KENNETH T.'S WEB SITE
RV-7A
Miscellaneous
Work Logs Found:
120
Category Work Time:
581 Hours
Date
Hours
Work Log Summary
Details
10-05-2013
2.00
Airworthiness Inspection Completed
Details
09-18-2013
5.00
Installing interior materials & carpet.
Details
09-11-2013
4.00
Added hinges to baggage floor for tie downs.
Details
09-05-2013
4.00
Added a fire extinguisher and installed the GPS.
Details
09-03-2013
5.50
Unwired stick fuel boost switches.
Details
08-31-2013
3.50
Charlotte applied N numbers to fuselage.
Details
08-23-2013
3.50
Installed Kroger sun shade.
Details
08-14-2013
8.00
Programed Dynon and applied labels to panel.
Details
08-03-2013
4.00
Checked fuel boost pump operation.
Details
07-28-2013
3.00
Removed and replaced leaking brake fitting.
Details
07-27-2013
3.50
Uploaded a new Dynon firmware update.
Details
07-26-2013
4.00
Installed alternate static air source.
Details
07-21-2013
10.00
Cut the sticks shorter.
Details
07-15-2013
4.00
Bled the brakes & removed windshield protection.
Details
07-14-2013
6.00
Painted canopy bow aluminum band.
Details
07-13-2013
5.00
Applied the primer to the windshield layups.
Details
07-12-2013
4.00
Removed tape from the windshield layup.
Details
07-11-2013
8.00
Windshield layup filling, sanding, & priming.
Details
07-08-2013
4.00
Windshield sand & fill, fill & sand.
Details
07-05-2013
4.00
Sanded edges & added glass beads.
Details
07-03-2013
5.00
Sanding the windshield layup.
Details
07-02-2013
6.50
Filling and sanding the windshield.
Details
07-01-2013
4.50
The windshield fiberglass layup.
Details
06-29-2013
3.50
Final prep on the windshield before the layup.
Details
06-28-2013
4.50
Sanded flox and filled with Superfil.
Details
06-27-2013
4.00
More prep for windshield installation.
Details
06-26-2013
12.00
Preparation for windshield fiberglass layup.
Details
06-23-2013
6.00
Installed glareshield cover & started taping.
Details
06-22-2013
4.50
Removed windshield to prep for glareshield coverin
Details
06-21-2013
6.00
Riveted, Superfiled, & visited with windshield adv
Details
06-20-2013
5.00
Sanded elevator weights & sealed FW.
Details
06-06-2013
5.00
Made false floor to rivet top forward skin.
Details
06-05-2013
5.00
Located pitot tubes positions behind subpanel.
Details
06-03-2013
4.00
Prepping to install the wings for naught.
Details
05-31-2013
5.50
Sanded cowling filler and painted plenum.
Details
05-30-2013
5.50
Filler on the cowling and drilled out rivets.
Details
05-24-2013
2.50
Added nutplates for intersection fairings.
Details
05-23-2013
5.00
Set breakout force on nose gear fork.
Details
05-22-2013
4.00
Marked wheel pants for tire inflation holes.
Details
05-18-2013
6.00
Final plenum angles riveted.
Details
05-17-2013
5.00
Shortened right air inlet ramp.
Details
05-16-2013
4.50
Riveted angle to left side baffle and inlet.
Details
05-15-2013
5.00
Removed conical gusset from right inlet.
Details
05-13-2013
5.00
Riveted last side angles to plenum.
Details
05-11-2013
8.00
Finished most angles for the plenum.
Details
05-06-2013
5.00
Riveted part of the plenum.
Details
05-05-2013
6.50
Wheel pant and plenum work.
Details
05-04-2013
5.50
Match drilled plenum angles to the baffles.
Details
05-03-2013
4.00
Plenum angle trimming and fitting.
Details
05-01-2013
6.00
Sanded wheel pants and drilled plenum flange.
Details
04-30-2013
5.50
Last coat of micro beads on fairings.
Details
04-29-2013
4.00
I sanded to smooth the intersection fairings.
Details
04-28-2013
5.00
Spread glass beads onto the intersection fairings.
Details
04-27-2013
5.00
Used flox to cover the fairing juncture gap.
Details
04-26-2013
4.50
Prepped wheel pants for fairing gap filler.
Details
04-25-2013
5.00
More work on the plenum.
Details
04-24-2013
5.00
Glassed the wheel pant intersection f
Details
04-23-2013
4.50
Trimmed molded plenum.
Details
04-21-2013
7.00
Riveting baffle clips on forward baffles and inlet
Details
04-19-2013
4.50
Sanded on oil filler door install and riveted righ
Details
04-18-2013
4.50
Riveted nutplates to wheel pants.
Details
04-17-2013
6.00
Epoxied interface fairings to main wheel pants.
Details
04-16-2013
5.00
Sanding, drilling, & more work on pants.
Details
04-15-2013
4.00
Finished (maybe) the oil filler door.
Details
04-14-2013
5.00
More intersection fairing work & oil filler door i
Details
04-13-2013
6.50
Worked on leg-to-wheel pant intersection fairings.
Details
04-12-2013
5.00
Worked on main gear leg & interface fairings.
Details
04-11-2013
4.00
Temporarily attached interface fairings.
Details
04-10-2013
4.00
Redrilled and cut on the reinforced wheel pants.
Details
04-09-2013
6.50
Reinforced inside of wheel pants.
Details
04-08-2013
4.50
Corrected wheel pant mistake.
Details
04-07-2013
7.00
Still working on main wheel pants.
Details
04-04-2013
8.00
Another day of wheel pant work.
Details
04-03-2013
6.00
More wheel pants work
Details
04-02-2013
6.00
Started work on main gear wheel pants.
Details
03-28-2013
3.50
Rigged floor jack to lift plane off main gear.
Details
03-27-2013
5.50
More work on nose gear fairings.
Details
03-26-2013
7.00
Installed gear leg fairing hinges.
Details
03-23-2013
3.00
More thinking on gear leg fairings.
Details
03-22-2013
5.00
Continued gear leg fairing work.
Details
03-21-2013
4.00
Started on main gear leg fairings.
Details
03-20-2013
5.00
Added piano hinge to nose gear leg fairing.
Details
03-19-2013
6.00
Nose wheel pant and leg fairing work.
Details
03-17-2013
5.50
More nose wheel pant work.
Details
03-16-2013
7.00
Nose wheel pant work.
Details
03-13-2013
3.00
Riveted #4 baffle and then went flying.
Details
03-12-2013
4.00
Started on nose wheel pant.
Details
03-01-2013
4.00
More measurements before the cut.
Details
01-31-2013
20.00
Set up shop in the hangar.
Details
01-24-2013
3.00
Moved fuselage to a hangar at KGTU in Georgetown,
Details
08-13-2012
3.00
Rearranged garage to hang engine.
Details
07-18-2012
4.00
Installed new Matco nose wheel axle.
Details
07-07-2012
5.00
Brake work.
Details
09-29-2011
4.00
Trial run on wingtip cut-out reflector.
Details
09-27-2011
4.00
Finished cradles.
Details
09-26-2011
4.00
Floxing the cradle.
Details
09-19-2011
4.00
Cradle building.
Details
09-05-2011
4.00
Continuing building the cradle.
Details
09-01-2011
4.00
More landing light cradle building.
Details
08-23-2011
4.00
Landing/taxi light cradle development.
Details
08-20-2011
4.00
Set up model on the workbench.
Details
08-18-2011
5.00
CAD drawing of the tip cut-out grid.
Details
05-26-2011
6.00
Made brackets for Safety Trim modules.
Details
05-25-2011
4.00
Tech counselor visit to inspect wiring.
Details
05-22-2011
3.00
Installed enter/exit rollbar handles.
Details
05-11-2011
1.00
Gluing zip tie mount experiments.
Details
04-04-2011
1.00
Ordered firewall insulation materials.
Details
03-31-2011
4.00
Firewall insulation researched.
Details
08-19-2010
5.00
Added more to the Pitot/Static system.
Details
07-26-2010
4.00
Installed subpanel engine controls bracket.
Details
07-24-2010
3.00
Finished wiring the E-bus Alt Feed Relay.
Details
05-12-2010
1.00
Added springs to Matco master brakes.
Details
06-02-2009
4.00
Searching for best avionics prices.
Details
06-01-2009
3.00
Hangar rental
Details
04-09-2009
3.00
More electrical system design and fun.
Details
07-31-2007
2.50
Moved fuselage from garage to store it on the deck
Details
07-26-2007
8.00
Built my fuselage rotisserie.
Details
07-24-2007
3.00
Analyzed fuselage layout (Dwg 17A) to find axis of
Details
07-16-2007
1.50
Quick Build Wings and Fuselaged Delivered.
Details
07-09-2007
4.00
Finished building wing cradle.
Details
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
720
3309
Avionics
40
188
Cowling
11
54
Electrical System
113
524
Empennage
68
306
Engine
50
228
Fuselage
195
867
Instrument Panel
33
164
Miscellaneous
120
581
Wings
90
397