaps
|
|
|
|
11-25-2013
|
1.75
|
fuel return - drill & c/s flange, prep and Hysol i
|
|
|
|
09-30-2013
|
1.00
|
sand wings, stow in cradles for now
|
|
|
|
09-30-2013
|
2.00
|
sand ailerons & flaps; continue sanding IS fuselag
|
Details
|
|
|
09-30-2013
|
1.00
|
prep ailerons and flaps for micro
|
|
|
|
09-30-2013
|
1.00
|
micro ailerons and flaps
|
|
|
|
09-23-2013
|
2.00
|
sand & prep wings and HS for superfill
|
|
|
|
09-02-2013
|
0.50
|
super fill wing joggle and lower wing fairings #2
|
|
|
|
09-02-2013
|
0.50
|
sand bottom of wing surfaces, super-fill fairings
|
|
|
|
09-01-2013
|
0.75
|
SF lower wing and HW fairings
|
|
|
|
09-01-2013
|
0.75
|
sand SF on top of wing fairings; flip over
|
|
|
|
09-01-2013
|
1.00
|
prep lower wing fairings and misc spots
|
|
|
|
08-26-2013
|
1.00
|
prep and S/F to top of both wing fairings
|
|
|
|
07-22-2013
|
1.50
|
test & flox in R fuel probe
|
Details
|
|
|
07-01-2013
|
3.50
|
fuel probes
|
Details
|
|
|
07-01-2013
|
1.00
|
flox in L fuel probe
|
|
|
|
07-01-2013
|
6.50
|
finish flap hinges, stow wings and clean up
|
|
|
|
06-30-2013
|
0.00
|
install flap brackets after jigging
|
Details
|
|
|
06-30-2013
|
0.00
|
flap bracket install
|
|
|
|
06-30-2013
|
0.00
|
flap bracket cont'd
|
|
|
|
06-30-2013
|
1.50
|
aileron brackets and flap travel
|
Details
|
|
|
06-24-2013
|
2.25
|
right aileron brackets
|
|
|
|
06-24-2013
|
2.00
|
rig and fab aileron brackets
|
|
|
|
06-24-2013
|
1.25
|
other misc. wing tasks
|
|
|
|
06-24-2013
|
1.25
|
alieron brackets cont'd
|
Details
|
|
|
05-13-2013
|
1.00
|
grind aft R hardpoint; install both R side AOI pla
|
Details
|
|
|
05-12-2013
|
0.75
|
set wings in spar box cont'd
|
Details
|
|
|
05-12-2013
|
1.50
|
install L side AOI plates to hardpoints
|
Details
|
|
|
05-12-2013
|
1.00
|
grind 2 5/8" pins for spar; grind R root; knock in
|
Details
|
|
|
05-12-2013
|
0.50
|
check/adjust AOI & sweep
|
Details
|
|
|
05-12-2013
|
0.00
|
check sweep of wings; AOI cont'd
|
Details
|
|
|
05-06-2013
|
0.00
|
wing fit continued
|
|
|
|
05-06-2013
|
2.25
|
spar box installation continued
|
Details
|
|
|
05-06-2013
|
2.25
|
spar box install
|
Details
|
|
|
05-06-2013
|
1.00
|
rig fuselage for spar box/wing install
|
|
|
|
05-06-2013
|
1.50
|
hang wings for angle/sweep fitting
|
Details
|
|
|
05-06-2013
|
1.00
|
fab wing incidence jig & misc. shop
|
|
|
|
04-21-2013
|
0.75
|
Super-fill #2 to top light pockets
|
|
|
|
04-21-2013
|
0.75
|
sand light pockets in prep for s/f #2
|
|
|
|
04-01-2013
|
1.50
|
take clecos out of tips and sand/cleanuo
|
|
|
|
03-26-2013
|
1.25
|
under side wing light pockets; measure panel openi
|
Details
|
|
|
03-26-2013
|
2.00
|
sand, prep and super-fil light pockets & fuel caps
|
|
|
|
03-26-2013
|
2.50
|
prep and flox close wing tips
|
Details
|
|
|
03-26-2013
|
2.00
|
install nav/strobe light brackets
|
Details
|
|
|
03-26-2013
|
0.00
|
ground wire to nav light bracket
|
Details
|
|
|
03-18-2013
|
1.50
|
fit, drill, c/s, rivnut light lenses
|
Details
|
|
|
03-11-2013
|
1.50
|
trim light lenses to fit; drill, c/s; add rivnuts
|
Details
|
|
|
03-10-2013
|
3.00
|
BID in light pockets
|
|
|
|
03-04-2013
|
1.25
|
wing light conduit
|
Details
|
|
|
03-03-2013
|
1.00
|
mask, prep & superfill fuel cap openings
|
Details
|
|
|
02-18-2013
|
2.00
|
add nutplates to light pockets; both L & R
|
Details
|
|
|
02-17-2013
|
2.50
|
L&R fuel fill cpas
|
Details
|
|
|
02-17-2013
|
1.25
|
cut in L side light pocket; trail & error for fit
|
|
|
|
02-17-2013
|
0.75
|
cut in L & R light pockets for Aeroleds Aerosuns
|
Details
|
|
|
01-28-2013
|
0.50
|
mark fuel cap location - bad marks from factory
|
Details
|
|
|
01-28-2013
|
1.00
|
mark and cut opening for R wing light
|
|
|
|
01-28-2013
|
0.00
|
manual page for fuel cap positioning
|
|
|
|
01-28-2013
|
0.75
|
finish & fit lite pocket
|
|
|
|
01-27-2013
|
0.25
|
finish fuel vents in wing ends
|
|
|
|
01-21-2013
|
4.50
|
c/s and nutplates to wing tips
|
|
|
|
01-21-2013
|
1.50
|
bond fuel vents to wing; install check valve
|
|
|
|
12-29-2012
|
1.00
|
prep install of wing tips
|
Details
|
|
|
12-29-2012
|
1.00
|
hang flaps; install 3 bronze bushings each side
|
Details
|
|
|
12-29-2012
|
1.25
|
hang flaps; figure out which side of hinge to atta
|
|
|
|
12-29-2012
|
0.50
|
add nutplates for wing access covers; c/s covers
|
|
|
|
12-29-2012
|
1.50
|
Add 3 BID to top & bootom of wing tips - for nutpl
|
|
|
|
12-29-2012
|
1.50
|
|
|
|
|
12-24-2012
|
1.25
|
start wing access covers
|
Details
|
|