KitLog pro

Powered By Kitlog Pro v2.0

N115AR 601XL - FOR SALE
Work Logs Found: 148
Category Work Time: 386 Hours
 Date
Hours
Work Log Summary

Details

 08-09-2009
4.00
2.- Finilized all cotter pins and safety wire
Details
     

 08-08-2009
2.00
2.- Weight and Balance Calculation
Details
       

 08-02-2009
3.00
Finished up installing safey wire
Details
       

 08-01-2009
2.00
Installed the balance cable middle fairlead
Details
       

 07-26-2009
2.00
Riveted the saddle
Details
       

 07-26-2009
2.00
Riveted the front top skin
Details
       

 07-25-2009
6.00
N #
Details
       

 07-05-2009
2.00
Foot step fairing
Details
       

 06-29-2009
6.00
Hydraulic fluid in brake lines and other
Details
     

 04-20-2009
0.00
Upholstery3
Details
       

 04-20-2009
0.00
Upholstery2
Details
       

 04-20-2009
0.00
Upholstery1
Details
       

 04-19-2009
4.00
Upholstery Completed
Details
       

 04-10-2009
1.00
Upholstery Update
Details
       

 04-07-2009
1.00
Upholstery
Details
       

 04-05-2009
4.00
Sanding and priming of the saddle
Details
       

 04-04-2009
4.00
Sanding the saddle
Details
     

 03-28-2009
4.00
Moving the Fuselage to the Upholstery Shop
Details
       

 03-27-2009
2.00
Getting ready for upholstery
Details
     

 03-21-2009
1.00
Upholstery
Details

 03-14-2009
2.00
Control Cable fairings and other stuff
Details
       

 08-23-2008
1.00
1.- Final touches on the saddle
Details
       

 08-22-2008
1.00
2.- Saddle - applying resin
Details
       

 08-22-2008
1.00
1.- Saddle - Preparing for resin
Details
       

 08-20-2008
2.00
Ready to apply the fiber glass/resin
Details
       

 08-20-2008
4.00
Creating a mold for the saddle
Details
       

 07-27-2008
1.00
1.- L angles and Z angles on top middle skin
Details
     

 07-25-2008
1.00
Installed Air Vents
Details
     

 05-12-2008
1.00
Received Spars back from Machine Shop
Details
       

 05-11-2008
3.00
Top Forward Skin
Details
       

 05-09-2008
2.00
Removed center spar
Details
       

 05-04-2008
1.00
5.-Test fit of the wing spars
Details
       

 05-04-2008
2.00
4.- Making space for the fuselage
Details
       

 05-04-2008
2.00
3.- Leaving the Womb
Details
       

 05-04-2008
2.00
2.- Installing the main spring gear
Details
       

 05-04-2008
3.00
1.- Installing main wheels
Details
       

 05-03-2008
2.00
Packing the wheel bearings
Details
       

 05-02-2008
3.00
Preparing to install the main wheels
Details
       

 04-29-2008
1.00
Drilling Main Gear Axles
Details
       

 04-28-2008
1.00
2.- Installing the Bungee Cord
Details
       

 04-28-2008
3.00
1.- Installing Front Wheel
Details
       

 04-27-2008
3.00
Fine tuning of Rudder installation & Front wheel
Details
       

 04-26-2008
2.00
Installing the Rudder
Details
       

 04-26-2008
2.00
2.- Riveting the top skins and the rest!
Details
       

 04-26-2008
6.00
1.- Getting ready to rivet the top skins
Details
       

 04-25-2008
2.00
2.- Installing turn-buckles
Details
       

 04-25-2008
1.00
1.- Installing a PVC pipe for future electical wir
Details
       

 04-25-2008
6.00
1.- Control cables (elevator)
Details
       

 04-24-2008
3.00
Preparing for Stabilizer Install
Details
       

 04-19-2008
6.00
Finished drilling the top skin/tube frames
Details
     

 04-18-2008
1.00
2.- Triming the Middle top skin for 2nd tube frame
Details
       

 04-18-2008
1.00
1.- Installing the L angle under first tube frame
Details
       

 04-17-2008
0.00
Picture moment
Details
       

 04-15-2008
2.00
Drilling the Middle top skin
Details
       

 04-14-2008
3.00
Installed First Tube Frame
Details
       

 04-13-2008
3.00
2.- Drilling the rear top skin
Details
       

 04-13-2008
3.00
1.- Installing the rear top skin
Details
       

 04-12-2008
3.00
2.- Riveted the Luggage compartment into place
Details
       

 04-12-2008
3.00
1.- Drilled the Steps in place
Details
       

 04-06-2008
4.00
Drilled the forward top longeron doublers
Details
       

 04-05-2008
2.00
2.- Flap control tubes
Details
       

 04-05-2008
4.00
1.- Installing Flap Motor and control tubes
Details
       

 04-02-2008
0.00
Time Warp !
Details
       

 04-01-2008
0.00
Photo opportunity
Details
       

 03-31-2008
3.00
Riveting the Forward Side Skins
Details
       

 03-30-2008
3.00
Joining of the Rear and Forward Fuselage
Details
       

 03-29-2008
4.00
Installing front gear push rods
Details
       

 03-28-2008
5.00
Riveted Firwall and seat back support
Details
       

 03-27-2008
5.00
Insulating the firewall and installed boots
Details
       

 03-26-2008
6.00
Continued work on brakes and cabin floor
Details
       

 03-25-2008
1.00
Installing brake pedals
Details
     

 03-24-2008
2.00
Powder coating more parts
Details
     

 03-23-2008
4.00
Riveting the forward fuselage floor/Center Spar
Details
       

 03-22-2008
4.00
2.- Riveting the Seat Back Support
Details
       

 03-21-2008
3.00
1.- Riveting the Seat Back Support
Details
       

 03-18-2008
2.00
Drilling arm rest side panels
Details
       

 03-16-2008
4.00
Wing spar attachment bolts access panels
Details
       

 03-15-2008
4.00
Riveting the luggage floor skin
Details
       

 03-09-2008
3.00
2.- Torque tube forward bearing
Details
       

 03-09-2008
3.00
1.- Drilled the wing attachments upright o/b holes
Details
       

 03-08-2008
3.00
L angles
Details
       

 03-02-2008
5.00
Drilled center seat channel & flap control mount
Details
       

 03-01-2008
3.00
Drilled the luggage floor to L angles.
Details
       

 02-23-2008
4.00
Installed L angles for Luggage Compartment
Details
       

 02-22-2008
3.00
2.- Riveting the rear fuselage
Details
       

 02-22-2008
4.00
1.- Riveting the rear fuselage
Details
       

 02-16-2008
4.00
Bottom Fuselage Access Door
Details
       

 02-15-2008
3.00
Running out of Clecos!
Details
       

 02-10-2008
6.00
Side skin L angles and seat supports
Details
       

 02-06-2008
1.00
Drilled the Wing Attachment Uprights
Details
       

 02-03-2008
3.00
Drilled Bulkheads
       

 02-02-2008
3.00
Drilled Uprights
Details
       

 02-01-2008
3.00
Side skins
Details
       

 01-31-2008
1.00
Installed Instrument Panel
Details
       

 01-27-2008
3.00
Installing the back channel
Details
       

 01-26-2008
4.00
Drilling the firewall to the cabin floor
Details
       

 01-25-2008
2.00
Joining the Cabin floor and the center fuselage
Details
       

 01-23-2008
3.00
Cabin Floor and Center Spar
Details
       

 01-22-2008
3.00
Cabin Floor
Details
       

 01-21-2008
3.00
Firewall riveting
Details
       

 01-20-2008
4.00
Upper and Lower bearings
Details
       

 01-19-2008
3.00
Fixing boboo
Details
       

 01-18-2008
3.00
Solution to the problem
Details
       

 01-17-2008
1.00
Boboo !
Details
       

 01-16-2008
3.00
Upper bearing
Details
       

 01-15-2008
2.00
Continued work on Firewall
Details
       

 01-13-2008
5.00
Drilled upper engine mounts.
Details
       

 01-12-2008
4.00
Firewall Center Channel
Details
       

 01-11-2008
3.00
Drilled Gear Channel and seat support
Details
       

 01-05-2008
4.00
HT attachment brackets and cable fairing
Details
       

 01-04-2008
2.00
Drilling rear panel top
Details
       

 01-03-2008
2.00
Drilled the bottom longeron to side skins
Details
       

 01-01-2008
5.00
Rear fuselage side skins assembly
Details
       

 12-31-2007
2.00
Riveted the Rear Fuselage Bottom Skin
Details
       

 12-31-2007
1.00
Rear Fuselage Access Door
Details
       

 12-31-2007
2.00
Continued work on rear fuselage floor
Details
       

 12-30-2007
3.00
Fuselage rear floor - L and Z angles
Details
       

 12-30-2007
2.00
Bottom Rudder Hinge
Details
       

 12-29-2007
0.00
Zenith parts shipment arrives
Details
       

 12-28-2007
2.00
START of Assembly
Details
       

 12-26-2007
2.00
Fuselage access door
Details
       

 12-26-2007
3.00
Fabricated L angles
Details
       

 12-21-2007
3.00
Center Channel Support
Details
       

 12-21-2007
3.00
Arm rest and Center Console
Details
       

 12-19-2007
1.00
Gusset
Details
       

 12-18-2007
1.00
Seat back side channel
Details
     

 12-16-2007
3.00
2.- Lower Bearing Support
Details
       

 12-16-2007
3.00
1.- Cabin Floor & Rear, Middle Top Skins
Details
       

 12-15-2007
3.00
Fuselage Rear Side Skins
Details
       

 12-09-2007
1.00
3.- Cut Rear panel (top)
Details
     

 12-09-2007
2.00
2.- Forming the Instrument Panel
Details
       

 12-09-2007
2.00
1.- Forming the Instrument Panel
Details
       

 12-08-2007
3.00
Bulkhead Lightening holes
Details
     

 12-02-2007
3.00
Baggage Back Bulkhead
Details
       

 12-01-2007
3.00
Middle Bulkhead
Details
       

 11-25-2007
0.00
2.- Forming Aft bulkhead
Details
       

 11-25-2007
3.00
1.- Forming Aft bulkhead
Details
       

 11-24-2007
2.00
Fuselage bottom skin
Details
     

 11-23-2007
1.00
Preparing to cut Fuselage floor skin
Details
       

 11-10-2007
3.00
making more 032 parts
     

 10-28-2007
4.00
Fabrication of .032 parts
Details
     

 10-21-2007
1.00
Wing attachment doublers
Details
       

 10-20-2007
2.00
Firewall Stiffener Doubler
Details
       

 10-16-2007
1.00
Firewall top Stiffener (front)
       

 10-05-2007
1.00
Firewall Bottom Stiffener
Details
     

 10-02-2007
2.00
More .040" parts
Details
     

 09-29-2007
4.00
Many Small Parts 0.040
Details
       

 09-23-2007
4.00
Longeron Doublers
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.