KitLog pro

Powered By Kitlog Pro v2.0

Carl Bells RV7A N947CB
Work Logs Found: 42
Category Work Time: 211 Hours
 Date
Hours
Work Log Summary

Details

 05-03-2010
3.00
Installing the flaps
Details
       

 05-03-2010
2.50
Bleeding the brakes
Details
       

 12-14-2009
5.00
Rudder pedal to firewall brake lines
Details
       

 12-11-2009
4.00
Brake line adjustments to fit in fairings
Details
       

 12-10-2009
5.00
Hooking up the elevator push tube
Details
       

 12-10-2009
3.00
Better rudder push pull bar #2
Details
       

 12-09-2009
5.00
Better rudder push-pull
Details
       

 02-09-2009
7.00
Flap positioning system controller
Details
       

 07-11-2008
5.00
Installation of throttle cable
Details
       

 07-08-2008
5.00
Cabin heater control cable
Details
       

 06-20-2008
6.00
Firewall forward kit inventory and cabin heat valv
Details
       

 06-11-2008
4.00
Final mounting of rudder pedals and control cables
Details
       

 06-09-2008
4.00
Last of the brake work until the wheels go on
Details
       

 06-09-2008
4.00
Even more brake lines work
Details
       

 06-06-2008
6.00
More brake work-running central brake lines
Details
       

 06-02-2008
6.00
Brake lines
Details
       

 05-21-2008
6.00
Final installation of the contol sticks
Details
       

 05-05-2008
2.00
Special way to add a nut plate without more holes
Details
       

 04-03-2008
2.00
Pushtubes and canopy slide rails
Details
       

 03-14-2008
5.00
More hand brakes work
Details
       

 03-12-2008
5.00
Hand brakes
Details
       

 03-07-2008
9.00
High pressure fuel injection pump
Details
       

 02-25-2008
4.00
More work on the push tubes and ailerons
Details
       

 02-18-2008
3.00
Flap linkage installation
Details
       

 01-09-2008
3.00
Aileron trim hookup
Details
       

 12-21-2007
6.00
Mounting the brake pedals
Details
       

 12-19-2007
3.00
Mounted the CH stick grips &
Details
     

 12-17-2007
3.00
Rudder cable and elevator contol hook up
Details
       

 12-12-2007
7.00
Rudder cable installation
Details
       

 11-14-2007
6.00
Aileron electric trim build and install
Details
       

 10-31-2007
7.00
Elevator push tubes
Details
       

 10-28-2007
4.00
Mounting the handbarkes
Details
     

 10-27-2007
4.00
Push-pull control for the rudder
Details
       

 10-26-2007
7.50
Control stick assembly
Details
       

 10-20-2007
4.00
Installing flap motor frame and skins
Details
     

 10-17-2007
6.00
Electric Flap Installation
Details
       

 10-08-2007
7.00
Push-pull rudder system
Details
       

 09-28-2007
7.00
Miscellaneous stuff
Details
       

 09-27-2007
5.50
Designing and building push-pull rudder system
Details
     

 09-26-2007
6.50
Elevator belcrank
Details
     

 09-18-2007
6.00
Brake Pedal Build
Details
       

 09-17-2007
8.00
Mounting the rudder peddles
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.