Powered By Kitlog Pro v2.0
Lightning N730AL Build Log
Lightning
Engine
Work Logs Found:
20
Category Work Time:
67 Hours
Date
Hours
Work Log Summary
Details
02-09-2008
2.00
Installed Fuel Selector Valve and plate
Details
02-08-2008
1.00
Installed Key Switch
Details
01-26-2008
2.00
Tested EFIS and Thermocouples
Details
01-26-2008
5.00
Rerouted Thermocouple Wiring
Details
01-26-2008
2.00
Fit Key Switch
Details
01-12-2008
6.00
Wired thermocouples to RDAC
Details
01-12-2008
2.00
Wired oil pressure and temperature sensors
Details
01-12-2008
3.00
Mounted RDAC
Details
01-02-2008
5.00
Installed engine controls
Details
12-16-2007
2.00
Tie wrapped and ran sensor wiring
Details
12-11-2007
3.00
Installed heater box
Details
12-10-2007
4.00
Installed muffler
Details
12-09-2007
5.00
Installed Oil Cooler
Details
12-09-2007
4.00
Installed gascolator and tubing
Details
12-09-2007
4.00
Installed Fuel Flow Sensor
Details
12-09-2007
5.00
Built and installed battery bracket
Details
09-28-2007
2.00
Hang Engine
Details
09-01-2007
5.00
Installed Engine Mount
Details
08-18-2007
3.00
Cut Firewall
Details
07-01-2007
2.00
Uncrated and checked engine
Details
SITE NAVIGATION
Contact Builder
Lightning Home
Lightning Home
Category
# Logs
# Hours
All
186
798
Avionics
19
128
Body Work
3
64
Controls
15
62
Electrical
30
90
Empennage
9
46
Engine
20
67
Fuel System
2
7
Fuselage
42
167
Interior
3
6
Lighting
1
3
Miscellaneous
11
27
Paint
9
42
Planning
9
42
Prop
2
4
Wings
11
43
Copyright © 2001-2024 Matronics. All Rights Reserved.