Date
|
Hours
|
Work Log Summary
|
Details
|
07-29-2012
|
0.25
|
Sanded left elevator tip
|
Details
|
|
|
07-25-2012
|
1.25
|
2. More elevator tips
|
Details
|
|
|
07-24-2012
|
0.75
|
1. More elevator tip work
|
Details
|
|
|
07-23-2012
|
2.75
|
1. Laid elevator tip ends
|
Details
|
|
|
07-16-2012
|
0.50
|
1. Sanded VS tip layup
|
Details
|
|
|
07-13-2012
|
0.75
|
4. VS tip end
|
Details
|
|
|
07-12-2012
|
4.25
|
VS tip and elevator tips
|
Details
|
|
|
07-11-2012
|
4.00
|
Fit rudder top and bottom
|
Details
|
|
|
05-11-2008
|
5.25
|
Rolled and riveted elevator leading edges
|
Details
|
|
|
04-23-2008
|
2.25
|
Rolled and riveted rudder leading edge
|
Details
|
|
|
03-23-2008
|
4.25
|
Trim Tab riveted inplace
|
Details
|
|
|
03-22-2008
|
2.25
|
Riveted bottom of trim tab
|
Details
|
|
|
03-19-2008
|
1.75
|
Finished riveting elevator up to trim tab holes
|
Details
|
|
|
03-18-2008
|
1.25
|
Re-worked counterweight with wrong holes
|
Details
|
|
|
03-18-2008
|
3.00
|
Placed RTV and started riveting left elevator
|
Details
|
|
|
03-17-2008
|
3.00
|
Rivet left elevator understructure
|
Details
|
|
|
03-16-2008
|
3.75
|
Trim tab
|
Details
|
|
|
03-15-2008
|
5.25
|
Cut off elevator tabs and built "riblet"
|
Details
|
|
|
03-14-2008
|
3.50
|
Bent ends of the trim tab
|
Details
|
|
|
03-11-2008
|
1.75
|
Bent trim tab trailing edge
|
Details
|
|
|
03-07-2008
|
2.25
|
Prepared new E-606 trim spar
|
Details
|
|
|
03-06-2008
|
6.50
|
Riveted right elevator to understructure
|
Details
|
|
|
03-05-2008
|
2.50
|
Prime Elevator parts
|
Details
|
|
|
02-29-2008
|
2.50
|
Countersink 702 and 606 spars, scuff trim tab part
|
Details
|
|
|
02-27-2008
|
2.75
|
Deburr right elevator spar and ribs
|
Details
|
|
|
02-26-2008
|
5.00
|
Drilled left elevator ribs, dimpled right elevator
|
Details
|
|
|
02-23-2008
|
3.25
|
Flute new ribs and drilled counter weight
|
Details
|
|
|
02-18-2008
|
5.50
|
Drilled holes in left counter weight, sort of
|
Details
|
|
|
02-17-2008
|
4.50
|
Drilled CS holes in spar for 709 rib
|
Details
|
|
|
02-16-2008
|
2.75
|
Riveted on nut plates and left elevator stiffeners
|
Details
|
|
|
02-16-2008
|
4.75
|
Began right elevator construction - all matched dr
|
Details
|
|
|
02-15-2008
|
3.25
|
Left elevator stiffeners, E-615 plate nuts
|
Details
|
|
|
02-14-2008
|
4.50
|
Riveted on right elevator stiffeners
|
Details
|
|
|
02-13-2008
|
2.00
|
Began right elevator
|
Details
|
|
|
02-12-2008
|
2.50
|
Rinished riveting the rudder
|
Details
|
|
|
02-11-2008
|
8.25
|
Finished rudder structure, began rudder skin rivet
|
Details
|
|
|
02-10-2008
|
8.00
|
Primed elevator and rudder parts, Rivet rudder fra
|
Details
|
|
|
02-08-2008
|
1.25
|
Gathered elevator parts
|
Details
|
|
|
02-06-2008
|
3.25
|
Deburr and dimle rudder parts
|
Details
|
|
|
02-05-2008
|
2.25
|
Drilled out remining holes of skin to frame
|
Details
|
|
|
02-04-2008
|
2.00
|
Primed rermainder of rudder skin
|
Details
|
|
|
02-04-2008
|
0.00
|
Cleocoed on skin to structure, to evaluate bend
|
Details
|
|
|
02-03-2008
|
4.75
|
Prmed stiffeners / Riveted on stiffeners
|
Details
|
|
|
02-02-2008
|
5.75
|
Fabricated rudder stiffeners a 2nd time
|
Details
|
|
|
01-20-2008
|
1.00
|
Getting help with back riveting
|
Details
|
|
|
01-16-2008
|
2.00
|
Tried to figure out what I am doing wrong!
|
Details
|
|
|
01-15-2008
|
10.50
|
Dimple, prime, rivet rudder stiffener and skin
|
Details
|
|
|
01-06-2008
|
4.00
|
2. Elevator stiffener fabrication
|
Details
|
|
|
01-06-2008
|
2.00
|
1. Final drilled 802 Rudder Spar, reserached nut p
|
Details
|
|
|
01-05-2008
|
4.00
|
Lower Rudder structure/upper rudder rib
|
Details
|
|
|
01-04-2008
|
2.75
|
Rudder rear spar, R-710 brace
|
Details
|
|
|
01-02-2008
|
2.50
|
Fabricate rudder stiffeners
|
Details
|
|
|
12-30-2007
|
7.00
|
HS is done:)
|
Details
|
|
|
12-29-2007
|
8.00
|
Riveted interior rivets on HS
|
Details
|
|
|
12-28-2007
|
5.00
|
Finsihed rear spar and riveted front spar
|
Details
|
|
|
12-27-2007
|
3.50
|
Primed RT skin and riveted bars onto rear spar
|
Details
|
|
|
12-27-2007
|
3.00
|
Cut out lower HS rear spar for elevator
|
Details
|
|
|
12-13-2007
|
1.00
|
Notch in bottom of HS Spar
|
Details
|
|
|
12-11-2007
|
4.00
|
Primed L/R HS ribs, spars and Lt skin
|
Details
|
|
|
12-10-2007
|
1.50
|
Dimpled right and left HS ribs and spars
|
Details
|
|
|
12-06-2007
|
4.50
|
Smoothed Lt HS skin, Dimpled Rt HS skin
|
Details
|
|
|
12-03-2007
|
1.00
|
Deburred Rt HS parts
|
Details
|
|
|
11-23-2007
|
3.25
|
Dirlled critical hole is Right side 405, and skin
|
Details
|
|
|
11-22-2007
|
3.25
|
Prepared right HS ribs and drilled attach holes
|
Details
|
|
|
11-22-2007
|
0.00
|
HS 814 reinforcing angle clearance
|
Details
|
|
|
11-22-2007
|
4.50
|
Drilled 404/405 rib holes and all skin to frame
|
Details
|
|
|
11-19-2007
|
4.25
|
Drilled Left HS ribs to spar, marked and fluted
|
Details
|
|
|
11-18-2007
|
2.00
|
Marking holes for 405 forward flange
|
Details
|
|
|
11-17-2007
|
3.00
|
HS Fwd spar reinforcing angle bends
|
Details
|
|
|
11-17-2007
|
4.00
|
Front Spar: Reinforcing angle prep
|
Details
|
|
|
11-17-2007
|
3.00
|
Fluting HS ribs
|
Details
|
|
|
11-15-2007
|
0.75
|
Riveted VA-146 Bearing.
|
Details
|
|
|
11-14-2007
|
1.00
|
VS Complete!
|
Details
|
|
|
11-13-2007
|
7.00
|
Riveted remaining skin rivets
|
Details
|
|
|
11-12-2007
|
3.50
|
Rivet VS skin to structure
|
Details
|
|
|
11-12-2007
|
4.00
|
Rear Spar Assembly
|
Details
|
|
|
11-11-2007
|
1.50
|
Primed the VS
|
Details
|
|
|
11-10-2007
|
1.00
|
Deburred edges of VS
|
Details
|
|
|
11-09-2007
|
4.00
|
Finished Paint booth, reset 2 rivets
|
Details
|
|
|
11-06-2007
|
1.50
|
Finished dimpling of the VS skin
|
Details
|
|
|
11-05-2007
|
1.00
|
Finished deburring the skin and started dimples
|
Details
|
|
|
11-04-2007
|
2.50
|
Built table for DRDT-2 / deburr VS
|
Details
|
|
|
10-26-2007
|
3.50
|
Primed and riveted VS ribs
|
Details
|
|
|
10-25-2007
|
5.75
|
Primed and riveted VS spar and doubler
|
Details
|
|
|
10-24-2007
|
2.75
|
Deburr VS main spar and doubler
|
Details
|
|
|
10-18-2007
|
5.00
|
Fluiting the Ribs / Matched drill VS
|
Details
|
|
|
10-17-2007
|
3.00
|
Fluting VS rib (NOT!)
|
Details
|
|
|
10-16-2007
|
0.75
|
Vertical Stab Main spar preperation
|
Details
|
|
|
08-08-2007
|
2.00
|
Inventory of Empanage
|
Details
|
|
|
07-30-2007
|
4.50
|
Reviewed Plans HS
|
Details
|
|