Work Logs Found: 120
Category Work Time: 581 Hours
 Date
Hours
Work Log Summary

Details

 10-05-2013
2.00
Airworthiness Inspection Completed
Details
     

 09-18-2013
5.00
Installing interior materials & carpet.
Details
     

 09-11-2013
4.00
Added hinges to baggage floor for tie downs.
Details
       

 09-05-2013
4.00
Added a fire extinguisher and installed the GPS.
Details
       

 09-03-2013
5.50
Unwired stick fuel boost switches.
Details
       

 08-31-2013
3.50
Charlotte applied N numbers to fuselage.
Details
       

 08-23-2013
3.50
Installed Kroger sun shade.
Details
       

 08-14-2013
8.00
Programed Dynon and applied labels to panel.
Details
       

 08-03-2013
4.00
Checked fuel boost pump operation.
Details

 07-28-2013
3.00
Removed and replaced leaking brake fitting.
Details
       

 07-27-2013
3.50
Uploaded a new Dynon firmware update.
Details
       

 07-26-2013
4.00
Installed alternate static air source.
Details
       

 07-21-2013
10.00
Cut the sticks shorter.
Details
       

 07-15-2013
4.00
Bled the brakes & removed windshield protection.
Details
       

 07-14-2013
6.00
Painted canopy bow aluminum band.
Details
       

 07-13-2013
5.00
Applied the primer to the windshield layups.
Details
       

 07-12-2013
4.00
Removed tape from the windshield layup.
Details
       

 07-11-2013
8.00
Windshield layup filling, sanding, & priming.
Details
       

 07-08-2013
4.00
Windshield sand & fill, fill & sand.
Details
       

 07-05-2013
4.00
Sanded edges & added glass beads.
Details
       

 07-03-2013
5.00
Sanding the windshield layup.
Details
       

 07-02-2013
6.50
Filling and sanding the windshield.
Details
       

 07-01-2013
4.50
The windshield fiberglass layup.
Details
       

 06-29-2013
3.50
Final prep on the windshield before the layup.
Details
       

 06-28-2013
4.50
Sanded flox and filled with Superfil.
Details
       

 06-27-2013
4.00
More prep for windshield installation.
Details
       

 06-26-2013
12.00
Preparation for windshield fiberglass layup.
Details
       

 06-23-2013
6.00
Installed glareshield cover & started taping.
Details
       

 06-22-2013
4.50
Removed windshield to prep for glareshield coverin
Details
       

 06-21-2013
6.00
Riveted, Superfiled, & visited with windshield adv
Details
       

 06-20-2013
5.00
Sanded elevator weights & sealed FW.
Details
       

 06-06-2013
5.00
Made false floor to rivet top forward skin.
Details
       

 06-05-2013
5.00
Located pitot tubes positions behind subpanel.
Details
       

 06-03-2013
4.00
Prepping to install the wings for naught.
Details

 05-31-2013
5.50
Sanded cowling filler and painted plenum.
Details
       

 05-30-2013
5.50
Filler on the cowling and drilled out rivets.
Details
       

 05-24-2013
2.50
Added nutplates for intersection fairings.
Details
       

 05-23-2013
5.00
Set breakout force on nose gear fork.
Details
       

 05-22-2013
4.00
Marked wheel pants for tire inflation holes.
Details
     

 05-18-2013
6.00
Final plenum angles riveted.
Details
       

 05-17-2013
5.00
Shortened right air inlet ramp.
Details
       

 05-16-2013
4.50
Riveted angle to left side baffle and inlet.
Details
       

 05-15-2013
5.00
Removed conical gusset from right inlet.
Details
       

 05-13-2013
5.00
Riveted last side angles to plenum.
Details
       

 05-11-2013
8.00
Finished most angles for the plenum.
Details
       

 05-06-2013
5.00
Riveted part of the plenum.
Details
       

 05-05-2013
6.50
Wheel pant and plenum work.
Details
       

 05-04-2013
5.50
Match drilled plenum angles to the baffles.
Details
       

 05-03-2013
4.00
Plenum angle trimming and fitting.
Details
       

 05-01-2013
6.00
Sanded wheel pants and drilled plenum flange.
Details
       

 04-30-2013
5.50
Last coat of micro beads on fairings.
Details
       

 04-29-2013
4.00
I sanded to smooth the intersection fairings.
Details
       

 04-28-2013
5.00
Spread glass beads onto the intersection fairings.
Details
       

 04-27-2013
5.00
Used flox to cover the fairing juncture gap.
Details
       

 04-26-2013
4.50
Prepped wheel pants for fairing gap filler.
Details
       

 04-25-2013
5.00
More work on the plenum.
Details
       

 04-24-2013
5.00
Glassed the wheel pant intersection f
Details
       

 04-23-2013
4.50
Trimmed molded plenum.
Details
       

 04-21-2013
7.00
Riveting baffle clips on forward baffles and inlet
Details
       

 04-19-2013
4.50
Sanded on oil filler door install and riveted righ
Details
       

 04-18-2013
4.50
Riveted nutplates to wheel pants.
Details
       

 04-17-2013
6.00
Epoxied interface fairings to main wheel pants.
Details
       

 04-16-2013
5.00
Sanding, drilling, & more work on pants.
Details
       

 04-15-2013
4.00
Finished (maybe) the oil filler door.
Details
       

 04-14-2013
5.00
More intersection fairing work & oil filler door i
Details
       

 04-13-2013
6.50
Worked on leg-to-wheel pant intersection fairings.
Details
       

 04-12-2013
5.00
Worked on main gear leg & interface fairings.
Details
       

 04-11-2013
4.00
Temporarily attached interface fairings.
Details
       

 04-10-2013
4.00
Redrilled and cut on the reinforced wheel pants.
Details
       

 04-09-2013
6.50
Reinforced inside of wheel pants.
Details
       

 04-08-2013
4.50
Corrected wheel pant mistake.
Details
     

 04-07-2013
7.00
Still working on main wheel pants.
Details
       

 04-04-2013
8.00
Another day of wheel pant work.
Details
       

 04-03-2013
6.00
More wheel pants work
Details
       

 04-02-2013
6.00
Started work on main gear wheel pants.
Details
       

 03-28-2013
3.50
Rigged floor jack to lift plane off main gear.
Details
       

 03-27-2013
5.50
More work on nose gear fairings.
Details
       

 03-26-2013
7.00
Installed gear leg fairing hinges.
Details
       

 03-23-2013
3.00
More thinking on gear leg fairings.
Details
     

 03-22-2013
5.00
Continued gear leg fairing work.
Details
       

 03-21-2013
4.00
Started on main gear leg fairings.
Details
       

 03-20-2013
5.00
Added piano hinge to nose gear leg fairing.
Details
       

 03-19-2013
6.00
Nose wheel pant and leg fairing work.
Details
       

 03-17-2013
5.50
More nose wheel pant work.
Details
       

 03-16-2013
7.00
Nose wheel pant work.
Details
       

 03-13-2013
3.00
Riveted #4 baffle and then went flying.
Details
     

 03-12-2013
4.00
Started on nose wheel pant.
Details
       

 03-01-2013
4.00
More measurements before the cut.
Details
       

 01-31-2013
20.00
Set up shop in the hangar.
Details
       

 01-24-2013
3.00
Moved fuselage to a hangar at KGTU in Georgetown,
Details
       

 08-13-2012
3.00
Rearranged garage to hang engine.
Details
       

 07-18-2012
4.00
Installed new Matco nose wheel axle.
Details
       

 07-07-2012
5.00
Brake work.
Details
       

 09-29-2011
4.00
Trial run on wingtip cut-out reflector.
Details
     

 09-27-2011
4.00
Finished cradles.
Details
       

 09-26-2011
4.00
Floxing the cradle.
Details
       

 09-19-2011
4.00
Cradle building.
Details
       

 09-05-2011
4.00
Continuing building the cradle.
Details
       

 09-01-2011
4.00
More landing light cradle building.
Details
       

 08-23-2011
4.00
Landing/taxi light cradle development.
Details
       

 08-20-2011
4.00
Set up model on the workbench.
Details
       

 08-18-2011
5.00
CAD drawing of the tip cut-out grid.
Details
       

 05-26-2011
6.00
Made brackets for Safety Trim modules.
Details
       

 05-25-2011
4.00
Tech counselor visit to inspect wiring.
Details
       

 05-22-2011
3.00
Installed enter/exit rollbar handles.
Details
       

 05-11-2011
1.00
Gluing zip tie mount experiments.
Details

 04-04-2011
1.00
Ordered firewall insulation materials.
Details

 03-31-2011
4.00
Firewall insulation researched.
Details

 08-19-2010
5.00
Added more to the Pitot/Static system.
Details
     

 07-26-2010
4.00
Installed subpanel engine controls bracket.
Details
       

 07-24-2010
3.00
Finished wiring the E-bus Alt Feed Relay.
Details
       

 05-12-2010
1.00
Added springs to Matco master brakes.
Details
       

 06-02-2009
4.00
Searching for best avionics prices.
Details

 06-01-2009
3.00
Hangar rental
Details

 04-09-2009
3.00
More electrical system design and fun.
Details
       

 07-31-2007
2.50
Moved fuselage from garage to store it on the deck
Details
       

 07-26-2007
8.00
Built my fuselage rotisserie.
Details
       

 07-24-2007
3.00
Analyzed fuselage layout (Dwg 17A) to find axis of
Details
       

 07-16-2007
1.50
Quick Build Wings and Fuselaged Delivered.
Details
       

 07-09-2007
4.00
Finished building wing cradle.
Details