John & Martha RV-9A
RV-9A
Fuselage
Work Logs Found:
77
Category Work Time:
178 Hours
Date
Hours
Work Log Summary
Details
07-31-2010
4.00
Rudder bottom
Details
05-08-2010
1.00
Little helper
Details
02-27-2010
2.00
Air vents
Details
02-20-2010
2.00
Cabin air vents
Details
01-31-2010
3.00
Secure brake lines
Details
01-23-2010
3.00
Installed brake lines
Details
01-09-2010
2.00
Landing gear mount bolt changes
Details
09-12-2009
3.00
Rudder cable fairings
Details
08-29-2009
4.00
Fitting the foward top skin
Details
08-09-2009
3.00
Fitting the foward top skin (continued)
Details
08-08-2009
2.00
Fitting the foward top skin (continued)
Details
07-03-2009
3.00
Fitting the foward top skin
Details
05-03-2009
3.00
Instrument and sub panel
Details
05-02-2009
3.00
Match drilled front deck
Details
03-01-2009
4.00
Front deck and sub-panel
Details
02-28-2009
4.00
Installing the front deck for slider canopy.
Details
01-20-2009
2.00
Fitting the foward top skin
Details
01-10-2009
2.00
Auto pilot pitch servo
Details
01-04-2009
1.00
Shoulder harness cables
Details
01-03-2009
2.00
Rudder cables
Details
11-11-2008
2.00
Tail mounting complete
11-10-2008
3.00
Mounting the vertical stabilizer
Details
11-09-2008
1.00
Rudder stops in place
Details
11-08-2008
3.00
Rudder stops
Details
10-21-2008
2.00
Fitting the rudder
Details
10-04-2008
2.00
Fitting the vertical stabilizer
Details
09-27-2008
5.00
Corrected F-912D
Details
09-14-2008
2.00
Up/down elevator travel limits
Details
09-13-2008
1.00
Made the F-912D Elevator stop
Details
09-13-2008
3.00
Installing the elevator pushrod
Details
09-06-2008
2.00
Fitting the HS
Details
08-12-2008
2.00
Fitting the empennage continued
Details
08-11-2008
2.00
Fitting the empennage continued
Details
08-10-2008
2.00
Fitting the empennage continued
Details
08-09-2008
2.00
Fitting the empennage
Details
05-18-2008
2.00
Step installation, left side complete
Details
05-18-2008
3.00
Step installation continued
Details
05-10-2008
3.00
Step installation
Details
04-23-2008
2.00
Fuel vent lines completed
Details
04-22-2008
5.00
Fuel vent lines
Details
04-20-2008
1.00
Fuel vents
Details
04-13-2008
2.00
Landing gear weldment complete
Details
04-12-2008
3.00
Landing gear weldment continued
Details
03-09-2008
2.00
Landing gear weldment continued
Details
03-08-2008
3.00
Landing gear weldment
Details
03-02-2008
2.00
Andair fuel selector valve completed
Details
03-01-2008
2.00
Andair fuel selector valve
Details
02-23-2008
3.00
Center section cover
Details
02-02-2008
2.00
Center tunnel cover
Details
01-27-2008
1.00
F-6114B&C cable wear blocks
Details
01-26-2008
1.00
F-712 bulkhead complete
Details
01-20-2008
1.00
F-712 bulkhead continued
Details
01-19-2008
2.00
F-712E tiedown
Details
12-31-2007
3.00
Parking brake valve bracket
Details
12-23-2007
2.00
Flap actuator installation complete
12-22-2007
2.00
Flap actuator installation
12-11-2007
2.00
F-635 elevator bellcrank
Details
12-08-2007
2.00
Control stick
Details
11-25-2007
2.00
Static lines continued
Details
11-24-2007
4.00
Static lines
Details
11-18-2007
2.00
Locating the rudder pedals
Details
11-17-2007
3.00
Rudder/brake pedals completed
Details
10-21-2007
3.00
Brake pedals
Details
10-17-2007
1.00
F-757 gusset
Details
10-17-2007
1.00
705 bulkhead is in place
Details
10-16-2007
1.00
Baggage floor platenut installed
Details
10-06-2007
6.00
Baggage floor
Details
09-29-2007
2.00
F-705 seat back supports
Details
09-23-2007
2.00
More work on the 705 bulkhead
Details
09-22-2007
3.00
Fuselage support
Details
09-19-2007
1.00
Removed F-705G angles
Details
09-19-2007
1.00
Flap bearing blocks
Details
09-17-2007
2.00
Bolt bolt torque checks
Details
09-16-2007
3.00
F-705 bulkhead inspection
Details
09-10-2007
1.00
F-904 bulkhead inspection
Details
09-10-2007
1.00
Cleanup and inspection
Details
09-09-2007
1.00
Start the fuselage
Details
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
210
599
Canopy
29
128
Empennage
56
198
Firewall Foward
1
4
Fuselage
77
178
Miscellaneous
4
9
Tools
1
1
Wings
42
81