Lightning N730AL Build Log
Work Logs Found: 15
Category Work Time: 62 Hours
 Date
Hours
Work Log Summary

Details

 05-16-2008
5.00
Installed Trim Tab
Details
       

 05-16-2008
5.00
Installed New Trim Tab Servo
Details
       

 04-26-2008
4.00
Installed ailerons and setup geometry
Details
       

 04-25-2008
2.00
Made up Pushrods
Details
     

 04-25-2008
2.00
Attached aileron pushrods to bellcrank
Details
       

 02-08-2008
3.00
Installed electric elevator trim motor
Details
       

 02-05-2008
2.00
Installed rudder cables
Details
       

 02-03-2008
4.00
Installed elevator pushrod
Details
       

 08-31-2007
4.00
Rudder Cable Guide Pulleys
Details
     

 08-27-2007
2.00
Rudder Pedal Supports
Details
     

 08-27-2007
4.00
Rudder flute
Details
     

 08-27-2007
8.00
Hang Rudder Pedals
Details
     

 08-27-2007
3.00
Flute Bracket
Details
     

 08-26-2007
9.00
Assemble Rudder pedals
Details
       

 08-11-2007
5.00
Assembled controls mixer
Details
     