Date
|
Hours
|
Work Log Summary
|
Details
|
05-13-2005
|
8.00
|
Drilled wing tips for lites
|
Details
|
|
|
04-08-2005
|
2.00
|
Clecoed bottom skin onto Left wing
|
Details
|
|
|
04-07-2005
|
6.00
|
Ran conduit/wires/pitot line
|
Details
|
|
|
04-04-2005
|
2.00
|
Set Aileron neutral pos
|
Details
|
|
|
04-02-2005
|
5.00
|
Installed Rt Flap brackets / aileron
|
Details
|
|
|
04-01-2005
|
4.00
|
Finished Rt Aileron
|
Details
|
|
|
03-31-2005
|
3.00
|
Started Rt Aileron
|
Details
|
|
|
03-11-2005
|
3.00
|
Made Aileron push rods
|
Details
|
|
|
03-10-2005
|
3.00
|
Left aileron Bell Crank
|
Details
|
|
|
03-08-2005
|
4.00
|
Left Aileron/Flap fairings
|
Details
|
|
|
03-07-2005
|
4.00
|
Finishing Left flap brackets
|
Details
|
|
|
03-06-2005
|
4.00
|
Completed Left Flap
|
Details
|
|
|
03-05-2005
|
5.00
|
Finished Left Flap
|
Details
|
|
|
03-04-2005
|
4.00
|
More flaps
|
Details
|
|
|
03-03-2005
|
4.00
|
Started final assy of both Flaps
|
Details
|
|
|
03-02-2005
|
5.00
|
Work on RT & Lt Flaps
|
Details
|
|
|
02-28-2005
|
2.00
|
Dimpled Rt LE Nose skin, Rt Flap Ribs
|
Details
|
|
|
02-26-2005
|
6.00
|
Rt Flap
|
Details
|
|
|
02-25-2005
|
10.00
|
Flaps
|
Details
|
|
|
02-24-2005
|
6.00
|
Started back on Ailerons/Flaps
|
Details
|
|
|
05-11-2003
|
10.00
|
rivet right wing
|
Details
|
|
|
05-04-2003
|
12.00
|
prep right wing for riveting
|
Details
|
|
|
04-27-2003
|
12.00
|
Assembled, prep, Rt Aileron
|
Details
|
|
|
04-20-2003
|
3.00
|
Rivet spar for Flap
|
Details
|
|
|
04-19-2003
|
6.00
|
Finish Tank
|
Details
|
|
|
04-13-2003
|
3.00
|
Install vent line, parts on ind rib etc
|
Details
|
|
|
04-12-2003
|
4.00
|
More riveting and black stuff
|
Details
|
|
|
04-08-2003
|
5.00
|
Started Black stuff on Tank (Sealing)
|
Details
|
|
|
04-07-2003
|
8.00
|
Finish prep on Tank, ready to seal
|
Details
|
|
|
04-01-2003
|
3.00
|
Prep tank, platenuts on T912 and ring
|
Details
|
|
|
03-31-2003
|
3.00
|
Mount Tank, drill all holes
|
Details
|
|
|
03-30-2003
|
6.00
|
Riveted LE, start on Tank
|
Details
|
|
|
03-24-2003
|
6.00
|
cleco top skins & Leading Edge
|
Details
|
|
|
03-10-2003
|
5.00
|
Riveted ribs to main and rear spar
|
Details
|
|
|
03-03-2003
|
4.00
|
Finished Rt Wing skeleton, ass rt LE
|
Details
|
|
|
03-02-2003
|
6.00
|
Started Right Wing!!!!!
|
Details
|
|
|
02-25-2003
|
1.00
|
Ordered Fuselage!!!!
|
Details
|
|
|
02-18-2003
|
2.00
|
Assembled skeleton of Rt Flap
|
Details
|
|
|
02-17-2003
|
2.00
|
Dimpled wrong side on bottom skin.......
|
Details
|
|
|
02-11-2003
|
2.00
|
Deburred, primed Left Flap
|
Details
|
|
|
02-10-2003
|
4.00
|
Assembled left Flap
|
Details
|
|
|
02-04-2003
|
4.00
|
Fought the trailing edge of the Aileron
|
Details
|
|
|
02-03-2003
|
6.00
|
Assebled and riveted Aileron
|
Details
|
|
|
02-02-2003
|
5.00
|
deburr, dimple, prime skeleton
|
Details
|
|
|
02-01-2003
|
5.00
|
mounted stiffeners/primed
|
Details
|
|
|
01-27-2003
|
18.00
|
Top skins DONE! Start Aileron
|
Details
|
|
|
01-26-2003
|
6.00
|
Install/rivet LE, Temp Install tank
|
Details
|
|
|
01-25-2003
|
5.00
|
Assemble and rivet Leading Edge
|
Details
|
|
|
01-24-2003
|
8.00
|
Deburred, dimpled, and dimpled
|
Details
|
|
|
01-23-2003
|
5.00
|
Drilled and drilled skins
|
Details
|
|
|
01-22-2003
|
8.00
|
Riveted baffle and mounted Tank
|
Details
|
|
|
01-21-2003
|
1.50
|
Mount access plate, touch-up
|
Details
|
|
|
01-20-2003
|
6.00
|
Finished riveting & sealing tank w/o baf
|
Details
|
|
|
01-19-2003
|
6.00
|
Assembled tank, sealed ribs
|
Details
|
|
|
01-14-2003
|
4.00
|
sealed gas cap, stiffeners, drain
|
Details
|
|
|
01-13-2003
|
1.00
|
Flared Vent tube, dimpled ribs
|
Details
|
|
|
01-12-2003
|
6.00
|
Finished prep on tank, dimpled skin
|
Details
|
|
|
01-07-2003
|
4.00
|
Prepare access plate and tank rib
|
Details
|
|
|
01-05-2003
|
5.00
|
fabricated T905, capacitive sender unit
|
Details
|
|
|
12-31-2002
|
5.50
|
drilling and more deburring on tank
|
Details
|
|
|
11-26-2002
|
4.00
|
Mounted tank on spar, drilled brackets
|
Details
|
|
|
11-24-2002
|
10.00
|
Assemble tank and mount on spar
|
Details
|
|
|
10-29-2002
|
3.00
|
Assembled and mounted front leading edge
|
Details
|
|
|
10-22-2002
|
5.00
|
Mount doubled plate, in & outboard skins
|
Details
|
|
|
10-21-2002
|
12.50
|
Drilled deburred spars and wing ribs
|
Details
|
|
|
10-14-2002
|
9.00
|
finish L FWD spar, began L REAR spar
|
Details
|
|
|
10-13-2002
|
13.00
|
L FWD spar nut plates, tie downs
|
Details
|
|
|
10-08-2002
|
3.00
|
inventory wing kit
|
Details
|
|