Powered By Kitlog Pro v2.0
Construction Of the Europa XS
Europa XS
Port Wing
Work Logs Found:
15
Category Work Time:
70 Hours
Date
Hours
Work Log Summary
Details
12-31-2009
15.00
Mass Balance Box Tidy Up
Details
03-01-2009
3.75
The Final fix of the top skin
Details
02-27-2009
4.75
After the Redux had set
Details
02-24-2009
6.00
Bonding the top trailing edge
Details
09-29-2007
1.50
Mass balance boxes
Details
09-16-2007
5.00
Fitting The Flaps
Details
09-02-2007
2.00
Treating Metal Parts
Details
08-28-2007
2.50
Mass Balance boxes Slots.
Details
08-26-2007
3.00
Port aileron
Details
08-25-2007
5.25
Fitted the Pitot/Static
Details
08-19-2007
6.75
Prepared the w18 flap hinge plates for bonding in
Details
08-11-2007
1.50
Aileron re-enforcing
Details
08-11-2007
1.00
Aileron hinge re-enforcing
Details
08-05-2007
4.00
Re-enforcing the wing root
Details
08-04-2007
8.00
Wing has to be re-enforced
Details
SITE NAVIGATION
Contact Builder
Europa XS Home
Category
# Logs
# Hours
All
241
1209
Aft Area
4
19
Aileron
15
40
Cockpit Module
17
60
Electrics
4
21
Engine
9
41
Filling Process
7
178
Flaps
17
65
Fuel System
2
16
Fuselage
28
169
FWF
1
5
In The Cockpit
9
34
Instruments
1
4
Kit Collection
1
3
Landing Gear
7
49
Miscellaneous
4
4
Mods
31
135
Port Wing
15
70
Rigged Aircraft
1
6
Rudder
18
43
STBD Wing
2
63
Tailplanes
31
91
Wing Fitting
11
63
Workshop
6
30
Copyright © 2001-2024 Matronics. All Rights Reserved.