Date
|
Hours
|
Work Log Summary

|
Details

|
06-24-2024
|
2.00
|
Install Permanent Battery Charger Connections
|
Details
|
 |
|
07-28-2020
|
9.00
|
New battery, Redesigned Hold-Down, Moved Alt-Air
|
Details
|
|
|
07-14-2020
|
5.00
|
Install New Panel LED Lights
|
Details
|
|
|
11-07-2018
|
2.00
|
Tied Wire Bundles (Continued)
|
Details
|
|
|
11-07-2018
|
2.00
|
Tied Wire Bundles (Continued)
|
Details
|
|
|
11-06-2018
|
2.00
|
Tied Wire Bundles (Continued)
|
Details
|
|
|
11-05-2018
|
5.00
|
Tied all electrical wires into bundles
|
Details
|
|
|
08-29-2018
|
1.50
|
Adjusted Elevator Trim to Center Pitch-Trim Indica
|
Details
|
|
|
05-05-2018
|
6.00
|
Found Electrical Fault in Aileron Trim Servo
|
Details
|
|
|
04-10-2018
|
7.00
|
Installed Alternator Warning Light and Alternator
|
Details
|
|
|
04-08-2018
|
5.00
|
Installed UNISON Slick LASAR Low Voltage Control H
|
Details
|
|
|
03-20-2018
|
9.00
|
Installed (2) Appareo Stratus USB Charging Ports
|
Details
|
|
|
06-29-2017
|
12.00
|
Oil Pressure and Fuel Pressure Sending Units
|
Details
|
|
|
06-27-2017
|
12.00
|
Oil Temp/Fuel Flow/EGT/CHT & Air Temp sensor wirin
|
Details
|
|
|
06-24-2017
|
4.00
|
Right/Left Resistive Float Fuel Level Senders to E
|
Details
|
|
|
06-23-2017
|
4.00
|
More EIS Wiring and Sensor/Component Installation
|
Details
|
|
|
06-19-2017
|
18.00
|
Began wiring the GRT EIS
|
Details
|
|
|
06-13-2017
|
4.00
|
Completed Garmin GMA 240 Audio Panel Wiring
|
Details
|
|
|
06-11-2017
|
18.00
|
Completed GRT EFIS Connections
|
Details
|
|
|
06-06-2017
|
10.00
|
Completed Final GRT AHRS Connections
|
Details
|
|
|
06-02-2017
|
6.00
|
Mounted the Grand Rapids Technologies (GRT) GPS RA
|
Details
|
|
|
05-02-2017
|
1.00
|
Garmin GNS 430W (continued)
|
Details
|
|
|
05-01-2017
|
15.00
|
Completed Garmin GNS 430W WAAS COM/NAV Radio
|
Details
|
|
|
04-30-2017
|
15.00
|
ICOM 210A Communications Radio Installed
|
Details
|
|
|
04-29-2017
|
1.00
|
Completed sample of spreadsheets I developed
|
Details
|
|
|
04-27-2017
|
12.00
|
Completed Garmin GDU 370 NAV System Wiring
|
Details
|
|
|
04-26-2017
|
9.00
|
Avionics, Radio, & Equipment List
|
Details
|
 |
|
04-25-2017
|
10.00
|
Autopilot NAV Signal Control Switch
|
Details
|
|
|
04-24-2017
|
15.00
|
Completed TruTrack DigiFlight Autopilot Wiring
|
Details
|
|
|
04-19-2017
|
10.00
|
Finished DYNON EFIS/Magnetometer/PC Wiring
|
Details
|
|
|
04-17-2017
|
10.00
|
Finished GTX 327 Transponder Integration Wiring
|
Details
|
|
|
04-12-2017
|
8.00
|
Completed all NavWorx ADS60-EXP wiring
|
Details
|
|
|
04-11-2017
|
10.00
|
Nutplates installed for all non-Garmin equipment
|
Details
|
|
|
04-10-2017
|
10.00
|
Grand Rapids Technologies Engine Information Syste
|
Details
|
|
|
04-09-2017
|
3.00
|
Grand Rapids HX EFIS Harness Cont.
|
Details
|
|
|
04-08-2017
|
8.00
|
Inside of GNS 430W rack showing back plate
|
Details
|
|
|
04-07-2017
|
10.00
|
Grand Rapids HX EFIS Harness Build-Up
|
Details
|
|
|
04-06-2017
|
1.00
|
More Built-up Harnesses for GNS 430W
|
Details
|
|
|
04-05-2017
|
40.00
|
GNS 430W COM/NAV Radio Harnesses
|
Details
|
|
|
04-03-2017
|
65.00
|
Created an Integration Schematic
|
Details
|
|
|
03-04-2017
|
1.00
|
Integration Schematic cont.
|
Details
|
|
|
01-30-2017
|
24.00
|
Wired GMA 240 Audio Panel to headset jacks & grips
|
Details
|
|
|
09-05-2016
|
11.50
|
Continued wiring AOA CPU, Controls, & Indicator
|
Details
|
|
|
09-03-2016
|
3.00
|
Wiring AOA Flap Switch
|
Details
|
|
|
09-01-2016
|
7.50
|
Completed Flap System Wiring
|
Details
|
|
|
05-17-2016
|
4.00
|
Organized remaining wiring
|
Details
|
|
|
05-16-2016
|
12.00
|
Completed wiring on TCW and GRT Backup Batteries
|
Details
|
|
|
05-14-2016
|
18.00
|
Received, Installed, and wired PowerGuard Module
|
Details
|
|
|
05-12-2016
|
4.00
|
Verified completed wiring with Excel Integration
|
Details
|
|
|
05-10-2016
|
4.00
|
Completed Elevator/Aileron Trim Wiring & Clock
|
Details
|
|
|
04-30-2016
|
10.00
|
Verify/Completed all wiring for panel and instrume
|
Details
|
|
|
01-05-2016
|
10.00
|
Pulled all wires from wings and fuselage to cockpi
|
Details
|
|
|
11-13-2015
|
45.00
|
Backup Batteries for Critical Systems
|
Details
|
|
|
11-12-2015
|
10.00
|
Left Wing Root Wires completed with Molex Connecto
|
Details
|
|
|
11-10-2015
|
10.00
|
Left Wing Wiring terminated in Molex Connectors an
|
Details
|
|
|
11-09-2015
|
10.00
|
Right Wing Root Wires completed with Molex Connect
|
Details
|
|
|
11-07-2015
|
30.00
|
Right wing wires completed with labels
|
Details
|
|
|
11-06-2015
|
10.00
|
Left & Right Wing Wiring Schmatics & Labels
|
Details
|
|
|
11-05-2015
|
3.00
|
Installing outside air temp sensor
|
Details
|
|
|
11-04-2015
|
8.00
|
ELT System Test Light & Test Warning Horn, Dynon E
|
Details
|
|
|
11-03-2015
|
10.00
|
Installed cockpit & baggage compartment lighting
|
Details
|
|
|
11-01-2015
|
150.00
|
Building the Electrical System Schematics
|
Details
|
|
|
03-26-2015
|
12.00
|
First wires routed to the dropdown terminal panel
|
Details
|
|
|
03-12-2015
|
6.00
|
Clock Countdown Warning Tone Speaker
|
Details
|
|
|
03-09-2015
|
12.00
|
Avionics Cooling Fan (cont.)
|
Details
|
|
|
03-06-2015
|
10.00
|
Avionics Cooling Fan (continued)
|
Details
|
|
|
03-05-2015
|
15.00
|
Install Avionics Cooling Fan Ducting
|
Details
|
|
|
02-27-2015
|
9.00
|
Install avionics cooling fan & fabicate mounting b
|
Details
|
|
|
02-21-2015
|
6.00
|
"New & Improved" terminal end, hinged, drop down p
|
Details
|
|
|
02-19-2015
|
21.00
|
New Terminal-End Drop-Down Panel
|
Details
|
|
|
02-06-2015
|
15.00
|
Original Terminal-End Drop-down Panel
|
Details
|
|
|
02-02-2015
|
10.00
|
Rewired strobe shielded wires to ground
|
Details
|
|
|
01-30-2015
|
80.00
|
Rewired all previously installed wiring in fuselag
|
Details
|
|
|
04-28-2012
|
8.00
|
Misc electrical system pictures
|
|
|
|
04-28-2012
|
6.00
|
Dimmer switch, Electronic Ignition, Grounding bloc
|
|
|
|
04-21-2012
|
20.00
|
Main and Always Hot Fuse and Distribution Panels
|
Details
|
|
|
04-14-2012
|
10.00
|
Main power feeds from master and battery relays
|
|
|
|
04-07-2012
|
5.00
|
Wiring microphone and headset jacks
|
Details
|
|
|
04-07-2012
|
5.00
|
Headset and Microphone Jack install
|
|
|
|
04-04-2012
|
2.00
|
Cockpit Lights Installed
|
Details
|
|
|
04-03-2012
|
5.00
|
Soldering wires for cockpit lights
|
Details
|
|
|
08-20-2011
|
10.00
|
Tail Strobe and Nav Light Wiring
|
Details
|
|
|
06-17-2011
|
5.00
|
Wiring for battery & master and starter relays
|
Details
|
|
|
03-12-2011
|
8.00
|
Fabricate & Install Battery Carrier & Battery
|
Details
|
|
|
12-01-2007
|
7.00
|
Finished Wiring the Wings
|
Details
|
|
|
11-24-2007
|
5.50
|
planning my electrical system, pulling wires, and
|
Details
|
|
|
11-15-2007
|
3.00
|
GRT Magnetometer, Gretz Heated Pitot , and Landing
|
Details
|
|