Powered By Kitlog Pro v2.0
James Vans RV4 Project
RV4
Empennage
Work Logs Found:
35
Category Work Time:
148 Hours
Date
Hours
Work Log Summary
Details
09-29-2008
4.50
Marking and stiffener preparation (left elevator)
Details
09-28-2008
4.00
Right Elevator stiffener prep / drill
Details
09-16-2008
3.25
Right Elevator skin - marking and stiffeners
Details
09-16-2008
2.00
Assemble Rudder Skeleton
Details
09-15-2008
0.50
Re-assembly
Details
09-14-2008
3.00
Refabrication of R-405
Details
08-29-2008
3.00
Rivet stiffeners to rudder skin.
Details
12-09-2007
4.50
Priming and elevator ink layouts
Details
12-04-2007
2.75
Metal Prep.
Details
11-24-2007
5.00
Paint Booth etc.
Details
11-23-2007
4.00
Replacement Part
Details
11-13-2007
3.00
loose ends...
Details
11-11-2007
4.00
Work continues on VS and rudder assemblies
Details
11-10-2007
8.75
Work continues on VS and rudder assemblies
Details
11-09-2007
9.25
Work on VS and Rudder
Details
11-05-2007
1.65
Marking rudder skin
Details
11-04-2007
6.00
Continued work on HS, VS and jigs
Details
10-28-2007
6.00
VS Construction
Details
10-27-2007
4.00
Building Vertical Spar
Details
10-20-2007
0.50
Dimpling of HS skeleton
Details
09-04-2007
6.50
Building the Vertical Stabilizer Rear Spar
Details
08-27-2007
6.50
Skinning of the Horizontal Stabilizer
Details
08-26-2007
7.25
Skinning of the Horizontal Stabilizer
Details
08-25-2007
7.75
Skinning of the Horizontal Stabilizer
Details
08-08-2007
3.50
Mount HS skeleton in jig
Details
08-08-2007
2.25
Fabrication of VS-408
Details
08-01-2007
1.75
Complete riveting of ribs to HS spars
Details
07-31-2007
7.75
Attach ribs to the HS spars
Details
07-26-2007
4.50
Deburr and smooth HS ribs
Details
07-04-2007
9.00
Details
04-10-2007
1.25
Details
03-27-2007
2.50
Details
03-24-2007
7.50
Preparation of flange strips
Details
02-01-2007
0.00
Inventory
Details
11-15-2006
0.00
Arrival
Details
SITE NAVIGATION
Contact Builder
RV4 Home
Category
# Logs
# Hours
All
37
153
Empennage
35
148
Tools
1
5
Wings
1
0
Copyright © 2001-2024 Matronics. All Rights Reserved.