Powered By Kitlog Pro v2.0
Erik Builds a Little Wing
LW-5
Fuselage
Work Logs Found:
59
Category Work Time:
152 Hours
Date
Hours
Work Log Summary
Details
10-01-2008
2.50
Finish welded 5 easy clusters.
Details
09-30-2008
2.00
Finish welding clusters.
Details
09-29-2008
2.50
Finish welding clusters.
Details
09-27-2008
2.00
Finish welding clusters.
Details
09-26-2008
1.00
Finish welding clusters.
Details
09-25-2008
1.50
Finish welding clusters.
Details
09-23-2008
2.50
2 Clusters finish welded.
09-22-2008
2.00
1 Cluster finish welded.
09-21-2008
2.00
Finish weld clusters.
Details
09-20-2008
2.00
Finish weld clusters.
09-19-2008
2.50
Finish weld clusters.
09-16-2008
1.00
Finish weld clusters
Details
09-15-2008
1.50
Finish weld clusters
Details
09-14-2008
1.50
Finish weld clusters
Details
09-06-2008
1.00
Finish welded a couple clusters
Details
07-21-2008
4.50
COCKPIT OVHD DIAGONAL MEMBERS
Details
07-18-2008
4.00
Cockpit upper bracing (misc)
Details
07-17-2008
2.50
Rear SEATBACK / BRACES finished.
Details
07-15-2008
2.00
Shaped and fitted AFT SEAT BACK TUBE.
Details
07-15-2008
2.00
COCKPIT OVHD misc members
Details
07-14-2008
1.50
Broke tack-welds and redid parts of OVHD
Details
07-13-2008
3.50
Cockpit OVHD FORE/AFT MEMBERS (2)
Details
07-08-2008
3.00
Windshield tubes
Details
07-07-2008
3.50
Windshield tubes
Details
07-06-2008
2.00
ROTOR MAST CROSS-MEMBER rework
Details
05-07-2008
0.50
Main ROTOR MAST CROSS-MEMBER again
Details
05-07-2008
2.00
Fit Main ROTOR MAST CROSS-MEMBER
Details
04-28-2008
1.00
Cut FWD VERT MBRS & FWD UPR CROSS-MBR
Details
04-22-2008
2.50
More FLR/FRWL DIAGONALS fitted/tacked
Details
04-20-2008
2.00
Fit / weld UPR FUEL BAY DIAG tubes.
Details
04-19-2008
1.50
Cut/ fit weld INSTR PNL clusters
Details
04-15-2008
2.00
INSTR PNL MEMBER bracing
Details
04-14-2008
2.00
INSTR PNL MEMBER bracing
Details
04-12-2008
1.50
Fitting FUEL BAY UPR DIAGONALS.
Details
04-09-2008
3.50
Replaced Lwr firewall tubes
Details
02-14-2008
2.50
Tacked firewall vertical members
Details
02-13-2008
1.50
Cut/fishmouthed firewall vertical members
Details
11-10-2007
3.00
Firewall & fwd fuse framing
Details
11-06-2007
7.00
Fwd fuselage alignment / tacking
Details
10-09-2007
2.50
Fuselage aft fairing arc
Details
10-08-2007
3.00
Shaping upper longerons (nose)
Details
10-04-2007
2.50
Aft fuse side .250 diagonals
Details
09-29-2007
5.00
Cut, Fit, Weld aft fuselage roll-cage structure
Details
09-28-2007
2.00
Re-did Sta82 frame.
Details
09-27-2007
3.00
Final fit & tack weld of Sta82 rollcage
Details
09-24-2007
3.00
bring together aft fuse and join LH to RH longeron
Details
09-23-2007
3.00
Squared upper fuse sides and joined top.
Details
09-21-2007
3.50
Measure, measure, cut measure vertical posts
Details
09-18-2007
3.00
Squaring, Leveling and adjusting fuselage
Details
09-17-2007
1.00
Cut & fit one diag crossmember
Details
09-16-2007
3.00
Cut, fit, tack fuselage bottom diagonals
Details
09-15-2007
4.00
Cut & fit fuse bottom diagonals
Details
09-13-2007
3.00
Fitted aft fuse bay tubes
Details
09-12-2007
2.00
More fuse tube fitting
Details
09-10-2007
1.50
Fitted aft fuse cross-tubes
Details
09-09-2007
2.00
Square Cross-brace tube
Details
09-03-2007
3.00
Installed fuselage deck members.
Details
08-20-2007
8.00
Cut and clamped tubes on jig.
Details
08-13-2007
6.00
Drew Fuse side on Building Board.
Details
SITE NAVIGATION
Contact Builder
LW-5 Home
Category
# Logs
# Hours
All
74
208
Details
3
0
Empennage
2
5
Fuselage
59
152
Miscellaneous
3
4
None
2
0
Shop Supplies
1
40
Tools
4
7
Copyright © 2001-2024 Matronics. All Rights Reserved.