Date
|
Hours
|
Work Log Summary
|
Details
|
09-26-2004
|
12.00
|
More misc punch list
|
Details
|
|
|
09-12-2004
|
12.00
|
Misc Punch list
|
Details
|
|
|
08-22-2004
|
12.00
|
Rivet Top Rear Fuselage skins
|
Details
|
|
|
08-08-2004
|
20.00
|
Finishing the Frame
|
Details
|
|
|
07-25-2004
|
12.00
|
Fitting canopy frame to fus/cabin frm
|
Details
|
|
|
06-27-2004
|
16.00
|
Preparing canopy frame
|
Details
|
|
|
06-13-2004
|
10.00
|
Installing aft canopy latch
|
Details
|
|
|
06-06-2004
|
8.00
|
Installing Side Handle
|
Details
|
|
|
05-23-2004
|
14.00
|
Installing Canopy Release
|
Details
|
|
|
05-09-2004
|
10.00
|
Drillinjg Canopy hinge blocks to ribs
|
Details
|
|
|
04-18-2004
|
18.00
|
Punch List, much misc
|
Details
|
|
|
03-07-2004
|
14.00
|
Disassemble and painting interior
|
Details
|
|
|
02-22-2004
|
12.00
|
Installing Front deck
|
Details
|
|
|
02-14-2004
|
12.00
|
Installing front deck
|
Details
|
|
|
02-11-2004
|
10.00
|
Installing the cabin frame
|
Details
|
|
|
02-02-2004
|
8.00
|
Constructing Cabin Frame
|
Details
|
|
|
01-24-2004
|
6.00
|
Fitting the rudder
|
Details
|
|
|
01-20-2004
|
8.00
|
Fitting Vertical stabilizer
|
Details
|
|
|
01-14-2004
|
6.00
|
Installed elevator push rod
|
Details
|
|
|
01-12-2004
|
6.00
|
Fitting Horizontal stabilizer
|
Details
|
|
|
01-04-2004
|
4.00
|
Drilled Elevator Horns
|
Details
|
|
|
12-03-2003
|
10.00
|
Install rudder/brake pedal assy/lines
|
Details
|
|
|
12-01-2003
|
12.00
|
Install fuel, brake and vent lines
|
Details
|
|
|
11-20-2003
|
6.00
|
Mount Landing gear legs
|
Details
|
|
|
11-14-2003
|
1.00
|
Rivet seat/baggage BH brkts
|
Details
|
|
|
11-11-2003
|
4.00
|
Installed forward floor/flap assy
|
Details
|
|
|
11-09-2003
|
4.00
|
Install and rivet floor skins
|
Details
|
|
|
11-08-2003
|
7.00
|
riveted Rt seatassy, steps assys
|
Details
|
|
|
11-07-2003
|
5.00
|
Deburr, prime parts, rivet left seat
|
Details
|
|
|
11-06-2003
|
7.00
|
rivet 904 BH, install steps
|
Details
|
|
|
10-15-2003
|
22.00
|
catch up, flap assy, tunnel cover assy
|
Details
|
|
|
09-29-2003
|
6.00
|
drilled top skins, drilled bagg. blkhds
|
Details
|
|
|
09-22-2003
|
6.00
|
install steps, top skins, F656 gussets
|
Details
|
|
|
09-18-2003
|
5.00
|
Rivet aft deck, side rails/gussets
|
Details
|
|
|
09-16-2003
|
12.00
|
Riveted forward side skins
|
Details
|
|
|
09-10-2003
|
5.00
|
Dimple side skins, rivet rear fus
|
Details
|
|
|
09-06-2003
|
6.00
|
duburred and dimpled....
|
Details
|
|
|
08-18-2003
|
4.00
|
Finish firewall, cut misc holes in skin
|
Details
|
|
|
08-17-2003
|
5.00
|
disassy, prerivet, start rivet firewall
|
Details
|
|
|
08-16-2003
|
6.00
|
drilled R side, drill floor stiffeners
|
Details
|
|
|
08-15-2003
|
3.00
|
drilled lots of holes
|
Details
|
|
|
08-14-2003
|
5.00
|
mounted rear side bagg. panels/ribs
|
Details
|
|
|
08-13-2003
|
6.00
|
Finished rudder pedal assy
|
Details
|
|
|
08-09-2003
|
4.00
|
Rt Gear web assy, rudder pedels
|
Details
|
|
|
08-08-2003
|
8.00
|
stiffeners,brackets,gussets
|
Details
|
|
|
07-22-2003
|
5.00
|
Installed Firewall assy
|
Details
|
|
|
07-21-2003
|
5.00
|
Drilled longerons
|
Details
|
|
|
07-20-2003
|
4.00
|
Joined center fuselage to rear fus
|
Details
|
|
|
07-19-2003
|
4.00
|
finished longerons, aft deck, F721B's
|
Details
|
|
|
07-15-2003
|
5.00
|
Finish rivets on Ctr bottom skin, longrn
|
Details
|
|
|
07-14-2003
|
6.00
|
Rivet center fuselage assy
|
Details
|
|
|
07-13-2003
|
6.00
|
Deburr, dimple prime center fus assy
|
Details
|
|
|
07-10-2003
|
4.00
|
finished long,aft deck, F721B
|
Details
|
|
|
07-08-2003
|
4.00
|
riveted Rt side of fuselage
|
Details
|
|
|
07-07-2003
|
6.00
|
Assembled rear fuselage assy
|
Details
|
|
|
07-06-2003
|
6.00
|
Deburred, dimpled, primed skins
|
Details
|
|
|
07-05-2003
|
20.00
|
Assembled aft Fus assy, disasemble
|
Details
|
|
|
06-24-2003
|
24.00
|
Assembled Center Fuselage
|
Details
|
|
|
06-18-2003
|
24.00
|
Completed all Bulkheads
|
Details
|
|
|
06-16-2003
|
6.00
|
lots more holes, drilled floor stiffener
|
Details
|
|
|
06-14-2003
|
12.00
|
Assembled Firewall assy
|
Details
|
|
|
06-08-2003
|
10.00
|
Inventory Fuselage, prep shop
|
Details
|
|