KitLog pro

Powered By Kitlog Pro v2.0

Construction Of the Europa XS
Work Logs Found: 15
Category Work Time: 70 Hours
 Date
Hours
Work Log Summary

Details

 12-31-2009
15.00
Mass Balance Box Tidy Up
Details
       

 03-01-2009
3.75
The Final fix of the top skin
Details
       

 02-27-2009
4.75
After the Redux had set
Details
       

 02-24-2009
6.00
Bonding the top trailing edge
Details
       

 09-29-2007
1.50
Mass balance boxes
Details
       

 09-16-2007
5.00
Fitting The Flaps
Details
       

 09-02-2007
2.00
Treating Metal Parts
Details
     

 08-28-2007
2.50
Mass Balance boxes Slots.
Details
       

 08-26-2007
3.00
Port aileron
Details
       

 08-25-2007
5.25
Fitted the Pitot/Static
Details
       

 08-19-2007
6.75
Prepared the w18 flap hinge plates for bonding in
Details
       

 08-11-2007
1.50
Aileron re-enforcing
Details
     

 08-11-2007
1.00
Aileron hinge re-enforcing
Details
     

 08-05-2007
4.00
Re-enforcing the wing root
Details
       

 08-04-2007
8.00
Wing has to be re-enforced
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.