Powered By Kitlog Pro v2.0
ProBuilder Legacy
Legacy FG
Horz Stab & Elvtr
Work Logs Found:
7
Category Work Time:
12 Hours
Date
Hours
Work Log Summary
Details
09-28-2007
2.00
Bonding the horizontal stabilizer
Details
09-27-2007
2.00
Elevator travel stops
Details
09-27-2007
2.00
2 BID lay-up on elevators
Details
09-26-2007
1.00
Close-out of elevators
Details
09-25-2007
1.00
Close-out of horizontal stabilizer
Details
09-24-2007
2.00
Preparing horizontal stab. surfaces for bonding
Details
09-24-2007
2.00
Preparing elevator surfaces for bonding and counte
Details
SITE NAVIGATION
Contact Builder
Legacy FG Home
Category
# Logs
# Hours
All
42
81
Canopy
7
16
Engine
1
3
Fuel System
1
1
Fuselage
2
7
Horz Stab & Elvtr
7
12
Landing Gear
4
11
Miscellaneous
4
4
Vrtcl Stab. & Rdr
5
7
Wings
11
20
Copyright © 2001-2024 Matronics. All Rights Reserved.