KitLog pro

Powered By Kitlog Pro v2.0

Lightning N730AL Build Log
Work Logs Found: 11
Category Work Time: 27 Hours
 Date
Hours
Work Log Summary

Details

 06-21-2008
4.00
Recorded aircraft data
Details

 05-23-2008
2.00
Blead brake lines
Details
     

 02-16-2008
2.00
Assembled Headset box
Details
       

 02-10-2008
4.00
Connected Brake Lines
Details
       

 02-09-2008
0.00
Watched the Lightning Snack
Details
       

 01-06-2008
3.00
Installed Power Panel
Details
     

 12-29-2007
4.00
Powder coat panel
Details
     

 12-17-2007
0.00
Took a break
Details
       

 12-17-2007
4.00
Installed throttle, Carb/Cabin Heat and Choke
Details
       

 12-16-2007
0.00
Made Engine Noises
Details
       

 07-12-2007
4.00
Organization of parts
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.