KitLog pro

Powered By Kitlog Pro v2.0

RVGator
Work Logs Found: 57
Category Work Time: 153 Hours
 Date
Hours
Work Log Summary

Details

 03-13-2012
1.00
Pitot Heat Warning
Details
       

 03-09-2012
4.75
G/S Antenna & Alt Static Air
Details
       

 03-06-2012
2.50
Tested sensor circuits
Details
       

 01-27-2012
2.50
Installed cooling fan and guard
Details
       

 01-26-2012
1.50
Started Coolin Fan Guard
Details
     

 01-14-2012
3.25
Cooling Fan - ELT cable
Details
       

 01-13-2012
2.25
Continued Cooling Fan
Details
       

 01-12-2012
3.50
2: Drilled baggage wall for air pass thru
Details
       

 01-11-2012
0.75
1: More micro on duct
Details

 01-10-2012
0.50
Laid on dry micro to fair inlet
Details
     

 01-08-2012
0.75
Laid up new inlet duct
Details

 01-01-2012
2.50
1: Sanded and formed cooling duct
Details
       

 12-31-2011
2.00
Glassed cooling duct
Details
       

 12-30-2011
2.50
Cooling duct
Details
       

 12-29-2011
1.50
More cooling fan work
Details
       

 12-28-2011
1.25
Equpment Cooling Fan
Details
       

 03-25-2011
3.25
Part 1: Removed panel, lace tied harness
Details
     

 03-23-2011
2.50
More RFI trouble shoting
Details
     

 03-20-2011
3.75
1. Trouble shot RFI again
Details

 03-17-2011
0.00
Part 2: Static sytem leak check
Details
       

 03-17-2011
4.00
Part 1: Trim speed switch Pitot, Static and AOA li
Details
       

 03-11-2011
2.50
Solved DSAB drops
Details

 03-06-2011
1.75
Rear seat jacks
Details
       

 03-05-2011
3.25
PLT MIC now works, config AP
Details
       

 03-04-2011
4.75
PLT- headset jacks
Details
     

 03-03-2011
0.00
Replace molex for DB9
Details
       

 03-03-2011
5.25
Part 1: Updated Dynon Equipment
Details
       

 03-02-2011
6.25
Powered up the panel
Details
     

 03-01-2011
7.00
Grounds and DSAB
Details
       

 02-28-2011
8.75
New wire bundle support
Details
       

 02-27-2011
4.75
More wires and CBs
Details
       

 02-26-2011
3.25
Fixed broken wire, tied more wire!
Details
       

 02-25-2011
6.25
Conected 496 to intercom
Details
       

 02-24-2011
3.50
Installd new power wires to 430W
Details
       

 02-20-2011
5.25
GPS Dock and wire lace
Details
       

 02-16-2011
0.00
Part 2: 496 data cable
Details
       

 02-16-2011
5.25
Part 1: G496 Data Cable
Details
       

 02-15-2011
3.50
AP-74 wires
Details
       

 02-14-2011
2.50
Installed support clamp and stuff
Details
       

 02-12-2011
3.50
DRILLED FINGER!!
Details
     

 02-11-2011
4.75
Tied wire bundle
Details
       

 02-10-2011
2.25
Terminated right side switches
Details
     

 02-09-2011
4.75
Dynon serial plug holder
Details
       

 02-08-2011
0.00
Part 2; Re-installed left panel switches
Details
     

 02-08-2011
6.25
Part 1: Pliced comm wires
Details
       

 02-07-2011
1.25
DSAB bus Hub
Details
     

 02-06-2011
1.50
Made retainer bracket for HS34
Details

 02-05-2011
3.50
Mapped wires/Orgainize harness
Details
     

 02-01-2011
1.75
Installed Inst GND Bus
Details
       

 09-15-2009
0.25
Test fit 3rd Panel
Details
       

 08-31-2009
1.25
Test fit Panel
Details
       

 08-17-2009
2.00
Instrument panel arrived
Details
       

 07-24-2009
0.00
Panel cutting
Details
       

 07-06-2009
0.00
Final Panel Design
Details
       

 06-19-2009
0.00
Panel Plans
Details
       

 06-11-2009
0.00
Panel Design
Details
     

 11-05-2007
0.00
First item of panel arrived today
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.