Powered By Kitlog Pro v2.0
Cheetah XLS Web Site
Cheetah XLS
Empennage
Work Logs Found:
11
Category Work Time:
12 Hours
Date
Hours
Work Log Summary
Details
11-30-2007
0.50
Horizontal stabilizer adjustment cables installed
11-27-2007
1.00
Elevator trim installation
11-25-2007
0.50
Rudder installation
11-23-2007
0.00
Horizontal stabilizer assembly
Details
11-23-2007
2.00
Elevator installation
11-22-2007
2.50
Horizontal stabilizer installation
11-22-2007
2.50
Elevator assembly
Details
11-18-2007
0.00
Rudder assembly
11-09-2007
2.00
Fuselage + vertical stabilizer assembly (Plus vent
Details
11-08-2007
1.00
Vertical stabilizer sail installation
Details
11-04-2007
0.00
Vertical stabilizer frame assembly
Details
SITE NAVIGATION
Contact Builder
Cheetah XLS Home
Category
# Logs
# Hours
All
106
191
Avionics
3
33
Cockpit
15
38
Control linkages
14
14
Empennage
11
12
Engine
6
12
Fuselage
26
26
Landing Gear
9
7
Pre Assembly
5
12
Tools
1
Wings
16
37
Copyright © 2001-2024 Matronics. All Rights Reserved.