KitLog pro

Powered By Kitlog Pro v2.0

KENNETH T.'S WEB SITE
Work Logs Found: 90
Category Work Time: 397 Hours
 Date
Hours
Work Log Summary

Details

 07-25-2013
5.00
Installed wingtips.
Details
       

 07-24-2013
6.00
Aligned the ailerons.
Details
       

 07-23-2013
5.00
Flap rod adjustments.
Details
       

 07-22-2013
4.00
Wing work.
Details
       

 07-17-2013
6.00
Both wings on.
Details
       

 07-16-2013
5.50
Installed the left wing.
Details
       

 05-21-2012
12.00
Finished right wing and stored in cradle.
Details
       

 05-16-2012
2.00
Cut and flared fuel tube for left wing.
Details
     

 05-15-2012
5.00
Installed nutplates on wing for the fairing.
Details
       

 05-14-2012
5.50
Installed wing root fairing then removed.
Details
       

 05-11-2012
4.00
Fabricated fuel tank vent tube.
Details
     

 05-07-2012
4.00
Flap actuating rod installed.
Details
       

 05-03-2012
4.00
Fuel tank attach bracket installed.
Details
     

 05-01-2012
7.00
Installed right wing and drilled aft spars.
Details
       

 04-26-2012
4.00
Left wing moved to garage & installed.
Details
       

 04-19-2012
3.00
Fabricated drill guides of drilling rear spars.
Details
     

 04-16-2012
3.50
Drilled out QB wing rivets on inboard rib.
Details
       

 04-09-2012
4.00
Practiced driving drift pins into carrythru spar.
Details
       

 04-06-2012
4.00
Trimmed wing rear spars.
Details
       

 04-04-2012
4.00
Repositioned fuselage for wing attachment.
Details
       

 03-15-2012
4.00
Rewired Aveo 6-in-1 lights.
Details
       

 03-14-2012
6.00
Reinstalled Aveo 6-in-1 wingtip light modules.
Details
       

 02-15-2012
2.00
Functional test of Aveo 6-in-1 lights.
Details

 02-14-2012
2.00
Connected wire bundles to terminal blocks.
Details
       

 02-13-2012
4.00
Made wire bundles for attaching to lights.
Details
       

 02-12-2012
4.00
Wing wires attached to terminal blocks.
Details
     

 02-11-2012
4.00
Started wiring wingtip lights.
Details
       

 02-08-2012
3.50
Fabricated right wingtip cutout lens.
Details
       

 02-07-2012
4.50
Cut wingtip lenses and fabbed the left tip lens.
Details
       

 02-06-2012
3.00
Shimed the foam rib on right wingtip.
Details
     

 02-03-2012
4.00
Cut out foam wingtip ribs and glued.
Details
       

 02-02-2012
5.50
Flap hinge loops cutout for pins insertion.
Details
       

 02-01-2012
6.00
Started designing a foam rib to strengthen fibergl
Details
       

 01-29-2012
3.00
Finished installing nutplates on wingtips.
Details
       

 01-26-2012
4.00
Fabbed laning/taxi/strobe light reflector.
Details
       

 01-25-2012
5.00
Riveted nutplates and dimpled wing skins.
Details
       

 01-23-2012
4.00
Drilled nutplate holes onto wingtips.
Details
       

 01-22-2012
4.00
Matchdrilled strip and wingtip end tip.
Details
       

 01-21-2012
5.00
Added reinforcing srtips to wingtips.
Details
       

 01-19-2012
4.50
Cut left wingtip to aileron gap and matchdrilled.
Details
       

 01-18-2012
4.00
Marked left wingtip for aileron gap.
Details

 01-17-2012
4.00
Prepping wingtip for installation
Details
       

 01-15-2012
9.00
Finished riveting last skin on the right wing.
Details
       

 01-12-2012
4.50
Finished riveting left wing and installed pitot.
Details
       

 01-11-2012
4.00
More riveting.
Details
     

 01-10-2012
5.00
More left wing skin riveting.
Details
       

 01-09-2012
3.00
Started riveting last skin on left wing.
Details
       

 01-08-2012
3.00
Redoing pitot heat wiring and tubing.
Details
       

 01-05-2012
6.00
Fabricated "aileron stop" bushings.
Details
       

 01-03-2012
4.00
Removed aluminum aileron stops.
Details
       

 11-30-2011
4.00
Added wiring conduit clamps
Details
       

 11-27-2011
1.00
Moved wings into garage.
Details

 11-17-2011
3.50
Moved left wing to deck and wired the right wing.
Details

 11-16-2011
2.00
Scarf joint problem solved.
Details

 11-14-2011
4.50
Added nutplates to wing skin access hole.
Details
       

 11-12-2011
4.00
Continuity check of wiring & pitot ops check.
Details
     

 11-11-2011
4.00
Added wingtip lighting wires.
Details
       

 11-08-2011
6.00
Pitot installation continued.
Details
       

 11-04-2011
4.00
Secured PVC wiring conduit in the wings.
Details
       

 11-02-2011
4.00
Started Dynon pitot/heat installation.
Details
       

 07-05-2011
3.00
Resealed right wing tank.
Details
       

 10-29-2008
5.00
Installed Dynon AP servo in right wing.
Details
       

 10-25-2008
3.00
Started installing pitot line in left wing.
Details

 05-29-2008
4.00
Installed fuel pickup tubes & quantity sensors.
Details
       

 05-03-2008
3.00
Prepared Fuel Sensors for Wing Fuel Tanks.
Details
       

 04-23-2008
3.00
Mounted Dynon Pitot Heater Control Box
Details
       

 04-15-2008
3.00
Drilled and tapped Dynon pitot.
Details
       

 04-14-2008
4.50
Cut streamline pitot hole, deburred, dimpled, prim
Details
       

 04-13-2008
6.00
Riveted bracket & preped pitot mounting plates.
Details
       

 04-12-2008
2.00
Dimpled Lower Wing Spars, Ribs, and Skins
Details
       

 04-11-2008
5.00
Back Drilled Lower Outboard Right Wing Skin
Details

 04-10-2008
5.00
Prep to Install Dynon Heated AOA Pitot
Details
       

 09-10-2007
3.00
Charlotte and I riveted the aileron gap fairings.
Details
       

 09-07-2007
6.50
Prepped and riveted left flap brace and hinge.
Details
       

 09-04-2007
6.00
Prepped and riveted right flap brace & hinge.
Details
       

 09-03-2007
6.50
Riveted outboard aileron hinge brackets.
Details
       

 09-01-2007
4.50
Attached aileron hardware & drilled oversize holes
Details
       

 08-31-2007
2.50
Drilled aileron attach hardware.
Details
     

 08-28-2007
6.50
Set inbd. aileron brackets and prepped flap brace.
Details
       

 08-27-2007
5.00
Drilled the aileron hinge brackets to rear spar.
Details

 08-25-2007
6.00
Riveted and primed aileron push rods.
Details
       

 08-24-2007
6.50
Drilled Aileron pushrod and rod ends.
Details
       

 08-14-2007
3.50
Finished drilling wing wiring holes and cut ailero
Details
       

 08-11-2007
4.00
Installed aileron bellcranks onto QB wings.
Details
     

 08-10-2007
3.00
Drilled wiring conduit holes on the right wing.
Details
     

 08-09-2007
6.00
Started drilling wing wiring conduit holes in the
Details
       

 08-08-2007
4.00
Drilled out and reriveted 3 rivet in aileron hinge
Details
       

 08-07-2007
6.00
Assembled the aileron hinges.
Details
       

 07-23-2007
4.00
Inventoried parts for QB wings and fuselage.
Details
       

 06-15-2007
4.00
Started constructing Wing Cradle while waiting for
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.