KitLog pro

Powered By Kitlog Pro v2.0

RVGator
Work Logs Found: 255
Category Work Time: 764 Hours
 Date
Hours
Work Log Summary

Details

 08-25-2012
8.50
1. Made new baggage door
Details
       

 08-01-2012
4.50
2. Riveted on floor.
Details
       

 07-23-2012
1.75
2. Tail Inspection Covers
Details
       

 07-19-2012
3.25
2. See thru Tail Inspectoin cover
Details
       

 07-10-2012
2.00
Riveted on step
Details
       

 06-22-2012
3.25
Riveted F804 Caps
Details
       

 04-09-2012
3.75
Drilled bag door hinge Lock and Latch
Details
       

 04-07-2012
1.00
Riveted door inner skin
Details
       

 04-05-2012
1.00
2. Prosealed baggage door
Details
       

 03-23-2012
0.50
Part 2 Alt Static handle
Details
       

 03-22-2012
3.00
Installed (L) side Cherry rivets
Details
       

 03-21-2012
2.50
Painted Dash
Details
       

 03-20-2012
3.75
Riveted Top Skin longeron rivets
Details
       

 03-16-2012
1.75
Fitting baggage door
Details
       

 03-15-2012
5.50
Started to rivet boot cowl
Details
       

 03-14-2012
2.25
Installed Alt Air Cable
Details
       

 03-13-2012
1.00
Rivet side skin support
Details
     

 03-12-2012
4.25
Prepare to rivet boot cowl
Details
       

 03-11-2012
2.00
Air hose work
Details
       

 02-07-2012
1.50
Part 3 Left tank fuel line
Details
       

 01-28-2012
0.25
2. Painted underside of glare shield
Details
     

 01-12-2012
2.25
1: Installed brake valve - tested (L) master
Details
     

 01-11-2012
1.25
2: Tested (R) Master and Park Valve for leaks
Details
     

 01-01-2012
1.00
2: Redo master cylinder fittings
Details
     

 12-30-2011
0.50
Fitting into brake valve
     

 12-23-2011
1.25
Parking brake valve assembly
Details
       

 12-22-2011
5.50
Parking brake knob and fit
Details
       

 12-20-2011
3.00
Fabricating parking brake bracket
Details
       

 12-19-2011
0.75
Drilled out F866-D
Details
       

 12-17-2011
1.75
Parking Brake bracket
Details

 10-10-2011
0.50
2. Defrost, Equipment cooling
Details

 07-15-2011
4.00
Check valve bracket
Details
       

 07-14-2011
2.25
1. Purge line Check Valve
Details
       

 07-13-2011
6.00
Drilled anchor block and rollers
Details
       

 07-09-2011
1.00
2. Paint NACA vent and air vent cover
Details
       

 07-06-2011
0.75
2. Installed front NACA vent
Details
       

 05-02-2011
2.00
Started to polish canopy tracks
Details
     

 04-26-2011
1.75
Installed nose gear
Details
       

 04-25-2011
3.00
Main tires, nose gear leg
Details
       

 04-24-2011
1.50
Installed main gear legs
Details
       

 04-24-2011
3.00
Drilled mains for cotter pin
Details
       

 04-23-2011
1.00
Packed wheel bearings
Details
     

 04-23-2011
4.50
Installed eyeball pass throughs
Details
       

 04-21-2011
4.00
Fit main wheels and brakes
Details
       

 04-20-2011
2.75
Set fork breakout - started mains
Details
       

 04-19-2011
1.25
Installed nose gear flange and fork
Details
     

 04-18-2011
2.75
Drilled nose gear leg
       

 04-14-2011
0.50
Heat valve control cable
Details
     

 03-27-2011
6.00
Part 1: Finished heat vent
Details
       

 03-26-2011
5.75
Made heat vent bracket
Details
       

 03-25-2011
0.50
Part 2: Heat vent bracket
Details
     

 03-20-2011
2.50
2. Landing gear prep
Details

 03-16-2011
2.75
Heat Valve, trim speed switch
Details
       

 01-30-2011
2.00
Finished hard AOA/Pitot lines
Details
       

 01-29-2011
1.50
Flared Pitot/AOA tubes
Details

 01-16-2011
0.75
Flared pitot/AOA lines
Details
     

 12-14-2010
2.75
Part 1: Front floor modification
Details
     

 11-09-2010
5.25
Rear control cover con't
Details
       

 11-08-2010
3.25
More Aft Control Cover
Details
       

 11-07-2010
3.00
Build first part of rear control cover
Details
       

 11-06-2010
6.00
Rear Control Cover con't
Details
       

 11-04-2010
1.50
New rear stick
Details
     

 11-03-2010
1.00
Rear control cover
Details
     

 11-02-2010
2.00
Rear stick grip
Details
       

 11-01-2010
2.75
Installed stick grips
Details
       

 10-31-2010
4.25
Solved friction in control mount
Details
       

 10-30-2010
3.25
Safety wired pitch servo
Details
       

 10-19-2010
3.00
More AOA/Pitot
Details
     

 10-13-2010
5.25
AOA and Pitot lines
Details
       

 09-29-2010
1.25
Set torque on roll bar bolts
Details
       

 06-28-2010
1.00
Part I - Pitch Servo Hardware
Details
     

 05-26-2010
1.50
Part 2 Re-installing contols rods
Details
     

 05-03-2010
5.75
Finished aileron boots
Details
       

 04-27-2010
3.00
2. Started aileron boot rings
Details
       

 04-19-2010
1.50
Primed/Pained (L) Gear mount
Details
     

 04-18-2010
0.50
Riveted rear shoulder strap anchors
Details
       

 03-21-2010
1.00
Riveted antenna doublers
Details
       

 03-20-2010
3.50
Fixed aft spread of canopy frame
Details
     

 03-18-2010
5.50
Drilled Canopy Skirts
Details
       

 02-27-2010
6.75
Started Canopy Skirt
Details
       

 02-25-2010
3.00
Fit windscreen to roll bar
Details
       

 02-24-2010
2.75
Canopy gluing complete
Details
       

 02-23-2010
2.75
Prepared canopy for cosmetic layer of glue
Details
       

 02-21-2010
6.75
Glued on canopy
Details
       

 02-20-2010
2.25
Tape off canopy and frame
Details
       

 02-19-2010
6.50
Final fit of canopy
Details
       

 02-18-2010
4.00
THE BIG CUT
Details
       

 02-16-2010
4.75
More canopy fitting
Details
     

 02-15-2010
4.00
Canopy fitting
Details
       

 02-14-2010
1.50
Mounted nose wheel tire and tube
Details
       

 02-04-2010
1.50
Mounted main tires on wheels
Details
       

 02-03-2010
0.50
Main tire and wheel
Details
       

 02-02-2010
1.75
Trimming canopy flange
Details
     

 02-01-2010
2.75
Canopy stand
Details
       

 01-31-2010
4.00
Drilled Canopy Rails
Details
       

 01-30-2010
2.50
Outer skin of door done.
Details
       

 01-29-2010
1.25
Started to rivet baggage door
Details
       

 01-28-2010
6.50
Baggage door
Details
       

 01-27-2010
2.75
Fixed another QB mistake
Details
       

 01-26-2010
1.50
Worked on canopy handle/latch
Details
       

 01-25-2010
1.00
Canopy latch
Details
     

 01-24-2010
2.00
More canopy frame fitting
Details
       

 01-23-2010
7.50
Canopy frame started
Details
       

 01-20-2010
2.00
Rear Track done
Details
       

 12-29-2009
4.75
Riveted canopy track
Details
       

 12-21-2009
5.00
Continued Canopy track
Details
       

 12-20-2009
4.75
Started canopy track
Details
       

 12-19-2009
3.75
Primed parts & dimpled floor
Details
       

 12-18-2009
6.00
XPDR Antenna doubler and stuff
Details
       

 12-17-2009
5.75
Fitting VHF antennas
Details
       

 12-16-2009
1.00
VHF Antenna doubler
Details
     

 12-15-2009
5.00
Transponder antenna doubler
Details
       

 12-14-2009
4.75
VHF Antenna doublers con't
Details
       

 12-13-2009
4.50
VHF Antenna doublers
Details
       

 11-30-2009
1.75
1. Installed ruder pedals
Details
     

 11-29-2009
3.25
Riveted on pedal extensions
Details
       

 11-27-2009
3.00
1. Finishe aft top skin
Details
       

 11-26-2009
3.00
Aft top skin
Details
       

 11-25-2009
2.25
2. Started riveting aft top skin
Details
       

 11-22-2009
3.75
2. Aft Top Skin
Details
       

 11-22-2009
2.25
1. Primed Step & Stuff
Details
       

 11-21-2009
1.75
Prepare to rivet step
Details
     

 11-11-2009
1.25
Instrument Panel Labels
Details
       

 11-09-2009
1.00
Fit main panel to sub-panel
Details
     

 11-01-2009
4.25
Baggage floor extension done
Details
       

 10-31-2009
5.00
Baggage floor extension con't
Details
       

 10-30-2009
2.25
Baggage floor extension
Details
       

 10-30-2009
1.00
1. Switch labels
Details
       

 10-25-2009
0.75
Finished purge return line
Details
       

 10-24-2009
4.00
Purge return line
Details
       

 10-07-2009
3.00
Painted CB Panel, started Purge line
Details
     

 09-27-2009
1.00
Continuted purge return line
Details

 09-26-2009
1.50
Purge return line
Details

 08-30-2009
2.50
Drilled Fwd Top Skin
Details
       

 08-19-2009
4.75
Instument sub panels clecoed top skin
Details
       

 08-18-2009
4.00
Cut holes in panel for G-meter and air vent
Details
       

 08-16-2009
5.00
Prepared to fit front top skin
Details
       

 08-12-2009
2.75
Installed OAT probe & Rear stick pin
Details
       

 08-10-2009
3.75
Lace tied aft wires
Details
       

 08-03-2009
3.00
New (R) tank fuel line
Details
       

 08-02-2009
4.50
Finished battery holder
Details
       

 08-01-2009
3.50
Fabricating battery holder
Details
       

 07-31-2009
5.75
Built ELT deck
Details
       

 07-11-2009
1.25
Static line
Details
       

 06-29-2009
3.75
Primed and riveted the "Wall of Breakers"
Details
       

 06-28-2009
2.00
Drilled for nut plates on new console assembly
Details
       

 06-27-2009
5.75
New right console with breaker panel
Details
       

 06-26-2009
3.25
Finished remote compass bracket
Details
     

 06-25-2009
4.50
Remote compass bracket
Details
       

 06-10-2009
0.75
Aft end of static system
Details
     

 06-09-2009
0.75
Installed Static Ports
Details
       

 06-08-2009
1.00
Finished Bead Blasting Pedals
Details
       

 06-04-2009
0.75
Bead Blast rudder pedals
Details

 06-03-2009
2.50
Riveted on Exhaust Cooling Ramp
Details
     

 06-02-2009
2.75
Static line clips
Details
       

 05-24-2009
2.25
Shim for Cooling Ramp
Details
       

 05-23-2009
1.50
Cooling Air Ramp
Details
     

 04-24-2009
2.75
Battery Tray
Details
     

 04-02-2009
2.25
"Human Factor Test" - Test fit rear throttle
Details
       

 04-01-2009
3.50
Rivet bulkhead tops
Details
       

 03-31-2009
4.50
Primed and riveted aft bulkhead parts.
Details
       

 03-28-2009
3.50
Made flap arm cover from template
Details
     

 03-27-2009
2.00
Prepare instrument panel
Details
     

 03-26-2009
4.25
Deburred aft top skin and bulkheads
Details
       

 03-24-2009
3.00
Drilled canopy bow
Details
       

 03-22-2009
6.50
Aft top skin, start canopy bow
Details
       

 03-21-2009
4.50
Clecoed on aft top skin
Details
       

 03-20-2009
6.00
Starting upper aft fuselage
Details
       

 03-19-2009
4.75
Last fuel line. Fit Step
Details
       

 03-18-2009
3.00
(R) Brake line, Fuel return line
Details
       

 03-16-2009
2.50
Left brake line though cockpit
Details
       

 03-15-2009
2.75
Fuel line between filter and pump
Details
     

 03-14-2009
2.75
More fuel lines, left and to filter
Details
       

 03-13-2009
6.00
Right fuel supply line and vent lines
Details
       

 02-26-2009
6.25
Installed Fuel Pump and (L) vent line
Details
       

 02-25-2009
4.50
Half of right vent, installed fuel filter
Details
       

 02-24-2009
4.25
Set torque on (R) mount
Details
       

 02-23-2009
1.75
Installed bolts holding (R) gear mount
Details
     

 02-22-2009
4.75
More fitting right gear weld mount
Details
       

 02-21-2009
1.25
Removed bolts to right gear weld mount
Details

 02-20-2009
3.25
Installed and set torque on (L) gear weld moun
Details
       

 02-04-2009
0.50
Installed bolts into left gear weld mount
Details

 02-03-2009
2.00
Finished (L) gear weld mount
Details
       

 02-02-2009
3.75
Gear Weld Mount Part 3
Details
       

 02-01-2009
2.50
Remove Gear Weld Mount Part 2
Details
       

 01-31-2009
0.75
Remove Gear Weld Mount Part I
Details
     

 01-30-2009
1.50
Removed left wooden spar
Details

 01-29-2009
2.00
Installed fuel and brake bulkhead fittings
Details
       

 01-28-2009
1.00
Checked torque of gear mounts
Details
     

 01-20-2009
0.75
Removed seat and floor panels
Details
     

 01-05-2009
1.00
Riveted some nut plates
Details
       

 01-01-2009
3.00
Install "eyball" lights to 804 caps
Details
       

 12-31-2008
1.75
Install nut plates for bracket
Details
     

 12-30-2008
5.00
Install Andair Fuel valve
Details
       

 12-26-2008
4.00
Rear Throttle complete
Details
       

 12-22-2008
4.75
Rear Throttle continued
Details
       

 12-19-2008
1.75
Rear throttle continued
Details

 12-18-2008
1.50
Rear Throttle rod holes
Details
       

 12-11-2008
3.25
Contined Rear Throttle, Removed Tail
Details
       

 12-09-2008
2.00
Rear Throttle kit
Details
       

 12-01-2008
1.50
Began fuel system section
Details

 11-29-2008
3.00
Adjusted fit of aft mount
Details
       

 11-28-2008
6.50
Installed flap motor, and rudder cables
Details
       

 11-27-2008
1.25
Drilled flap actuator for safety wire
Details
     

 11-25-2008
3.00
Hung the rudder and trimed the stops
Details
       

 11-24-2008
2.75
Finished trimming elevator stops
Details
       

 11-24-2008
4.25
Drilled elevator horns and connecte push rod
Details
       

 11-23-2008
2.50
Trimmed HS, Set (R) elevator travel limits
Details
       

 11-22-2008
5.75
Continued control linkages
Details
       

 11-21-2008
0.50
Began install of control column
Details
     

 11-20-2008
6.00
Finished VS install.
Details
       

 11-19-2008
6.50
Installed Vertical Stab
Details
       

 11-18-2008
3.00
Drilled attach holes for HS
Details
       

 11-17-2008
4.50
Began installing Horzontal Stab
Details
       

 10-10-2008
2.00
Drill pedal extensions to pedal
Details
       

 09-29-2008
5.00
Continued brake pedal extensions
Details
       

 09-28-2008
3.00
Pedal Extensions
Details
       

 09-27-2008
2.00
Pedal release assembly
Details
       

 09-26-2008
4.25
Brake pedals and master cylinders
Details
       

 09-25-2008
1.00
Rudder pedal slide blocks
Details
       

 09-24-2008
2.50
Rudder pedal slide bar
Details
       

 09-23-2008
4.75
Replace bad F-810C angle
Details
       

 09-22-2008
0.00
Major issue with F810C-1
Details
       

 09-21-2008
5.50
Install electric aileron trim brackets and rod
Details
       

 09-20-2008
3.75
Primed out side of tubes installed stick bushings
Details
       

 09-19-2008
2.25
Prime control tubes, start aileron trim parts
Details
       

 09-18-2008
1.00
Riveted on bearing to F-841 tube
Details

 09-16-2008
5.50
Elevator bell crank and push rods
Details
       

 09-13-2008
0.00
Test ride!
Details
       

 09-12-2008
0.75
Rivet on tail tie down
Details
       

 09-11-2008
4.50
Installed (R) longeron console nuts
Details
       

 09-10-2008
1.75
Drilled F-812 angle, tapped tie down
Details
       

 09-09-2008
3.00
(L) console nut plates. F812B angle
Details
       

 09-08-2008
0.50
Drilled rivet holes for nut plates in right longer
Details
     

 08-27-2008
1.50
Tapped holes in cable anchor bracket
Details
       

 08-26-2008
3.00
Fit rear pedal idler arm. L/R upper console suppo
Details
       

 08-24-2008
4.00
Drilled left longeron for console cover
Details
       

 08-17-2008
5.00
Installed nut plates for rear rudder pedal guides
Details
       

 08-16-2008
2.00
Part 2: Rear rudder pedals
Details
       

 08-16-2008
5.50
Part 1: Rivet nut plates on to floors and consoles
Details
       

 08-15-2008
5.75
Deburr and Prime floor and console parts
Details
       

 08-14-2008
4.50
New flap blocks, front consoles
Details
       

 08-13-2008
2.50
Tail tie down and cable anchor
Details
       

 08-12-2008
5.50
Main Gear mounting Bolt Reaming
Details
       

 08-11-2008
2.25
Floor panel stiffeners and rear seat hinge
Details
       

 08-10-2008
7.50
Front seat floor stiffeners and nut plates
Details
       

 08-02-2008
1.00
Continued work on flap blocks
Details
       

 08-01-2008
1.75
Flap weld mount blocks
Details
       

 07-14-2008
0.00
Part: 2 Bulkhead bulge
Details
       

 07-14-2008
5.50
Part 1: Fiished riveting rear seatback, clecoed fl
Details
       

 07-13-2008
7.00
Finished Front Seat Back and started the rear seat
Details
       

 07-12-2008
2.25
Started front seat back
Details
       

 07-11-2008
2.00
Started work on mounting step
Details
       

 07-10-2008
5.00
Built fuselage rotisserie
Details
       

 03-04-2008
0.75
Front seatback
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.