Date
|
Hours
|
Work Log Summary
|
Details
|
07-10-2012
|
0.00
|
XeVision HID and Balast on Duckworks Mount
|
Details
|
|
|
01-11-2012
|
0.50
|
Trace Whelen Base onto Left Wing Tip
|
Details
|
|
|
01-11-2012
|
1.00
|
Left Wing Tip - Cutout for Whelen Position Light
|
Details
|
|
|
01-10-2012
|
0.50
|
Trace Whelen Base onto Right Wing Tip
|
Details
|
|
|
01-10-2012
|
1.00
|
Right Wing Tip - Cutout for Whelen Position Light
|
Details
|
|
|
01-10-2012
|
0.50
|
Disassemble Whelen Position Light
|
Details
|
|
|
12-07-2010
|
0.50
|
Wire Fuel Flow Sensor
|
Details
|
|
|
11-15-2010
|
1.00
|
Secure More Wires in Engine Compartment
|
Details
|
|
|
10-24-2010
|
1.00
|
Secure #2 & #4 Cyl EGT & CHT Wires
|
Details
|
|
|
10-24-2010
|
1.00
|
Secure #2 & #4 Cyl EGT & CHT Wires
|
Details
|
|
|
10-24-2010
|
1.00
|
Secure #1 & #3 Cyl EGT & CHT Wires
|
Details
|
|
|
10-24-2010
|
1.00
|
Secure #1 & #3 Cyl EGT & CHT Wires
|
Details
|
|
|
05-12-2009
|
0.50
|
Remove Forrest of Ground Tabs - Engine Side
|
Details
|
|
|
10-25-2007
|
1.00
|
Ground Whelen Shields, Route Power/Ground Wires
|
Details
|
|
|
10-24-2007
|
0.50
|
Connect Strobe Wires from Wings to Power Supply
|
Details
|
|
|
10-21-2007
|
0.50
|
Test and Reverse Aileron Trim Wiring
|
Details
|
|
|
10-21-2007
|
2.50
|
Complete Trim Relay and Indicator Wiring
|
Details
|
|
|
10-17-2007
|
0.50
|
Install Male Pins on Trim/Stick Cables
|
Details
|
|
|
10-15-2007
|
0.50
|
Switch GMA-340 Power from E-Buss to Main Buss
|
Details
|
|
|
10-11-2007
|
0.50
|
Reinstall SL40 & Test - Works - Rx & Tx!
|
Details
|
|
|
10-06-2007
|
0.50
|
Straighten #9 Pin on J1 GMA-340 Connector
|
Details
|
|
|
10-06-2007
|
1.00
|
Re-Route Battery Buss Wires
|
Details
|
|
|
10-06-2007
|
1.00
|
Re-Route 2 Wires to Main Buss
|
Details
|
|
|
10-05-2007
|
0.50
|
Found Problem with Audio (Receiving)
|
Details
|
|
|
10-02-2007
|
1.50
|
Install Ray Allen Relays on Sub Panel
|
Details
|
|
|
09-11-2007
|
1.00
|
Join Stick Wires to Cable Running to Sub Panel
|
Details
|
|
|
09-11-2007
|
0.50
|
Install BNC Connector on RG400 to Com Antenna
|
Details
|
|
|
09-06-2007
|
0.50
|
Install Spherical Washers on CoPilot Stick
|
Details
|
|
|
09-05-2007
|
1.50
|
Crimp D Sub Pins onto Stick Wires
|
Details
|
|
|
09-03-2007
|
0.50
|
Route Wing Strobe Wires thru Fuselage Conduit
|
Details
|
|
|
09-03-2007
|
1.50
|
Connect Aileron Trim Wires to Sub-Panel Cable
|
Details
|
|
|
09-02-2007
|
1.00
|
Install Ray Allen G205 Stick Grips
|
Details
|
|
|
09-01-2007
|
1.50
|
Drill 3/8 Holes in Sticks for Wiring; Secure Stick
|
Details
|
|
|
08-31-2007
|
0.50
|
Run Strobe Wires from Power Supply Out to Wings
|
Details
|
|
|
08-31-2007
|
1.00
|
Repeat for Mic, Phones, and Remote Compass
|
Details
|
|
|
08-31-2007
|
0.50
|
Cut / Debur Control Sticks
|
Details
|
|
|
08-31-2007
|
0.50
|
Connect Tail Strobe Wire to Whelen Power Supply
|
Details
|
|
|
08-31-2007
|
0.50
|
Connect Pilot Phones to Harness Pigtail
|
Details
|
|
|
08-30-2007
|
2.00
|
Wire Flap Position Module and Test
|
Details
|
|
|
08-29-2007
|
1.00
|
Route Wire for Tail Strobe and Elevator Trim
|
Details
|
|
|
08-29-2007
|
1.00
|
Route Flap Power, Ground, Extend, Retract Wires
|
Details
|
|
|
08-28-2007
|
1.00
|
Finish Wiring Dynon Remote Compass / OAT
|
Details
|
|
|
08-27-2007
|
0.50
|
Partially Wire a 9-Pin D-Sub for Dynon Remote Comp
|
Details
|
|
|
08-27-2007
|
0.50
|
Install Headset Jacks and Route Wires
|
Details
|
|
|
08-27-2007
|
0.50
|
Install Dynon OAT - Outside Air Temp Probe
|
Details
|
|
|
08-27-2007
|
1.00
|
Install Click Bond Tie Wrap Mounts
|
Details
|
|
|
08-27-2007
|
0.50
|
Drill Hole in F-705 Bulkhead for Wires
|
Details
|
|
|
08-20-2007
|
0.50
|
Install Fiberglass Sleeve Around RAC Grip Wires
|
Details
|
|
|
08-18-2007
|
1.00
|
Solder Second Ray Allen G205 Stick Grip
|
Details
|
|
|
08-15-2007
|
1.00
|
Solder First Ray Allen G205 Stick Grip
|
Details
|
|
|
08-05-2007
|
1.50
|
Solder Shielded Wire to Headset Jacks
|
Details
|
|
|
08-05-2007
|
0.50
|
Drill Holes for Wires in Sub-Panel/Support Channel
|
Details
|
|
|
08-04-2007
|
1.00
|
Wire Power and Ground Leads for Trutrak ADI
|
Details
|
|
|
07-31-2007
|
1.00
|
Install Trutrak ADI in Panel
|
Details
|
|
|
07-14-2007
|
0.50
|
Rivet Brackets for Headset Jacks to Fuselage
|
Details
|
|
|
07-14-2007
|
0.50
|
Install GMA340 J1 & J2 Harnesses / Backplate
|
Details
|
|
|
07-14-2007
|
1.00
|
Fabricate Brackets for Headset Jacks
|
Details
|
|
|
07-08-2007
|
2.00
|
Rivet ELT & Whelen Power Supply Brackets
|
Details
|
|
|
07-07-2007
|
1.00
|
Drill ELT & Whelen Power Supply Brackets to Fusela
|
Details
|
|
|
07-05-2007
|
1.00
|
Connect J2 Harness to GMA-340 Backplate - Audio
|
Details
|
|
|
07-04-2007
|
1.50
|
Install GTX-327 Transponder Backplate
|
Details
|
|
|
07-03-2007
|
1.00
|
Screw SL40 Backplate to Tray; Install Antenna
|
Details
|
|
|
07-03-2007
|
0.50
|
Install RG400 to GTX-327 Backplate
|
Details
|
|
|
07-03-2007
|
0.50
|
Install Dynon EDC-D10A Remote Compass
|
Details
|
|
|
07-01-2007
|
1.00
|
Install RG400 and Harness to SL40 Backplate
|
Details
|
|
|
06-30-2007
|
1.00
|
Fabricate Bracket for Dynon EDC-D10A - Compass
|
Details
|
|
|
06-30-2007
|
1.00
|
Drill EDC-D10A Bracket to Vertical Baggage Support
|
Details
|
|
|
06-29-2007
|
1.00
|
Wire Falcon Turn Coordinator
|
Details
|
|
|
06-28-2007
|
0.50
|
Install Transponder Antenna
|
Details
|
|
|
06-28-2007
|
1.50
|
Drill Fuselage for Comant Bent Whip Antenna
|
Details
|
|
|
06-24-2007
|
0.50
|
Install 9-Pin D-Sub on EFIS Remote Compass Wires
|
Details
|
|
|
06-24-2007
|
0.50
|
Connect Dynon EMS and EFIS DSAB's Together
|
Details
|
|
|
06-21-2007
|
1.00
|
Wire Dynon EFIS / EMS Together - DSAB
|
Details
|
|
|
06-19-2007
|
0.50
|
Power Up the Dynon EFIS and EMS Units
|
Details
|
|
|
06-19-2007
|
1.00
|
Install and Wire Manifold Pressure Sensor
|
Details
|
|
|
06-18-2007
|
0.50
|
Wire Tach Pick-up's From P-Leads
|
Details
|
|
|
06-18-2007
|
0.50
|
Wire Carb Temp Sensor to Dynon EMS
|
Details
|
|
|
06-16-2007
|
1.50
|
Wire #1/3 EGT and CHT Probes to Dynon EMS
|
Details
|
|
|
06-13-2007
|
1.00
|
Wire #2/4 EGT and CHT Probes to Dynon EMS
|
Details
|
|
|
06-13-2007
|
0.50
|
Connect Fusible Links to Ammeter Shunt
|
Details
|
|
|
06-13-2007
|
0.50
|
Bundle/Route #2&4 EGT, CHT, Carb Temp Wires
|
Details
|
|
|
06-11-2007
|
0.50
|
Wire Oil/Fuel Pressure and Oil Temp Senders
|
Details
|
|
|
06-11-2007
|
0.50
|
Connect Dynon EFIS & EMS Power / Grounds
|
Details
|
|
|
06-07-2007
|
0.50
|
Wire Dynon EFIS Keep-Alive/Ground Leads
|
Details
|
|
|
06-07-2007
|
0.50
|
Install New 1/4" Ring Terminal on Positive Lead
|
Details
|
|
|
06-07-2007
|
0.50
|
Install New 1/4" Ring Terminal on Ground Lead
|
Details
|
|
|
06-04-2007
|
0.50
|
Wire Starter Contactor to Ignition Switch
|
Details
|
|
|
06-04-2007
|
0.50
|
Enlarge J1/J2 Slots in Sub Panel For Audio Cables
|
Details
|
|
|
06-02-2007
|
0.50
|
Wire the Battery Buss - 14 AWG
|
Details
|
|
|
06-02-2007
|
1.50
|
Wire Fusible Link & E-Buss Alternate Feed Switch
|
Details
|
|
|
06-01-2007
|
1.00
|
18AWG from Volt Reg to Breaker to Master
|
Details
|
|
|
05-31-2007
|
0.75
|
Wire Battery Contactor Portion of Master Switch
|
Details
|
|
|
05-31-2007
|
0.25
|
Test Master Switch / Battery Contactor
|
Details
|
|
|
05-30-2007
|
0.50
|
Run 14AWG from Main to Diode to E-Buss
|
Details
|
|
|
05-30-2007
|
0.50
|
Fabricate 6 AWG Power Cable for Main Buss
|
Details
|
|
|
05-30-2007
|
0.50
|
Connect 6AWG from Bat Relay to Main Buss
|
Details
|
|
|
05-28-2007
|
0.50
|
Install P-Lead's / Grounds to Ignition Switch
|
Details
|
|
|
05-28-2007
|
0.50
|
Connect Wires for Low-Voltage Warning Lamp
|
Details
|
|
|
05-28-2007
|
0.50
|
Connect Right P-Lead / Ground to Right Mag
|
Details
|
|
|
05-28-2007
|
0.50
|
Connect Left P-Lead / Ground to Left Mag
|
Details
|
|
|
05-27-2007
|
0.50
|
Install Solder Sleeve's on P-Leads
|
Details
|
|
|
05-27-2007
|
0.50
|
Install 2 awg Battery + Lead to Master Relay
|
Details
|
|
|
05-27-2007
|
1.00
|
Drill Holes in Firewall for Wires; Install Alt Fld
|
Details
|
|
|
05-26-2007
|
1.50
|
Install Shunt and 60amp Current Limiter
|
Details
|
|
|
05-26-2007
|
0.50
|
Install Insulator Boots on Starter and Alternator
|
Details
|
|
|
05-18-2007
|
1.00
|
Install 18awg Alternator Field Wire
|
Details
|
|
|
05-17-2007
|
1.00
|
Install Voltage Regulator - B&C LR3C
|
Details
|
|
|
05-12-2007
|
0.50
|
Secure Alternator B-Lead with Adel Clamps
|
Details
|
|
|
05-12-2007
|
1.00
|
Install Dynon Ammeter Shunt
|
Details
|
|
|
05-12-2007
|
0.50
|
Fabricate 4 AWG Alternator B-Lead
|
Details
|
|
|
05-12-2007
|
0.50
|
Bolt 4 AWG B-Lead to Shunt and Alternator
|
Details
|
|
|
03-31-2007
|
0.50
|
Install Braided Engine Grounding Strap
|
Details
|
|
|
03-24-2007
|
0.50
|
Secure P14 2 AWG Starter Wire with Adel Clamps
|
Details
|
|
|
03-24-2007
|
0.50
|
Secure P14 2 AWG Starter Wire with Adel Clamps
|
Details
|
|
|
03-23-2007
|
1.00
|
Install P14 2 AWG to Starter and Contactor
|
Details
|
|
|
06-23-2006
|
0.75
|
Connect Master/Starter Relays with Copper Bars
|
Details
|
|
|
06-20-2006
|
0.25
|
Install Spike Catching Diodes on Relays
|
Details
|
|
|
06-13-2006
|
1.00
|
Install Battery Tray, Battery, and Relays
|
Details
|
|
|
05-31-2006
|
1.00
|
Drill/Install Ground Tabs
|
Details
|
|
|
05-31-2006
|
2.00
|
Drill/Cleco Busses, Approach Sys Hub, Diode
|
Details
|
|