Work Logs Found: 300
Category Work Time: 530 Hours
 Date
Hours
Work Log Summary

Details

 05-21-2015
1.50
Transferred fuselage to saw horses.
Details
       

 05-19-2015
1.00
Prepared saw horses for fuselage
Details
     

 04-01-2014
1.00
cockpit floor covers installed
Details
       

 03-29-2014
4.00
Tested flap actuator assembly
Details
       

 03-28-2014
1.50
Seat back brace and flap actuator covers
Details
       

 03-27-2014
2.00
Finished flap actuator installation
Details
       

 03-26-2014
1.50
More flap actuator assembly work
Details
     

 03-24-2014
2.00
Flap actuator assy work
Details
       

 03-23-2014
1.50
Prepped and primed flap actuator parts
Details
     

 03-22-2014
0.50
Fabbed F-767 attach plate
Details
     

 03-21-2014
2.00
Flap actualtor work
Details
     

 03-06-2014
1.50
Flap actuator work
Details
       

 03-03-2014
1.50
Flap bearing block work
Details
     

 03-02-2014
2.00
Flap actuator work
Details
       

 02-27-2014
1.00
Center cover and fuel valve mount
Details
       

 02-23-2014
1.00
Center cover F-782C work
Details
     

 02-22-2014
1.50
Fuel valve plate and cover work
Details
       

 02-09-2014
2.00
Center cover work
Details
       

 02-05-2014
1.50
Started F-782C center cabin cover
Details
     

 02-04-2014
1.00
Completed seat backs!
Details
       

 02-03-2014
3.00
Seat back parts prep.
Details
       

 01-31-2014
0.50
Right seat back parts
Details
     

 01-28-2014
1.50
Right seat back work
Details
       

 01-19-2014
1.50
Started right seat back fabrication
Details
     

 01-15-2014
1.50
Finished drilling left seat back.
Details
     

 01-14-2014
1.50
Drilled holes in left seat back
Details
       

 01-13-2014
1.50
Left seat back work
Details
       

 01-06-2014
0.75
Seat back work
Details
     

 01-04-2014
2.50
Seat back work
Details
       

 11-26-2013
2.50
Routed slot in F-637B angles
Details
       

 11-18-2013
1.00
Seat back angle work
Details

 11-14-2013
3.00
Tunnel cover work
Details
       

 11-13-2013
1.50
F-741 tunnel cover work
Details
       

 11-04-2013
0.75
Fabbed F-741A(R) tunnel support
Details
       

 11-03-2013
2.00
Floor and F-741 tunnel work
Details
       

 11-02-2013
3.00
Seat floor work
Details
       

 11-01-2013
1.50
Right seat work
Details
       

 10-30-2013
2.00
Left seat work
Details
       

 10-25-2013
1.00
Seat back hinge work
Details
     

 10-22-2013
0.50
Started on seat backs
Details
     

 10-19-2013
2.00
Primed aft fuse top skins and parts
Details
       

 10-17-2013
2.00
Aft top fuse skin dimpling
Details

 10-16-2013
1.50
Started dimpling aft fuse skin holes
Details
       

 10-15-2013
1.00
Aft skin and parts deburring
Details

 10-14-2013
1.50
Aft fuse prep
Details
     

 10-11-2013
1.00
Aft bulkhead prep
Details
     

 10-08-2013
1.00
F-706 bulkhead covers removed for prep
Details
       

 10-07-2013
1.50
Bellcrank channel work
Details
       

 10-06-2013
1.00
Upper baggage bulkhead work
Details
       

 10-05-2013
2.00
Finished, painted angle for rotisserie
Details
       

 10-03-2013
1.00
Installed angle for rotisserie
Details
       

 09-30-2013
2.00
F-706 bulkhead work
Details
       

 09-18-2013
2.00
Completed rotisserie, F-706 bulkhead
Details
       

 09-15-2013
1.00
F-706 nutplate work
Details
     

 09-14-2013
0.00
Picked up engine stand from Kent
Details
     

 09-08-2013
2.00
Baggage bulkhead work.
Details
       

 09-04-2013
3.50
Worked on rotisserie
Details
       

 09-02-2013
3.00
Painted baggage covers, started rotisserie.
Details
       

 08-31-2013
2.00
Baggage covers and floor work.
Details
       

 08-29-2013
2.00
Baggage side cover work.
Details
       

 08-27-2013
1.00
Painted aft baggage side covers.
Details
       

 08-25-2013
4.00
Aft fuselage skin prep
Details
       

 08-22-2013
3.00
Aft top skin and skeleten work.
Details
       

 08-21-2013
0.50
Drilled J stringers to bulkhead
Details
       

 08-20-2013
2.00
Top fuselage stringer work.
Details
       

 08-19-2013
2.00
F-656 gusset work
Details
       

 08-18-2013
2.00
Elevator bell crank work
Details
       

 08-15-2013
1.00
F-706 bulkhead work
Details
     

 07-31-2013
0.25
Riveted bell crank components
Details
     

 07-30-2013
2.00
F-706 bulkhead work
Details
       

 07-29-2013
1.50
Baggage floor rib work.
Details
       

 07-28-2013
0.75
Baggage floor rib work
Details
       

 07-25-2013
1.50
Elevator bell crank work
Details
     

 07-24-2013
1.50
Finished installing F-695 gussets.
Details
       

 07-22-2013
0.50
Prepped shoulder harness anchors
Details
     

 07-12-2013
4.00
Canopy side rail work.
Details
       

 07-11-2013
0.00
Picked up anodized parts
Details
       

 07-08-2013
1.00
F-695 gusset work
Details
       

 07-07-2013
1.50
Forward fuse gusset work
Details
       

 07-06-2013
1.50
F-695 gusset work
Details
       

 07-05-2013
2.00
Finishing fab work on canopy side rails
Details
       

 07-03-2013
2.50
Canopy side rail work
Details
       

 07-02-2013
2.00
F-757 work
Details
       

 07-01-2013
1.50
Deburred F-757 gussets
Details

 06-30-2013
0.75
Recovering from vacation
Details
     

 06-10-2013
1.50
Riveted F-714 aft deck.
Details
       

 06-09-2013
1.50
More aft deck work
Details
     

 06-08-2013
0.75
Match drilled aft fuse deck F-714
Details
     

 06-06-2013
1.50
Leveled fuselage
Details
       

 05-29-2013
3.00
"Rolled the Canoe"
Details
       

 05-28-2013
2.00
More forward fuse skin riveting
Details
       

 05-27-2013
3.00
Forward fuse skin riveting
Details
       

 05-26-2013
0.25
Bottom fuse skin rivet stuff
Details
     

 05-25-2013
2.00
Drilled out some bad rivets
Details
     

 05-24-2013
1.00
Forward fuse skin rivets
Details
     

 05-23-2013
1.00
Left forward fuse skin riveting
Details
       

 05-22-2013
0.75
Left forward fuse riveting
Details
     

 05-21-2013
1.50
Backriveted the left forward fuse skin.
Details
       

 05-20-2013
1.50
More backriveting on right forward skin.
Details
       

 05-18-2013
1.00
Installed left side skin rivets
Details
     

 05-17-2013
1.00
Right forward skin riveting continued....
Details
     

 05-16-2013
0.50
Forward cockpit floor clecoed in place
Details
       

 05-15-2013
1.00
Aft fuse skin riveting
Details
       

 05-14-2013
0.75
F-711 bulkhead rivets
Details
     

 05-13-2013
0.50
Riveted on aft end of tail cone
Details
       

 05-12-2013
0.50
Inserted rivets in forward fuse
Details

 05-11-2013
3.00
Backriveted right forward fuse skin
Details
       

 05-01-2013
1.00
Inserted right fuselage skin rivets
Details
     

 04-23-2013
1.50
Applied 3M Firebarrier 2000+ to firewall.
Details
       

 04-21-2013
1.50
Inserted rivets for right forward side skin.
Details
       

 04-15-2013
1.50
Firewall gusset bolts torqued.
Details
     

 04-14-2013
2.00
Worked on F-7114 gussets
Details
       

 04-13-2013
1.00
F-7114 gusset work
Details
       

 04-11-2013
1.50
Forward fuse misc work
Details
       

 04-05-2013
2.00
Forward fuse misc work
Details
       

 03-31-2013
2.50
Clecoed fuselage side skins to skeleton
Details
       

 03-29-2013
2.50
Clecoed center section to aft fuselage
Details
       

 03-27-2013
1.50
Riveted stiffeners to firewall
Details
       

 03-26-2013
3.00
Started riveting the forward fuse
Details
       

 03-25-2013
2.00
More forward fuse parts painting
Details
       

 03-24-2013
3.00
F-705 bulkhead painting
Details
       

 03-21-2013
1.00
Finished deburring right fuse skin.
Details
       

 03-17-2013
3.00
Started painting side skin.
Details
       

 03-16-2013
2.00
Finished dimpling left fuse side skin.
Details
       

 03-15-2013
1.00
Started dimpling left side skin, finally.
Details
       

 03-12-2013
0.50
Still deburring left forward fuse skin.....
Details
     

 03-11-2013
1.50
Deburred left forward side skin
Details
     

 03-05-2013
1.50
Finished countersinking forward fuse parts.
Details
       

 03-04-2013
2.50
Started painting inside fuselage parts....
Details
       

 03-03-2013
4.00
Priming fuse parts.
Details
       

 02-17-2013
1.50
Dimpling and deburring
Details

 02-16-2013
4.00
More forward fuse prep......
Details
       

 02-15-2013
1.00
More finish work on longerons.
Details
     

 02-13-2013
1.50
Finished countersinking longerons.
Details
       

 02-12-2013
1.50
Started countersinking the longerons
Details
       

 02-11-2013
0.75
Deburred both longerons
Details
     

 02-10-2013
4.00
Started priming forward fuse parts.
Details
     

 02-09-2013
4.00
Disassembled forward fuse and removed center secti
Details
       

 02-05-2013
2.00
Riveted right side F-684 gusset.
Details
       

 01-31-2013
2.00
Removed left side forward skin.
Details
       

 01-30-2013
2.00
Match drilled all remaining holes in fuselage.
Details
       

 01-29-2013
1.50
Fit and match drilled right side baggage area ribs
Details
       

 01-28-2013
1.25
Fit baggage area side skin ribs.
Details
     

 01-27-2013
2.00
Matched drilled forward fuse floor stiffeners.
Details
       

 01-26-2013
1.00
Match drilled forward fuselage bottom skin.
Details

 01-21-2013
4.00
Mounted rudder and brake assy in fuselage
Details
       

 01-15-2013
2.00
Drilled and mounted bottom of master cylinders.
Details
       

 01-13-2013
1.50
Installed split collars, bushings and springs for
Details
       

 01-12-2013
0.50
Mounted last of the four brake pedals
Details
       

 01-11-2013
2.00
Installed long bolts to mount brake pedals.
Details
       

 01-07-2013
2.00
Assembled brake pedal components
Details

 01-06-2013
1.00
Painted brake pedals.
Details

 01-05-2013
3.00
Finished deburring and priming rudder/brake pedal
Details

 01-01-2013
1.00
Studied rudder pedal and brake assy drawings
Details

 12-29-2012
2.00
F-796B angles, Gerry stopped by
Details
       

 12-27-2012
3.00
Fabbed F-796 spacers and reinforcement angles
Details
       

 12-26-2012
4.00
Match drilled F-902 forward bulkheads.
Details
       

 12-20-2012
1.00
Fabricated other F-684 gusset.
Details
     

 12-17-2012
1.00
Match drilled both F-717 lower longerons
Details
       

 12-16-2012
2.00
Fabricated new F-717-L lower longeron
Details
       

 12-10-2012
1.25
Fabbed and drilled F-684-L gusset.
Details
     

 12-09-2012
1.50
Worked on F-717's again.....
Details

 12-04-2012
0.00
Tail wheel steering link arrived from Flyboy Acces
Details
     

 12-03-2012
0.50
More work on F-717 lower longerons
Details
       

 11-13-2012
1.50
More fitting of F-719B angle clips.
Details
       

 11-12-2012
1.50
Match drilled F-719 skin stiffeners.
Details
       

 11-11-2012
1.50
Fit and drilled F-713's to side skins
Details
       

 09-27-2012
1.00
Drilled skins to the fire wall
Details
       

 09-24-2012
0.50
Started clamping skin, longerons and WD-602's
Details
       

 09-23-2012
1.00
Set fire wall in place.
Details
       

 09-19-2012
1.25
Fabbed F-704-L
Details
       

 09-15-2012
1.50
Matched drilled right longeron and trimmed.
Details
       

 09-14-2012
0.75
Started match drilling longerons.
Details

 09-13-2012
1.50
Installed F-623 baggage outside ribs.
Details
     

 09-13-2012
0.00
Bell tail wheel arrived.
Details
       

 09-10-2012
1.50
Made conical bend on F-770 forward skins.
Details
       

 09-09-2012
1.25
Reinforced and clecoed arm rests.
Details
       

 09-08-2012
2.00
Installed F-770 forward fuselage skins.
Details
       

 09-03-2012
6.00
Joined aft fuse to center section
Details
       

 09-02-2012
1.50
Drilled and dimpled F-706 bulkhead holes
Details
       

 09-01-2012
4.00
Screwed down cabin floors.
Details
       

 08-31-2012
1.00
Finished cabin bottom skin.
Details
       

 08-30-2012
1.00
More riveting on fuse center bottom skin.
Details
       

 08-27-2012
1.50
Started riveting fuse center bottom skin.
Details
       

 08-26-2012
7.00
Finished riveting seat and baggage ribs to bulkhea
Details
       

 08-25-2012
3.00
Finished riveting seat pan floor nutplates.
Details
       

 08-23-2012
1.50
Starting installing seat ribs.
Details
       

 08-19-2012
3.00
Baggage floor nutplates installed.
Details
       

 08-18-2012
1.50
Started installing center section floor nutplates
Details
       

 07-04-2012
0.50
Started deburring fuse center section
Details

 07-03-2012
0.50
Finished match drilling right seat and baggage flo
Details

 06-25-2012
1.25
Riveted and bolted doublers for seat ribs.
Details
       

 06-24-2012
3.00
Worked on seat rib top covers
Details
       

 06-17-2012
1.00
Clecoed center fuse ribs and floors.
Details
       

 06-16-2012
3.00
Installed crotch strap brackets and seat ribs.
Details
       

 06-12-2012
1.00
Painted crotch strap brackets.
Details
       

 06-11-2012
1.50
Right side crotch strap bracket prep.
Details
       

 06-10-2012
4.00
Started crotch strap bracket installation.
Details
       

 06-09-2012
5.00
More work on F-704 area.
Details
       

 06-08-2012
2.50
Finished priming center fuse parts.
Details
       

 06-07-2012
2.50
Cleaned and started priming center fuse parts.
Details
     

 06-05-2012
2.50
Finished deburring and started dimpling center fus
Details
       

 06-04-2012
0.50
Deburred some baggage ribs.
Details
     

 06-03-2012
1.50
Deburred center fuse parts.....
Details
     

 06-02-2012
6.00
Started deburring fuse center section
Details
       

 05-30-2012
2.00
Match drilled F-704H's and all seat ribs.
Details
       

 05-29-2012
2.00
Bolted F-704 bulkhead halves together.
Details
       

 05-28-2012
1.50
Made steel F-704 bulkhead spacers to replace woode
Details
     

 05-27-2012
2.00
Fluted F-715 end seat ribs, fabbed attach straps.
Details
       

 05-25-2012
1.00
Fluted F-715 end seat ribs.
Details
       

 05-21-2012
0.75
Starting fitting F-623 corner ribs.
Details
       

 05-20-2012
5.00
Started assembly of fuselage center section.
Details
       

 05-17-2012
2.50
Seat rib and access plate fab
Details
       

 05-16-2012
4.25
Center fuse seat ribs continued.....
Details
       

 05-15-2012
3.00
Started on fuselage center section.
Details
       

 05-12-2012
1.50
Finished riveting the aft fuse left skin.
Details
       

 05-11-2012
2.00
Finished riveting aft right fuselage skin.
Details
       

 05-09-2012
2.00
Started back riveting aft fuse side skins
Details
       

 05-06-2012
3.00
Started riveting tail cone skin to bulkheads.
Details
       

 05-03-2012
2.00
Drilled out more rivets.
Details
     

 05-02-2012
0.50
Riveted a few more for bottom skin.
Details
     

 04-29-2012
3.00
Riveted aft bottom skin.
Details
       

 04-28-2012
5.00
Finished tail cone, clecoed aft fuse
Details
       

 04-26-2012
2.00
Rivets tail cone parts together.
Details
       

 04-25-2012
3.00
Started clecoing the aft fuselage for final time.
Details
       

 04-24-2012
0.50
Dimpled bulkheads, leveled saw horses.
Details

 04-23-2012
1.00
Prepped J-channel stringers
Details
       

 04-22-2012
4.00
Finished tail cone parts prep.
Details
       

 04-21-2012
0.50
Drilled socket access hole in tail cone skin.
Details
     

 04-17-2012
1.50
Match drilled tail cone skin to bulkheads.
Details
     

 04-16-2012
2.00
F-779 spring opening, fitting bulkheads
Details
       

 04-14-2012
2.00
Finished fitting F-779 tail cone skin
Details
       

 03-27-2012
1.50
New F-779 tail cone skin arrived.
Details
     

 03-26-2012
1.50
Finished deburring aft skins, rolled skin edges.
Details
       

 03-24-2012
1.50
Most aft skin deburring
Details
       

 03-22-2012
1.50
Deburred aft fuse skins.
Details
       

 03-19-2012
1.50
Finished deburring aft fuse bottom skin
Details
       

 03-18-2012
2.00
Finished match drilling aft fuse, disassembled it.
Details
       

 03-17-2012
2.00
Match drilled aft fuse J-stringers with Kevin
Details
       

 03-13-2012
0.00
Clecos, baggage tie-downs, F-727 Ribs arrived.
Details
       

 03-10-2012
1.50
Started Fuse Center Section
Details
       

 02-19-2012
2.00
Final fit of tail cone assembly.
Details
       

 02-18-2012
3.00
Finished fitting tail cone assembly to aft fuse.
Details
       

 02-16-2012
0.25
Started to fit tail cone skin to aft fuse.
Details
       

 02-12-2012
4.00
Start work of tail wheel mount and spring
Details
       

 02-11-2012
2.00
Started assembling aft fuselage
Details
       

 02-05-2012
4.50
Finished bends and twists for longerons
Details
       

 02-04-2012
4.00
Finished bulkhead, started longerons
Details
       

 02-01-2012
1.00
Deburred and primed F-709 and F-710
Details

 01-29-2012
2.50
Finished F-711 bulkhead
Details
       

 01-28-2012
1.50
Deburred and primed F-711
Details
     

 01-26-2012
2.00
Started Bulkhead F-711
Details
       

 01-23-2012
1.50
Finished 706, 707 and 708
Details
       

 01-22-2012
3.50
More F-706 bulkhead
Details
       

 01-19-2012
1.00
Match drilled F-706
Details
       

 01-16-2012
2.00
Started drilling bell crank support ribs
Details
       

 01-15-2012
1.50
Started F-706 bulkhead
Details
       

 01-14-2012
2.00
F-705 Flap Bearing Blocks Fitted
Details
       

 01-09-2012
1.50
Finished riveting F-705.
Details
       

 01-08-2012
2.00
Started riveting F-705 together.
Details
       

 01-07-2012
4.50
Finished fab and then prepped all F-705 parts
Details
       

 01-06-2012
1.50
Worked on top parts for F-705J
Details
     

 01-05-2012
1.50
More work of F-705....
Details
       

 01-04-2012
1.50
F-705 bulkhead work....
Details
       

 01-03-2012
2.00
Riveting F-704D's
Details
       

 01-02-2012
0.00
Parts from Vans arrived
Details
     

 12-29-2011
1.50
Riveting F-704D's....
Details
       

 12-28-2011
1.50
F-704 work continues....
Details
       

 12-28-2011
1.50
F-704 Spacer Blocks
Details
       

 12-24-2011
0.50
F-605C doubler issue
Details
       

 12-23-2011
4.00
Started work on F-704 Bulkhead
Details
       

 12-22-2011
0.50
Located parts for F-705 Bulkhead
Details
       

 12-19-2011
2.00
Finished cover support ribs.
Details
       

 12-18-2011
1.50
Started riveting cover support ribs.
Details
       

 12-15-2011
1.50
Support rib prep and prime...
Details
       

 12-14-2011
1.50
Cover support ribs prep and riveting
Details
     

 12-13-2011
0.50
F-704 cover support ribs
Details
     

 12-12-2011
1.25
F-704 bulkhead nutplates
Details
       

 12-11-2011
3.00
F-704 Bulkhead control column mount
Details
       

 12-10-2011
2.00
Started F-704 Bulkhead
Details
       

 12-07-2011
1.50
Finished the firewall, finally....
Details
       

 12-06-2011
1.50
Riveted F-601Z fuel pump doubler
Details
       

 12-05-2011
1.50
Continued backriveting firewall....
Details
       

 12-04-2011
3.50
Riveting firewall....
Details
       

 12-02-2011
0.50
Started riveting firewall
Details
       

 12-01-2011
0.50
Primed firewall parts
Details
       

 11-30-2011
2.00
Finished countersinking firewall parts
Details
       

 11-29-2011
2.00
Dimpled firewall and started countersinking
Details
       

 11-28-2011
1.50
Firewall deburring.......
Details
     

 11-23-2011
1.50
Finished fuel pump doubler (F-601Z)
Details
       

 11-22-2011
1.00
Final F-601TD angle fit
Details
       

 11-21-2011
1.00
Fabbed F-601TD Brake Line Bracket
Details
       

 11-13-2011
3.00
Started match drilling fire wall.....
Details
       

 11-11-2011
2.00
Fabbed F-601J angles
Details
       

 11-10-2011
1.50
Located Fire Wall Components
Details
       

 11-05-2011
0.00
Inventoried all fuselage hardware
Details
       

 11-04-2011
0.00
Started unpacking and inventorying fuselage kit
Details
       

 11-04-2011
0.00
Fuselage Arrives!
Details
       

 09-02-2011
0.00
Ordered fuselage kit today
Details

 05-12-2011
0.00
Rudder pedals from Aeromold arrived
Details
       