Powered By Kitlog Pro v2.0
Schroeders Sportsman
Sportsman 2+2
Fuselage
Work Logs Found:
314
Category Work Time:
584 Hours
Date
Hours
Work Log Summary
Details
05-13-2020
2.00
Spinner Clearance
Details
12-13-2019
1.50
Sanding to prime
Details
07-24-2019
1.20
Tail Cone #2
Details
01-31-2019
1.00
Right wing fold hatch
Details
01-22-2019
1.00
Adding Glass
Details
12-22-2018
3.80
Fairing time
Details
12-11-2018
1.00
Right Wing Fols hatch
Details
12-02-2018
1.20
Working the right wing fold hatch ocover
Details
11-25-2018
1.30
Foam for the Right Hatch cover
Details
11-11-2018
2.30
Left Wing fold hatch rework
Details
11-10-2018
3.00
Wing fold hatch glass
Details
11-09-2018
2.00
Wing Fold Covers
Details
10-06-2018
3.00
Last Cowling Fastners
Details
11-24-2017
4.00
Turtle deck covers
Details
11-05-2017
3.00
Upper Cowling
Details
11-04-2017
2.30
Glass Day
Details
11-03-2017
1.80
Bulkhead A nutplates
Details
06-26-2017
1.00
Torque seal
Details
05-26-2017
2.00
Moving Electrons
Details
05-21-2017
0.70
Rear shear web
Details
04-23-2017
2.80
First Battery Charge
Details
04-09-2017
3.00
Fuse panel
Details
03-25-2017
3.20
Rudder Fairing
Details
03-19-2017
3.00
Nikki On the Plane
Details
07-30-2016
1.00
GPS Antenna
Details
06-12-2016
1.10
Cowling 3
Details
02-28-2016
1.10
Cowling 2
Details
02-06-2016
1.00
Cowling
Details
01-27-2016
3.00
Aileron rigging
Details
12-31-2015
1.90
Exhaust plate
Details
12-25-2015
2.20
Elevator Bell crank move
Details
12-13-2015
1.90
Dog Leash point
Details
10-24-2015
0.60
Nose Wheel
Details
10-16-2015
0.50
Ground bus
Details
10-14-2015
1.20
Elevator Trim
Details
10-12-2015
0.40
Wiring the tail
Details
10-11-2015
0.40
Headset Hanger
Details
08-19-2015
1.30
Cowling tabs
Details
06-06-2015
0.50
headset hanger
Details
04-16-2015
0.60
Routing rear cabeling
Details
04-14-2015
1.40
Rear cargo area
Details
04-13-2015
0.60
Rear tunnel nutplates
Details
04-12-2015
0.90
Rear tunnel attach brackets
Details
03-19-2015
1.60
Rear Tunnel Cover 1
Details
03-18-2015
1.80
Rear Tunnel Cover
Details
03-17-2015
0.80
Exhaust Shield
Details
03-16-2015
0.70
Rear Tunnel Cover
Details
01-04-2015
0.70
Tail wheel finished
Details
01-03-2015
1.50
Tail wheel control cables
Details
12-29-2014
1.20
Oil Door 2
Details
12-24-2014
1.00
Oil Door 1
Details
12-23-2014
1.10
Oil Door
Details
11-24-2014
0.90
Fixing moving damage
Details
10-11-2014
1.30
Trimmed the Firewall Flanges
Details
10-07-2014
1.20
Seal Firewall flanges
Details
06-17-2014
2.10
Firewall 8
Details
06-16-2014
2.00
Firewall 8
Details
06-15-2014
2.50
Firewall 7
Details
06-14-2014
3.00
Firewall 7
Details
06-08-2014
1.30
Firewall 6
Details
06-07-2014
1.10
Firewall 6
Details
06-03-2014
1.10
Firewall 5
Details
05-27-2014
1.20
Firewall 4
Details
05-26-2014
3.00
Firewall 3
Details
05-25-2014
4.00
Firewall 2
Details
05-24-2014
2.40
Firewall1
Details
05-21-2014
1.30
Firewall Flanges
Details
05-03-2014
2.10
Interior painting clean up
Details
04-24-2014
5.00
Baggage door
Details
04-23-2014
2.20
Nose wheel structure
Details
04-21-2014
1.90
Back on the wheels
Details
04-16-2014
1.90
Finishing the bagage area
Details
04-12-2014
2.60
Fresh air vents
Details
03-30-2014
1.30
Belly Seam
Details
03-27-2014
2.00
Elevator pushrod 2
Details
03-19-2014
1.40
Prep the cargo area for paint
Details
03-13-2014
1.30
Clearence for the elevator pushrod
Details
03-11-2014
0.80
Elevator pushrod
Details
03-10-2014
0.80
In the hangar
Details
02-26-2014
1.10
Sanding strakes
Details
02-25-2014
1.30
Throtle Panel
Details
02-19-2014
0.80
Firewall Layout
Details
02-15-2014
2.10
Priming and Sanding
Details
02-13-2014
0.80
Fill and fairing baggage area
Details
02-09-2014
1.10
Service Bulliten #1
Details
02-08-2014
2.50
Service Bulliten 70
Details
02-05-2014
0.50
Footwell cover
Details
02-04-2014
1.10
Floor Boards and Prop Extention
01-30-2014
1.20
Nose Wheel & Forward Baffeling
Details
01-26-2014
1.30
Rear Tunnel Fit
Details
01-17-2014
0.50
Rear Tunnel
Details
11-03-2013
2.00
Footwell cover
Details
10-13-2013
1.20
Second set of footwell cover attach tabs
Details
10-11-2013
0.80
First set of seatwell attach tabs
Details
10-08-2013
1.20
Seatwell Cover
Details
09-22-2013
1.50
Rear Footwell Cover
Details
09-03-2013
0.30
Right Floorboard
Details
06-27-2013
0.70
Baggage door latch
Details
06-23-2013
1.10
Lower aft cage attach tabs
Details
03-19-2013
1.00
Baggage door
Details
03-16-2013
3.50
Strakes
Details
03-11-2013
10.00
Zach Visit
Details
03-09-2013
2.30
Strakes
Details
02-19-2013
1.10
Front tunnel cover
Details
02-18-2013
6.00
Drilling tail dragger gear
Details
02-16-2013
0.70
Rigth side fuel feed line.
Details
02-15-2013
0.10
The Jack
Details
02-02-2013
2.10
Nose Gear
Details
01-29-2013
1.80
Baggage door fitting
Details
01-27-2013
3.10
Baggage door hinges
Details
01-21-2013
1.90
Fuel Sumps
Details
01-17-2013
2.00
Front passenger door
Details
01-06-2013
2.30
Rear seat back
Details
12-28-2012
5.00
Doors
Details
12-17-2012
0.70
Seat belt holes
Details
12-10-2012
1.00
Rear seat back
Details
12-06-2012
0.30
Rear seat bracket
Details
12-04-2012
0.60
Rear seat back lower brackets
Details
12-01-2012
3.50
Brakes and Rear Seat Back
Details
11-29-2012
1.10
Rear seat back
Details
11-28-2012
0.70
Rear seat brackets lower
Details
11-27-2012
0.50
Rear Seat backets top
Details
11-20-2012
0.60
Cargo Floor #3
Details
11-12-2012
0.80
Cargo Floor #2
Details
11-11-2012
0.50
Cargo floor #1
Details
11-03-2012
0.70
Cargo Floor
Details
10-28-2012
2.80
Aft Tunnel #5
Details
10-27-2012
2.10
Aft Tunnel #4
Details
10-22-2012
1.80
Forward section of aft tunel
Details
10-21-2012
1.40
Forward section of tunnel
Details
10-15-2012
0.80
Rear Tunnel #3
Details
10-14-2012
0.90
Rear Seat Belt Brackets
Details
10-11-2012
0.50
Tunnel Walls
Details
10-10-2012
0.30
Sump Doublers
Details
10-07-2012
2.10
Rear Tunnel #2
Details
10-02-2012
0.70
Foot Well Cover
Details
10-01-2012
1.60
Cable Tunnel #1
Details
09-30-2012
1.10
Cable Tunel
Details
09-24-2012
1.40
Rear Seat Belts
Details
08-09-2012
1.70
Fiberglass Party
Details
08-08-2012
1.70
Firewall
Details
08-07-2012
1.60
Landing light holes #1
Details
08-06-2012
1.30
Landing light holes
Details
08-04-2012
2.30
Cargo Tabs
Details
08-02-2012
1.30
Cargo Tab
Details
07-10-2012
0.90
Side walls
Details
07-09-2012
0.80
Tunnel cover
Details
07-08-2012
1.30
Cargo Ribs
Details
07-07-2012
1.10
Cargo area
Details
04-28-2012
1.90
Rear Seat
Details
02-25-2012
0.90
Bulkhead A #6
Details
02-24-2012
2.30
Bulkhead A #5
Details
02-23-2012
1.40
Bulkhead A #4
Details
02-22-2012
1.10
Bulkhead A #3
Details
02-20-2012
2.10
Bulkhead A #2
Details
02-19-2012
2.20
Bulkhead A #1
Details
02-17-2012
1.20
Bulkhead A
Details
02-12-2012
1.10
Bulkhead A Alignment
Details
02-09-2012
0.90
Tail cone
Details
02-05-2012
5.00
Aft shearweb
Details
01-29-2012
1.90
Aft Shearweb #3
Details
01-28-2012
2.50
Aft Shearweb#2
Details
01-26-2012
1.40
Aft Shearweb #1
Details
01-25-2012
0.90
Aft Shearweb
Details
01-21-2012
1.20
Buklhead E nutplates
Details
01-20-2012
1.30
BH E forward glass
Details
01-18-2012
0.60
Qcell fillet for BH E
Details
01-17-2012
0.60
BH E Aft glass
Details
01-16-2012
3.50
Bulkhead E
Details
01-12-2012
0.40
Cut Bulkhead E glass
Details
01-10-2012
0.80
Air Inlet
Details
01-08-2012
3.20
Cage attach hardware
Details
01-07-2012
3.50
Rear Fuselage Attach points
Details
12-27-2011
4.00
Cable Guards
Details
12-23-2011
0.70
Tail wheel forward spring attach
Details
12-22-2011
0.80
Aft upper cage attach
Details
12-21-2011
1.10
Rear cage struts
Details
12-20-2011
1.00
Cable Guards/ Nose Gear bushings
Details
12-16-2011
1.10
Baggage Door
Details
12-14-2011
1.10
Shearweb nutplates
Details
12-13-2011
1.30
Door Hinges
Details
12-12-2011
1.40
Shearweb brackets
Details
12-10-2011
3.20
Cable Guards
Details
12-06-2011
0.70
Cable guards
Details
12-04-2011
3.10
cable guards
Details
12-03-2011
2.30
Forward shear web
Details
12-01-2011
0.70
HS shim
Details
11-29-2011
0.40
Brake master cylinder
Details
11-28-2011
0.40
Brake Pedals
Details
11-27-2011
6.80
Rudder Pedals
Details
11-26-2011
2.10
Flap Handle
Details
11-25-2011
4.00
Set the Horizontal Stab
Details
11-24-2011
0.50
finish the forward shearweb
Details
11-23-2011
0.40
Prime Forward Shearweb
Details
11-22-2011
1.80
Forward Shearweb #2
Details
11-21-2011
0.40
Forward Shearweb #1
Details
11-20-2011
3.40
Forward shearweb
Details
11-19-2011
1.60
Cabin Vents
Details
11-16-2011
1.80
Right side cabin vent
Details
11-07-2011
0.80
Cabin air inlet Left
Details
12-02-2010
1.80
Top Deck
Details
11-24-2010
2.10
Fuselage attach struts
Details
11-04-2010
0.60
Patching Glass #2
Details
11-03-2010
1.60
Patching Glass
Details
11-01-2010
0.80
Cutting fiberglass
Details
10-31-2010
0.80
HS stab alignment
Details
10-30-2010
4.20
Elevator Bellcrank Assembly
Details
10-29-2010
0.50
Elevator Bellcrank
Details
10-28-2010
1.40
Elevator Bellcrank Brackets
Details
10-21-2010
1.10
Elevator bellcrank brackets
Details
10-18-2010
3.80
HS Stab attach bracket
Details
10-17-2010
4.20
Trim Fuselage for HS Stab
Details
10-16-2010
3.10
Forward Sheerweb
Details
10-14-2010
0.90
Forward Sheerweb brackets
Details
10-11-2010
0.30
Bulkhead C
Details
10-10-2010
7.40
Forward Shear web brackets
Details
10-08-2010
0.40
Clean Aft Shearweb Bracket
Details
10-07-2010
1.70
Shear Web Aft Bracket
Details
10-05-2010
1.40
HS mounting bracket
Details
10-04-2010
1.30
Horizontal Stab Mount
Details
09-30-2010
1.40
Bulkhead D #2
Details
09-28-2010
0.80
Bulkhead D #1
Details
09-27-2010
1.10
Bulkhead D
Details
09-26-2010
2.10
Rudder Stop
Details
09-20-2010
1.70
Hang the Rudder
Details
09-17-2010
0.40
Clean up the Vertical fin rib.
Details
09-15-2010
1.30
Vertical Fin Rib
Details
09-13-2010
1.70
Rudder Hinges
Details
09-12-2010
3.80
Vertical Stab Spar #2
Details
09-11-2010
4.20
Vertical Stab Spar #1
Details
09-09-2010
1.10
Vertical Stab Spar
Details
09-06-2010
4.20
Bond Bulkhead B to Verticle Stab
Details
09-05-2010
4.30
Bulkhead C #3
Details
08-31-2010
1.10
Bulkhead C #2
Details
08-30-2010
1.40
Bulkhead C #1
Details
08-29-2010
3.80
Bulkhead C
Details
08-28-2010
3.20
Bulkhead B BDM #1
Details
08-25-2010
1.20
Bulkhead B BDM
Details
08-24-2010
1.40
Bulkhead B Qcell #3
Details
08-23-2010
1.30
Bulkhead B Qcell #2
Details
08-16-2010
1.60
Elevator Pushrod
Details
08-15-2010
4.40
Bulkhead B QCell
Details
08-14-2010
2.10
Bulkhead B
Details
08-13-2010
1.40
Drill Rudder Stop
Details
08-12-2010
2.10
Rudder Stop
Details
08-04-2010
0.40
Bulkhead A
Details
08-03-2010
1.20
Layup Bulkhead A
Details
08-02-2010
1.10
Bulkhead A Prep
Details
08-01-2010
3.40
Rudder Stop & Bulkhead A
Details
07-31-2010
3.40
Setting the Vertical Stabilizer Spar
Details
07-30-2010
2.10
Rudder pedal brackets
Details
07-29-2010
1.30
Verticle Stab Spar
Details
07-18-2010
3.40
Vertical Stabilizer Aglinment
Details
07-15-2010
1.20
Ruder pedals and Vertical Stab
Details
07-11-2010
0.80
Fitting D & E
Details
07-09-2010
0.80
Fitting Bulkheads
Details
07-07-2010
0.30
Level the Fuselage
Details
07-05-2010
5.10
Belly Seam and Rudder Pedals
Details
07-04-2010
3.40
Bulkhead and Rudder Pedals
Details
06-06-2010
0.90
2nd side of Bulkhead B
Details
06-03-2010
0.80
2nd side bulkhead C
Details
06-02-2010
0.90
2nd side Bulkhead D
Details
05-01-2010
2.80
Bulkhead Layup
Details
04-18-2010
2.30
Cut Glass
Details
04-05-2010
1.10
Belly Seam
Details
12-19-2009
1.10
Bulkhead B & E
Details
12-03-2009
0.80
Bulkhead E and Cage Attaches
Details
11-24-2009
4.60
Bulkhead C,D &E
Details
11-20-2009
3.60
Bulkhead layups
Details
11-16-2009
1.20
Attach brackets
Details
11-14-2009
3.80
Side attach brackets
Details
11-13-2009
1.30
Side cage attach brackets
Details
11-10-2009
6.20
Side attach brackets
Details
11-09-2009
5.70
VE epoxy day.
Details
11-07-2009
3.20
Epoxy front cage attaches
Details
11-05-2009
1.60
Sanding Belly Seam #2
Details
11-04-2009
1.10
Sanding the Belly Seam #1
Details
11-02-2009
1.40
Sanding Belly Seam
Details
11-01-2009
2.90
Attach brackets
Details
10-31-2009
2.70
Side attach brackets
Details
10-30-2009
6.30
VE epoxy day
Details
10-29-2009
1.80
Waterline #1
Details
10-28-2009
1.60
Waterline
Details
10-27-2009
1.10
Front Cage Brackets
Details
10-26-2009
0.90
Forward Cage attaches
Details
10-25-2009
4.80
Top Deck #1
Details
10-24-2009
4.90
Top Deck
Details
10-23-2009
5.80
Prep top deck and Bulkhead B
Details
10-21-2009
1.20
Left side of fuselage
Details
10-20-2009
1.20
Fuselage Surgery
Details
10-19-2009
1.70
Attach right side of cage
Details
10-18-2009
3.70
Door Build #2
Details
10-17-2009
2.80
Door build
Details
10-13-2009
2.30
Drilled holes and secured cage
Details
10-12-2009
1.60
Drill and secure the bottom cage
Details
10-11-2009
2.90
Bond Dorsal Seam
Details
10-07-2009
2.30
Comm Antenna
Details
10-03-2009
3.80
Bonded belly seam
Details
09-27-2009
4.30
Flap Handle
Details
09-26-2009
1.70
Align cage and shells #5
Details
09-25-2009
2.10
Aligning Cage and Shells #5
Details
09-20-2009
1.30
Align Cage and Shells #4
Details
09-15-2009
1.70
Align cage and shells #3
Details
09-13-2009
1.80
Align cage and shells #2
Details
09-09-2009
0.70
Align cage and shells #1
Details
09-02-2009
0.80
Align Cage and shells
Details
08-17-2009
1.30
Aligning Cage and fuselage
Details
08-05-2009
0.70
Aligning the fuselage
Details
08-04-2009
1.30
Wing Hinges
Details
08-02-2009
2.00
Prepping the Fuselage
Details
09-27-2007
7.00
Fabricate aft shell attach fittings
Details
08-26-2007
1.50
Fabricate Lower Shell Attach Fittings
Details
08-22-2007
1.50
Fabricate upper shell attach fittings
Details
08-21-2007
1.00
Cut angle stock for shell attach fittings
Details
SITE NAVIGATION
Contact Builder
Sportsman 2+2 Home
Category
# Logs
# Hours
All
1462
2855
Aileron
61
104
Avionics
66
102
Elevator
98
137
Engine
65
83
Final Assembly
292
735
Flap
39
86
Fuselage
314
584
Horizontal Stab
47
82
Horizontal Stab Elev
47
82
Miscellaneous
56
59
Parts
1
2
Rudder
24
55
Systems
87
134
Wings
265
610
Copyright © 2001-2024 Matronics. All Rights Reserved.