Powered By Kitlog Pro v2.0
Barracuda
Barracuda
Center section
Work Logs Found:
138
Category Work Time:
477 Hours
Date
Hours
Work Log Summary
Details
05-07-2009
4.00
main doors fitted
Details
04-30-2009
6.00
gear doors & secondary door hydrulics
Details
04-21-2009
2.00
pitot tubes and fittings
Details
04-13-2009
4.00
rt wing electrical bundle
Details
03-12-2009
0.00
Parts, systems ,planning
Details
03-09-2009
8.00
hyd lines below seat pans
Details
03-08-2009
2.00
Hydraulic lines at main spar
Details
02-26-2009
5.00
brake lines
Details
02-23-2009
5.00
hrydrulic lines
Details
02-21-2009
4.00
insulate sound proof lower skin
Details
02-12-2009
4.00
hydrulic line brackets
Details
12-28-2008
6.00
Lt side Hardware
Details
12-27-2008
3.00
Lt hardware paint
Details
12-26-2008
4.00
LT hardware primer
Details
12-23-2008
4.00
LT side hardware
Details
12-20-2008
4.00
torque tubes
Details
12-17-2008
2.00
rt hardware final install
Details
12-16-2008
4.00
rt hardware final install
Details
12-14-2008
6.00
Tip rib plates -final install
Details
12-13-2008
3.00
Paint rt side hardware
Details
12-09-2008
2.00
primer
Details
12-06-2008
5.00
prep hardware for paint
Details
12-05-2008
0.00
NAS 1104 shear bolts
Details
12-03-2008
4.00
begin reasembly of hard ware
Details
12-02-2008
4.00
poder coat gear pivots and misc
Details
12-01-2008
2.00
powder coating straps
Details
11-30-2008
3.00
Wheel wells paint
Details
11-29-2008
6.00
wheel well prep
Details
11-28-2008
4.00
wheel wells prep for paint
Details
11-26-2008
3.00
wheel wells prep for paint
Details
11-25-2008
4.00
Tape off and prime
Details
11-22-2008
3.00
prep wells for primer
Details
11-20-2008
5.00
prep wheel wheels for primer
Details
11-18-2008
4.00
walk way sanding
Details
11-17-2008
1.00
inspection holes
Details
11-16-2008
2.00
walk way build up
Details
11-15-2008
8.00
tear down for final finish
Details
11-12-2008
7.00
plumbing , puchrods ect
Details
11-07-2008
4.00
gear side brace plates
Details
11-06-2008
0.00
walk way balsa
Details
11-03-2008
5.00
tip rib plates , turn around bell cranks
Details
10-29-2008
0.00
sequencing valves
Details
10-29-2008
2.00
Push rods
Details
10-29-2008
1.50
push rods
Details
10-29-2008
1.00
control inspection
Details
10-26-2008
5.00
contol column FINAL INSTALL
Details
10-25-2008
3.00
control column
Details
10-23-2008
5.00
hydrualic fittings
Details
10-22-2008
4.00
turn around bell cranks
Details
10-21-2008
1.00
secondary gear door ram mounts
Details
10-20-2008
5.00
control column
Details
10-15-2008
8.00
fabricate control column
Details
10-12-2008
5.00
weather proofing
Details
10-11-2008
3.00
weather proofing
Details
10-04-2008
8.00
secondary gear door rams
Details
09-05-2008
2.00
first coat of primer lower section
Details
09-03-2008
5.00
fairing the gear doors
Details
08-23-2008
20.00
lower center section
Details
08-20-2008
5.00
fair in gear gap seals
Details
08-17-2008
6.00
secondary gear doors bearing - do over
Details
08-17-2008
5.00
secondary gear door gap seal
Details
08-17-2008
5.00
main gear door gap seals
Details
08-17-2008
0.00
gear doors
Details
07-09-2008
10.00
secondary gear doors
Details
07-09-2008
1.00
secondary door hinges
Details
07-02-2008
2.00
inner gear door hinges
Details
07-01-2008
1.00
inner gear door hinges
Details
06-30-2008
0.00
gear doors - research , design
Details
06-29-2008
3.00
gear doors
Details
06-28-2008
4.00
gear doors
Details
06-27-2008
3.00
skin gear doors
Details
06-23-2008
3.00
foam gear doors
Details
06-19-2008
1.00
made lower gear door bracket
Details
06-19-2008
6.00
fit right gear door
Details
06-18-2008
5.00
landing gear doors
Details
06-17-2008
2.00
remove tack strips
Details
06-16-2008
3.00
Skin lwr center section
Details
06-16-2008
5.00
prep lower skin
Details
06-16-2008
3.00
line sand lwr center section
Details
06-15-2008
5.00
remove tip rib hardware
Details
06-14-2008
2.00
setting up lower skin location
Details
06-13-2008
1.00
lower skin
Details
06-12-2008
3.00
secondary gear door hard points
Details
06-12-2008
2.00
lower skin
Details
05-18-2008
2.00
main pivot point landing gear
Details
05-18-2008
2.00
locate aft pivot points
Details
05-18-2008
1.00
Locate aft pivot location
Details
05-15-2008
1.00
gear spar to Tip plate angles
Details
05-14-2008
5.00
gear spar
Details
05-12-2008
2.00
gear spar locate
Details
05-12-2008
2.00
end rib plates
Details
05-10-2008
2.00
rear strap final locate
Details
05-10-2008
3.00
locate inboard end rib plates
Details
05-10-2008
1.00
locate end rib plate outboard
Details
05-10-2008
1.00
cut strap slots in outboard end rib plates
Details
05-09-2008
4.00
rear spar straps
Details
05-08-2008
4.00
rear strap blocks
Details
05-07-2008
3.00
rear strap locate /end rib install
Details
12-11-2007
0.00
notes
Details
12-11-2007
4.50
made walk way arch
Details
12-06-2007
5.00
made and installed seat pan webs
Details
12-03-2007
3.00
Glue in inboard landing gear spars
Details
12-01-2007
6.00
laminate landing gear spars
Details
11-26-2007
3.00
install itermediate rib
Details
11-22-2007
3.00
locate rear spar strap position
Details
11-20-2007
5.00
Glue in console and root ribs
Details
11-19-2007
5.00
square rear spar to wcp
Details
11-13-2007
3.00
layout and assemble
Details
11-13-2007
3.00
fit end rib to spar
Details
11-11-2007
2.00
end rib doublers
Details
11-10-2007
4.00
lay out console ribs
Details
11-09-2007
4.00
glued attach points to spars
Details
11-08-2007
1.00
seat pan cap strip lamination
Details
11-07-2007
3.00
laminate seat cap strips
Details
11-05-2007
4.00
layout and cut
Details
11-04-2007
3.00
Lay out end ribs
Details
11-04-2007
2.50
laminate center rib
Details
11-03-2007
2.50
End rib lamination
Details
10-28-2007
9.00
Center section straps and dihedral
Details
10-27-2007
8.00
center section straps/ diehidal
Details
10-26-2007
3.00
center section closing skin
Details
10-25-2007
2.00
main spar
Details
10-23-2007
1.00
main spar
Details
10-13-2007
4.00
Rear spar - bevels
Details
10-12-2007
3.00
rear spar
Details
10-11-2007
2.00
Rear spar
Details
10-10-2007
2.50
Rear spar
Details
10-09-2007
0.00
arrange for Tech Visit
Details
10-08-2007
0.00
center section spar
Details
10-04-2007
2.00
center section spar
Details
10-03-2007
3.00
ce3nter section spar
Details
10-02-2007
3.00
center section spar - glueing
Details
10-01-2007
2.00
center section spar - glueing
Details
09-30-2007
2.00
center section spar - gluing
Details
09-29-2007
4.00
center section spar - gluing
Details
09-28-2007
0.50
Center section spar
Details
09-27-2007
4.00
center section spar
Details
09-26-2007
2.00
Center section spar
Details
SITE NAVIGATION
Contact Builder
Barracuda Home
Category
# Logs
# Hours
All
626
1856
Ailerons
39
114
Center section
138
477
Empennage
81
242
Fuselage
184
529
Hardware
6
12
Landing Gear
44
158
Metal Block 1
15
15
Metal Block 1 - open
2
Metal Block 2
12
13
Metal Block 2 open i
4
Metal Block 3
5
13
Miscellaneous
9
1
Tech councilor / ins
4
10
wing outer panels
83
272
Copyright © 2001-2025 Matronics. All Rights Reserved.